NAVY UFGS-26 12 21-2013 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS.pdf
《NAVY UFGS-26 12 21-2013 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-26 12 21-2013 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCEC / NASA UFGS-26 12 21 (November 2013)-Preparing Activity: NAVFAC SupersedingUFGS-26 12 19.20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2013*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 12 21SINGLE-PHAS
2、E PAD-MOUNTED TRANSFORMERS11/13PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 DEFINITIONS1.4 SUBMITTALS1.4.1 Government Submittal Review1.4.2 Reduced Submittal Requirements1.5 QUALITY ASSURANCE1.5.1 Pad-Mounted Transformer Drawings1.5.2 Regulatory Requirements1.5.3 Standard Products1.5.3.1
3、Alternative Qualifications1.5.3.2 Material and Equipment Manufacturing Date1.6 MAINTENANCE1.6.1 Additions to Operation and Maintenance DataPART 2 PRODUCTS2.1 PRODUCT COORDINATION2.2 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS (DEAD-FRONT)2.2.1 Compartment Construction2.2.1.1 High Voltage2.2.1.2 Low Voltag
4、e2.2.2 Transformer2.2.2.1 Specified Transformer Efficiencies2.3 INSULATING LIQUID2.4 LIQUID-FILLED TRANSFORMER NAMEPLATES2.5 CORROSION PROTECTION2.6 WARNING SIGNS2.7 GROUNDING AND BONDING2.8 PADLOCKS2.9 CAST-IN-PLACE CONCRETE2.10 SOURCE QUALITY CONTROL2.10.1 Transformer Test Schedule2.10.2 Test Inst
5、rument CalibrationSECTION 26 12 21 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.10.3 Design Tests2.10.4 Routine and Other TestsPART 3 EXECUTION3.1 INSTALLATION3.2 GROUNDING3.2.1 Grounding Electrodes3.2.2 Pad-Mounted Transformer Grounding3.
6、2.3 Connections3.2.4 Grounding and Bonding Equipment3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES3.3.1 Meters and Current Transformers3.4 FIELD APPLIED PAINTING3.5 WARNING SIGN MOUNTING3.6 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES3.6.1 Cast-In-Place Concrete3.6.2 Sealing3.7 FIELD QUALITY CONTROL3.7.1 P
7、erformance of Acceptance Checks and Tests3.7.1.1 Pad-Mounted Transformers3.7.1.2 Current Transformers3.7.1.3 Watthour Meter3.7.1.4 Grounding System3.7.1.5 Surge Arresters, Medium- and High-Voltage3.7.2 Follow-Up Verification- End of Section Table of Contents -SECTION 26 12 21 Page 2Provided by IHSNo
8、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCEC / NASA UFGS-26 12 21 (November 2013)-Preparing Activity: NAVFAC SupersedingUFGS-26 12 19.20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October
9、2013*SECTION 26 12 21SINGLE-PHASE PAD-MOUNTED TRANSFORMERS11/13*NOTE: This guide specification covers the requirements for single-phase clam shell type and two-compartment type pad-mounted transformers of the dead-front type for exterior applications.Adhere to UFC 1-300-02 Unified Facilities Guide S
10、pecifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate inf
11、ormation.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: For Navy and Air Force project
12、s, this specification incorporates a “reduced shop drawing submittal process“ for listed manufacturers who previously satisfied reduced shop drawing submittal process requirements. This specification also includes unique routine and other test requirements, transformer loss certificate, transformer
13、test schedule, and field quality control acceptance tests and reports. The preparing activity, NAVFAC LANT, has significant experience and technical expertise in these areas. If Reach-back support during construction is desired, for a specific NAVFAC or Air Force project, the technical representativ
14、e (electrical engineer) editing this document for that project must contact the NAVFAC LANT Capital Improvements Electrical Engineering (Code CI47) Office for consultation during the design stage of SECTION 26 12 21 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without l
15、icense from IHS-,-,-the project, prior to including the requirement in the specification.*NOTE: Use the following related guide specifications for power distribution equipment:-Section 26 08 00 APPARATUS INSPECTION AND TESTING-Section 26 11 13.00 20 PRIMARY UNIT SUBSTATIONS-Section 26 11 16 SECONDAR
16、Y UNIT SUBSTATIONS-Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 13 00.00 20 SF6/HIGH-FIREPOINT FLUID INSULATED PAD-MOUNTED SWITCHGEARSection 26 20 00 INTERIOR DISTRIBUTION SYSTEM-Section 26 23 00 SWITCHBOARDS AND SWITCHGEAR-Section 26 27 13.10 30 ELECTRIC METERS-Section 26 27
17、14.00 20 ELECTRICITY METERING-Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTIONDo not use the following related guide specifications except for Army Civil Works projects. They have not been unified:-Section 26 11 14.00 10 MAIN ELECTRIC SUPPLY STATION AND SUBSTATION-Section 26 22 00.00 10 480-V
18、OLT STATION SERVICE SWITCHGEAR AND TRANSFORMERS-Section 26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS*NOTE: Coordination is required between this section and metering equipment specification sections. See Section 26 27 14.00 20 ELECTRICITY METERING or Section 26 27 13.10 30 ELEC
19、TRIC METERS for transformer and metering details, which are available in metric (SI) and U.S. Customary (IP) system dimension. Use these files to develop project specific drawings, including: File Name DescriptionPADMDE7 Single Phase, One Circuit with Surge ArrestersPADMDE8 Single Phase, Feed-Thru C
20、ircuit with Surge ArrestersARCFLASH Arc Flash Warning LabelTO DOWNLOAD DRAWINGSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.Select the appropriate Electrical .ZIP file(s) and extract the desired details.SECTION 26 12 21 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted
21、 without license from IHS-,-,-Do not include list of details, or details themselves, in project specifications. Insert the appropriate details on drawings and modify optional and blank items. If special features are required, do not modify details, but indicate these changes as notes below the detai
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2612212013SINGLEPHASEPADMOUNTEDTRANSFORMERSPDF

链接地址:http://www.mydoc123.com/p-984821.html