《NAVY UFGS-41 22 23 19-2008 MONORAIL HOISTS《单轨吊车(代替 NAVY UFGS-41 22 03 13 20 NAVY UFGS-41 22 03 16 20 NAVY UFGS-41 22 03 19 20)》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-41 22 23 19-2008 MONORAIL HOISTS《单轨吊车(代替 NAVY UFGS-41 22 03 13 20 NAVY UFGS-41 22 03 16 20 NAVY UFGS-41 22 03 19 20)》.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-41 22 23.19 (April 2008)-Preparing Activity: NAVFAC SupersedingUFGS-41 22 23.19 10 (April 2006)UFGS-41 22 03.13 20 (April 2006)UFGS-41 22 03.16 20 (April 2006)UFGS-41 22 03.19 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with
2、UMRL dated April 2008*SECTION TABLE OF CONTENTSDIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENTSECTION 41 22 23.19MONORAIL HOISTS04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Design Data: Structural Design Calculations1.2.2 Design Requirements1.2.2.1 Track Welding1.2.2.2 Trade
3、 Coordination1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Certificates: Load ChainWire Rope1.4.2 Pre-Erection Inspection1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery and Storage1.5.2 Handling1.6 MAINTENANCEPART 2 PRODUCTS2.1 IDENTIFICATION PLATES2.2 OVERHEAD MONORAIL SYSTEM2.2.1 Capacity and Speed2.
4、2.2 Material and Design Requirements2.2.3 Safety2.3 MONORAIL TRACK SYSTEM2.3.1 Quick Shutoff2.3.2 Track Beam System2.3.3 Track Suspension System2.4 MANUAL HOIST2.5 ELECTRIC WIRE ROPE HOIST2.5.1 Hoisting Ropes2.5.2 Sheaves2.5.3 DrumSECTION 41 22 23.19 Page 1Provided by IHSNot for ResaleNo reproductio
5、n or networking permitted without license from IHS-,-,-2.6 ELECTRIC CHAIN HOIST2.7 AIR POWERED WIRE ROPE HOIST2.7.1 Hoist Wire Rope2.7.2 Sheaves2.7.3 Drum2.8 AIR POWERED CHAIN HOIST2.9 TROLLEY2.10 MOTORS2.10.1 Trolley Motors2.10.2 Hoist Motors2.10.3 Adjustable Frequency Drive Controls2.10.3.1 Trolle
6、y Electric Drive2.10.3.2 Hoist Electric Drive2.10.3.3 Electric Drive Speed Control2.10.3.4 Dynamic Braking2.11 CONTROLS2.12 LIMIT SWITCHES2.13 BRAKES2.13.1 Hoist Load Brake2.13.2 Air Hoist Brake2.13.3 Spring Applied Hoist Brake2.13.4 Trolley Brake2.14 LOAD BLOCK AND HOOK2.14.1 Non-Destructive Testin
7、g2.14.2 Hook and Hook Nut Magnetic Particle Inspections2.15 BEARINGS2.16 ELECTRIFICATION2.17 PAINTING SYSTEMPART 3 EXECUTION3.1 ERECTION AND INSTALLATION3.2 ERECTION SERVICES3.3 FIELD QUALITY CONTROL3.3.1 Post-Erection Inspection3.3.2 Operational Tests3.3.3 Test Data3.3.4 Hook Tram Measurement3.3.5
8、No-Load Test3.3.6 125% Rated Load Test3.3.7 Rated Load Speed Test3.4 MONORAIL FIELD TEST PROCEDURES3.4.1 General Instructions3.4.2 Equipment Monitoring3.4.3 Hooks3.4.4 Preparing For Load Testing3.4.5 Precautions During Load Testing3.4.6 Testing3.4.6.1 No Load Test3.4.6.2 Hoist Load Testing3.4.6.3 10
9、0 Percent of Rated Capacity (+0%, -5%) Load Test3.4.6.4 125 Percent of Rated Capacity (+5%, -0%) Load Test- End of Section Table of Contents -SECTION 41 22 23.19 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UF
10、GS-41 22 23.19 (April 2008)-Preparing Activity: NAVFAC SupersedingUFGS-41 22 23.19 10 (April 2006)UFGS-41 22 03.13 20 (April 2006)UFGS-41 22 03.16 20 (April 2006)UFGS-41 22 03.19 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2008*SECTION 41 2
11、2 23.19MONORAIL HOISTS04/08*NOTE: This guide specification covers the requirements for monorail hoists with manual, electric, or air powered lifting chains or wire rope; with or without manual, electric or air powered trolleys and other accessories.Edit this guide specification for project specific
12、requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are w
13、elcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specific
14、ation includes tailoring options for LANTDIVENGCOM, NASA, NAVFAC, and USACE. Selection or deselection of a tailoring option (select view-tailoring options) will include or exclude that option in the section. Specific project editing is still required for the resulting section.*PART 1 GENERAL*NOTE: T
15、his guide specification is not to be used SECTION 41 22 23.19 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-for monorail systems that operate in hazardous areas as defined in the National Electrical Code, or for nonstandard monorail systems t
16、hat handle hot metals, ordnance, or fissionable materials.NOTE: Forward all procurement of monorail systems at Naval Shore based activities with rated capacities of 20,000 lbs or greater, or for use in specialized applications, to: Naval Facilities Engineering Command, Navy Crane Center, Building 49
17、1, Norfolk Naval Shipyard, Portsmouth, Virginia, 23709-5000.(See NAVFAC Instruction 11450.1a, 22 January 1997.)NOTE: Show the following information on the project drawings:1. Sketch of monorail hoist, hook, and trolley system, including data.2. Runway track system.3. Electrical junction box location
18、 (including mounting height).*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the R
19、eference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be
20、deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERIC
21、AN INSTITUTE OF STEEL CONSTRUCTION (AISC)AISC 348 (2000) Structural Joints Using ASTM A325 or A490 BoltsSECTION 41 22 23.19 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-AMERICAN WELDING SOCIETY (AWS)AWS D1.1/D1.1M (2006; Errata 2006) Structu
22、ral Welding Code - SteelASME INTERNATIONAL (ASME)ASME B30.11 (2004) Monorails and Underhung Cranes - Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and SlingsASME B30.16 (2007) Overhead Hoists (Underhung)Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS412223192008MONORAILHOISTS 单轨 吊车 代替 NAVYUFGS4122031320NAVYUFGS4122031620NAVYUFGS4122031920PDF

链接地址:http://www.mydoc123.com/p-984872.html