1、Lessons Learned Entry: 0886Lesson Info:a71 Lesson Number: 0886a71 Lesson Date: 2000-04-27a71 Submitting Organization: JPLa71 Submitted by: David OberhettingerSubject: Mission Assurance During Mars Climate Orbiter Operations (1999) Abstract: Although a mission assurance manager was assigned to MCO du
2、ring project development, there was no independent mission assurance function established for the work performed at JPL following launch. Require an independent Mission Assurance representative during the operational phase of every flight project. This individual should become familiar with and inte
3、grated into the project during the latter phases of development, and possess independent responsibility to verify compliance with design and operational requirements. Require all flight projects to report and track post-launch anomalies on ISAs. Project management should rigidly enforce this require
4、ment and maintain a disciplined disposition, tracking and resolution process. Description of Driving Event: Although a mission assurance manager (MAM) was assigned to Mars Climate Orbiter (MCO) during project development, there was no independent mission assurance function established for the work p
5、erformed at JPL following launch. The decision whether to have a project-level mission assurance function during the operations phase was previously at the discretion of the JPL project manager. The JPL Mission Assurance Management and Independent Assessment process now requires a Mission Assurance
6、representative for all flight mission operational phases.A lack of continuous mission assurance oversight was noted by the JPL MCO review board. Contrary to established practice:a71 The spacecraft was launched without end-to-end testing to validate Angular Momentum Desaturation (AMD) file compatibil
7、ity with the ground-data system navigation software. The Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-JPL MCO review board identified file incompatibility as the root cause of the MCO mission loss.a71 Discrepancies between the delta-Vs expected by
8、 the Navigation Team and those produced by the AMD file were observed during mission operations. However, no Incident/Surprise/Anomaly report (ISA) or Problem/Failure Report (PFR) was ever written on this issue. The Navigation Team documented the issue in an e-mail and attempted to resolve it inform
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS08862000LESSONSLEARNEDMISSIONASSURANCEDURINGMARSCLIMATEORBITEROPERATIONS1999PDF

链接地址:http://www.mydoc123.com/p-1018532.html