1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 33 29 (May 2012)-Preparing Activity: NAVFAC SUPERSEDINGUFGS-01 33 29 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 33 29LEED(TM)
2、 DOCUMENTATION05/12PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DESCRIPTION1.3.1 Credit Validation1.3.2 Contractor Responsibilities1.4 LEED IMPLEMENTATION PLAN1.5 LEED DOCUMENTATION NOTEBOOK1.5.1 Content1.5.2 LEED Calculations1.5.3 Submittals1.6 REQUIREMENTS1.6.1 Materials and Resources Credit 3, M
3、aterials Reuse1.6.2 Materials and Resources Credit 4, Recycled Content1.6.2.1 Calculations1.6.2.2 Substitutions1.6.3 Materials and Resources Credit 5, Regional Materials1.6.3.1 Calculations1.6.4 Materials and Resources Credit 6, Rapidly Renewable Materials1.6.5 Materials and Resources Credit 7, Cert
4、ified Wood1.6.5.1 CalculationsPART 2 PRODUCTSPART 3 EXECUTION3.1 COORDINATION MEETINGS3.2 TABLE- End of Section Table of Contents -SECTION 01 33 29 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 33 29 (Ma
5、y 2012)-Preparing Activity: NAVFAC SUPERSEDINGUFGS-01 33 29 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION 01 33 29LEED(TM) DOCUMENTATION05/12*NOTE: This guide specification covers the requirements for providing documentation and
6、obtaining certain credits to acquire LEED(tm) or equivalent certification. Include this section in all Army construction projects requiring LEED. If project is not registered under LEED, equivalent green building systems may be used; modify title of section and content accordingly.Adhere to UFC 1-30
7、0-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable ite
8、ms(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).UFGS a
9、re intended for design-bid-build contracts; for design-build projects UFGS may require extensive editing by the designer. Navy design-build projects shall use NAVFAC Design-Build Master at www.wbdg.org/ndbm.*PART 1 GENERAL1.1 REFERENCES*NOTE: Issue (date) of references included in project specificat
10、ions need not be more current than provided by the latest guide specification. Use of SECTION 01 33 29 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SpecsIntact automated reference checking is recommended for projects based on older guide spe
11、cifications.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.FOREST STEWARDSHIP COUNCIL (FSC)FSC STD 01 001 (2000) Principles and Criteria for Forest StewardshipU.S. GREEN BUILDIN
12、G COUNCIL (USGBC)LEED (2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)LEED GBDC (2009) LEED Reference Guide for Green Building Design and ConstructionLEED NC (2009) Leadership in Energy and Environmental Design(tm) New Const
13、ruction Rating System1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those items that require Gove
14、rnment approval, due to their complexity or criticality, with a “G“. Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Governm
15、ent approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engi
16、neering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy projects.Submittal items not designated with a “G“ are SECTION 01 33 29 Page 3Provided by IHSNot for Re
17、saleNo reproduction or networking permitted without license from IHS-,-,-considered as being for information only for Army projects and for Contractor Quality Control approval for Navy projects.*NOTE: Identify all requirements throughout the technical sections with the marking “LEED.“ This will gene
18、rally be within the submittal requirements of the technical section; however, the products part or the execution part may also require some notation to differentiate those pieces of equipment/products/activities out of many listed that relate to LEED. Where additional data is required to validate a
19、LEED point (i.e., VOC content of paint), an additional submittal requirement will need to be included in the technical section.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information o
20、nly. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsLEED Implementation Plan; G; G, _SD-11 Closeo
21、ut SubmittalsLEED Documentation Notebook; G; G, _1.3 DESCRIPTION*NOTE: This specification includes an overview of all required LEED credits, LEED documentation requirements, and technical requirements for LEED credits not specified elsewhere. Where the term “LEED credit“ is used, it refers to both L
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0133292012LEEDTMDOCUMENTATIONPDF