NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf
《NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-23 64 00-2009 PACKAGED WATER CHILLERS ABSORPTION TYPE《吸收型组合式冷水机》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 64 00 (August 2009)-Preparing Activity: NAVFAC Superseding UFGS-23 64 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL July 2009*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONINGSECTIO
2、N 23 64 00PACKAGED WATER CHILLERS, ABSORPTION TYPE08/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SAFETY REQUIREMENTS1.4 DELIVERY, STORAGE, AND HANDLING1.5 PROJECT REQUIREMENTS1.5.1 Verification of Dimensions1.5.2 Drawings1.6 WarrantyPART 2 PRODUCTS2.1 STANDARD COMMERCIAL PRODUCTS2.2 NAMEPLATES2.
3、3 ELECTRICAL WORK2.4 CHILLER COMPONENTS2.4.1 Tools2.5 ABSORPTION WATER CHILLER2.5.1 General2.5.2 Assembly2.5.3 Operation2.5.4 Components2.5.4.1 Absorber, Evaporator, Condenser Std 15 Errata 2007, 2009, Std 34 Errata 2007, 2008, Addenda a-y, aa-ae) ANSI/ASHRAE Standard 15-Safety Standard for Refriger
4、ation Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of RefrigerantsAMERICAN WELDING SOCIETY (AWS)AWS Z49.1 (2005) Safety in Welding, Cutting and Allied ProcessesASME INTERNATIONAL (ASME)ASME BPVC SEC VIII D1 (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VI
5、II, Pressure Vessels Division 1 - Basic CoverageASTM INTERNATIONAL (ASTM)ASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile StrengthASTM B 395/B 395M (2008) Standard Specification for U-Bend Seamless Copper and Copper Alloy Heat Exchanger and Condenser Tub
6、esASTM E 84 (2009a) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM F 104 (2003) Standard Classification System for Nonmetallic Gasket MaterialsNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (2007; Errata 2008) Standard for Motors SECTION 23 64 00 Pa
7、ge 4Provided by IHSNot for Resale-,-,-and GeneratorsNEMA MG 11 (1977; R 2007) Energy Management Guide for Selection and Use of Single Phase MotorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 54 (2008) National Fuel Gas Code1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Sect
8、ion 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submi
9、ttals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government
10、 approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Enginee
11、ring Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or ch
12、oose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office
13、 that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsDrawings; G; G, _Drawings provided in adequate detail to demonstrate compliance with contract requirements, as specified.SECTION 23 64 00 P
14、age 5Provided by IHSNot for Resale-,-,-SD-03 Product DataAbsorption Water Chiller; G; G, _Manufacturers standard catalog data, prior to the purchase or installation of a particular component, highlighted to show material, size, options, performance charts and curves, etc. in adequate detail to demon
15、strate compliance with contract requirements. Data shall include manufacturers recommended installation instructions and procedures. Data shall be adequate to demonstrate compliance with contract requirements as specified within the paragraphs:a. Packaged Water Chiller, Absorption Typeb. Chiller Com
16、ponentsc. AccessoriesIf vibration isolation is specified for a unit, vibration isolator literature shall be included containing catalog cuts and certification that the isolation characteristics of the isolators provided meet the manufacturers recommendations.*NOTE: Choose this bracketed section for
17、Army projects only.*Posted Instructions; G; G, _Posted instructions including equipment layout, wiring and control diagrams, piping, valves and control sequences, and typed condensed operation instructions. The condensed operation instructions shall include preventative maintenance procedures, metho
18、ds of checking the system for normal and safe operation, and procedures for safely starting and stopping the system. The posted instructions shall be framed under glass or laminated plastic and be posted where indicated by the Contracting Officer.Verification of Dimensions; G; G, _A letter including
19、 the date the site was visited, conformation of existing conditions, and any discrepancies found.System Performance Tests; G; G, _A schedule, at least 2 _ weeks prior to the start of related testing, for the system performance tests. The schedules shall identify the proposed date, time, and location
20、 for each test.DemonstrationsA schedule, at least 2 _ weeks prior to the date of the proposed training course, which identifies the date, time, and location for the training.Absorption water chiller - field acceptance test planSECTION 23 64 00 Page 6Provided by IHSNot for Resale-,-,-SD-06 Test Repor
21、tsField Acceptance Testing; G; G, _Absorption water chiller - field acceptance test report; G; G, _System Performance Tests; G; G, _SD-07 CertificatesAbsorption Water Chiller; G; G, _Where the system, components, or equipment are specified to comply with requirements of AGA, NFPA, ARI, ASHRAE, ASME,
22、 or UL, proof of such compliance shall be provided. The label or listing of the specified agency shall be acceptable evidence. In lieu of the label or listing, a written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that the items
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2364002009PACKAGEDWATERCHILLERSABSORPTIONTYPE 吸收 组合式 冷水机 PDF

链接地址:http://www.mydoc123.com/p-984809.html