NAVY MIL-R-81839-1977 RACK BOMB AIRCRAFT BRU-12 A《BRU-12 A型飞机炸弹机架》.pdf
《NAVY MIL-R-81839-1977 RACK BOMB AIRCRAFT BRU-12 A《BRU-12 A型飞机炸弹机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-81839-1977 RACK BOMB AIRCRAFT BRU-12 A《BRU-12 A型飞机炸弹机架》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-B1837 10 7777706 0360009 3 f- cs 0- - _- Mll-R-8 1839 (AS) 28 March 1977 MILITARY SPECIFICATION RACK, BOMB, AIRCRAFT; BRU-l2/A This specification is approved for use by the Naval Air Systems Command; Department of the Navy, and is available for use by all Departments and Agencies of the Depart
2、ment of Defense. 1. SCOPE , 1.1 Scope. This specification establishes the requirements for the manufacture and inspec- tion of one type of bomb rack capable of carrying and releasing 22.68 kilogram (50 pound) to 657.71 kilogram (1,450 pound) stores having suspension lugs spaced 355.6 millimeters (14
3、 inches) apart. The test limits in this specification define minimum acceptable capabilities. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent speci.
4、fied herein. SPEC1 FICATIONS Military MIL-T-7743 Testing, Store Suspension and Release Equipment; General Specification for Hooks, Bomb Rack, General Specification for MIL-H-8 5042 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving thi
5、s document should be addressed to: ENGINEERINQ SPECIFICATIONS AND STANDARDS DEPARTMENT (CODE 931 NAVAL AIR ENQINEERINQ CENTER, LAKEHURST, N.J. 08733, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter, THIS DOCU
6、MENT CONTAINS !a PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-STANDARDS Military MIL-R-1839 LO 9997906 03b001O T H MIL-STD- 100 Engineering Drawing Practices MIL-STD- 129 Marking for Shipment and Storage MILI-STD-130 MI L-STD- 143 Identific
7、ation Marking of US. Military Property Standards and Specifications, Order of Precedence for the = Selection of MIL-STD-704 Electric Power, Aircraft, Characteristics and Utilization of MI L-STD-794 Parts and Equipment, Procedures for Packaging and Packing of MIL-STD-831 Test Reports, Preparation of
8、MS3314. Lug, Suspension, 453.6 kg. (1,000 Ib) class, Airborne Equipment DRAWINGS Naval Air Systems Command DL909AS100 Data List, Test Fixture, BRU-12, 14, 15 and AERO 1A Adapter (Copies of specifications, standards, drawings, and publications required by suppliers in .connection with specific procur
9、ement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Order of precedence of specifications and standards. Should a conflict exist between any requirement in this specification and any requirement in the applicable documents referenced herein,
10、 the requirements of this specification shall take precedence over the referenced (applicable) document. 3. REQUIREMENTS e 3.1 First article. The bomb rack furnished under this specification shall be a product which has been inspected and passed the first article inspection specified herein (see 4.3
11、). 3.2 Selection of Specifications and standards. Specifications and standards for necessary commodities and services not specified herein shall be selected in accordance with MIL-STD-143. 3.3 Interchangeability. All parts having the same part number shall be directly and com- pletely interchangeabl
12、e with each other with respect to installation and performance. 3.4 Identification of parts. All parts Shall be marked as specified on the drawings listed in the data list for the bomb rack being procured, or in accordance with MIL-STD-130, if not specified on the drawings. The item identification a
13、nd part number requirements of MIL-STD-100 shall govern the part number and changes thereto. . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-R-81839(AS) 3.5 . Bomb rack. 3.5.1 Construction. The construction of the bomb rack shall be in accor
14、dance with the drawings listed in the data list for the bomb rack being procured and asspecified herein (see 6.2.lf). 3.5.2 Performance, The bomb rack, shall satisfy all performance requirements when sub- jected to the following inspections in the order specified in Tables I and II. a. b. C. d. e. f
15、. h. j. k. 1. m. 3.6 Electromechanical Component Inspecion (see 4.6.1) Bomb Rack Inspection (see 4.6.2) Functional Test (see 4.6.3) Arming Mechanism (see 4.6.4) Electrical Characteristics (see 4.6.5a) Lag Determination (see 4.6.5b) High-g Release (see 4.6.5) Sand (see 4.6.5d) Salt Spray (see 4.6.5e)
16、 Shock (see 4.6.50 Vibration (see 4.6.58) Life (see 4.6.5h) Static (see 4.65) Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in accordance with MIL-H-85042. 3.3 Workmanship. The workmanship displayed in fabrication and assembly of the bomb rack shall be such as to a
17、ssure, within design limitations, the ability of the bomb rack to meet performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, welding, heavy burrs, or parts assembled by introduction of high stresses not prescribed in the drawings, are typical s
18、igns of inferior workmanship and shall be cause for rejection. The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the governments notice of approval, shall be determinative of the requirements of the contract relative to workmanship. 4
19、. QUALITY ASSURANCE PROVISIONS (see 6.4) 4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as Specified herein. Except as otherwise Provided by IHSNot for ResaleNo reproduction or networking
20、 permitted without license from IHS-,-,-MIL-R-8 specified in MIL-R-G-839 LO b 0360032 3 M 839(AS) he contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the government. The government res
21、erves the right to perform any of the inspections set forth in the specification, where such inspections are deemed necessary to assure that the supplies and services conform to prescribed requirements. 4.2 Classification of inspection. The inspection of the bomb rack shall be classified as follows:
22、 a. b. First article inspection (see 4.3) Quality conformance inspection (see 4.4) 4.3 First article inspection. First article inspection shall consist of all of the inspections listed in Table I. First article inspection report format shall be in accordance with MIL-STD-831 (see 6.3). TABLE I FIRST
23、 ARTICLE INSPECTIONS - SCHEDULE AND SEQUENCE -.!/ TESTS Electromechanical Component Inspection Bomb Rack Inspection Functional Arming Mechanism Electrical. Characteristics Lag Determination High-g Release Sand Salt Spray Shock Vibration Life Static _ _ TEST PARAGRAPH 4.6.1 4.6.2 4.6.3 4.6.4 4.6.5a 4
24、.6.5b 4.6.5 4.6.5d 4.6.5e 4.6.5f 4.6.58 4.6.5h 4.6.5i SAMPLE See 2 1 2 3 X 4 X 5 6 X x 7 X L/ Inspection sequence is denoted by the numbers in the sample columns. An X denotes inspection not required. This requirement is applicable to all bomb rack inspections with the exception of arming mechanisms
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR818391977RACKBOMBAIRCRAFTBRU12ABRU12A 飞机 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981390.html