NAVY MIL-I-23453-1962 IGNITER MARK 188 MOD 0《MARK 188 MOD 0型点火器》.pdf
《NAVY MIL-I-23453-1962 IGNITER MARK 188 MOD 0《MARK 188 MOD 0型点火器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-23453-1962 IGNITER MARK 188 MOD 0《MARK 188 MOD 0型点火器》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、- 5 I MIL-1-23453 (WEP) 7 November 1962 .I MILITARY SPECIFICATION - . IGNITER, MARK 188 MOD 6 This specification has been approved by the Bureau of Naval Weapons, Department of the Navy I 1.1 Mk 188 Mod O. es the only classification covered by.this specification. Seo = Thisipecification cove -OS 103
2、79 i f- 1 OS 1 1334 Ignition Element, Mk 8 Mod 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I 1 _- _. MIL-1-23453 (WEP) STANDARDS MILITARY . . MIL-STO-105 : , . * MIL-STO-129 J MIL-STD-414 DRAWINGS BUREAU OF NAVAL WEAPONS 2 185553 2185554 2 1855
3、55 2185556 LD 537849 .e- Sampling Procedures _r and Tables for Inspection by Attributes Marking for Shipment and S tomg e Sampling Procedures and Tables for Inspection. by Variables Pcilletized Shipping Cori- tainer Unit Pack, Inside Shipping Container . Can, Inside Shipping Con- tainer Box, Outside
4、 Shipping Con- tainer . ._. . ic I i i Igniter, Rocket Motor Mark 188 Mod 0 Assembly, List of DtUWingS, Assemblies, Parts, . . and Specifications . -. . -i . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-!-23453 (WEP) J (When requesting any of
5、the applicable documents, refer to bot!, title and number. . Requests should be made via the cognizant Government Inspector. Copies of speci- fications and applicable documents required by contractors are available upon ap- plication to the Commanding Officer, Naval Supply Depot (Code CDS), 5801 Tab
6、or Avenue, Phildelphia 20, Pennsylvania. Copies of OS specifications and Ordnance drawings should be requested from the Commanding Officer, Naval Ordnance Depot, Louisville 14, Kentucky, Aftention: CTDO.) * 2.2 specification, unless otherwise indicated, the issue in effect on date of invitation for
7、bids shall apply to the extent specified herein. . Other Publications. - The following document forms a part of this INTERSTATE COMMERCE COMMISSION . 49 CFR 71- 70 Interstate Commerce Commission Rules and Regulations for the Transportution of Explosives and Other Dangerous Art i c I es (The Intersta
8、te Commerce Commission regulations are now a part of the Code of Fed- eral Regulations (1949 Edition - Revised 1950) wailable from the Superintendent of Documents, Government Printing Office, Washington 25, D.C. Orders for the a- bove publication should cite “49 CFR 71-78 (Rev. 1950)ii.) 3: REQUIREM
9、ENTS .3,1 Pre rduction Lot. - Unless otherwise specified by the procuring ccc.tiv;ty, the con-ore beginning large scale production under any contract or order, submit for testing in accordance with 4.4, a preproduction lot con- sisting of 31 igniters manufactured by the procedures proposed for use i
10、n the execution of the contract or order. Should the preproduction lot fail to comply witb the require- ments of this specification, the procuring activity my require the submission of a d -7 -_ -_ I- * .,- Each hours, t t Provided by IHSNot for ResaleNo reproduction or networking permitted without
11、license from IHS-,-,-. MIL-1-23453 (WEP) ._ 4.4.4.2.3 Performance Test. - After completion of the last cycleeach igniter shall be fired at 175F in.accordance with 4.6.2. The performance of . each unit shall comply with the requirements of 3.4. Accelerated Aging Tests. - Eight igniten shall be random
12、ly I - 4.4.5 selected from the preproduction lot and divided into two groups of four igniten each, designated Groups VI and VII. Each igniter in Group VI shall be stored igniter in Group VI1 shall be stored at 5OF for 30 days, then fired at -85OF in accordance wi“ 4.6.2. Th- perf ance of each ignite
13、r from Group VI and VI1 a!d I at 175OF for- thirty days, then fired at 175F in accordance with 4.6.2. Each . y wit1 the rcquiremsntr af 3.4. 1.4. z* Preproduction Test Report. Following completion of all pre- pioduction rats a report shall be submitted which will constitute a record of all informati
14、on pertaining to the. igniter tests. This report will normally be used QS a basis for approval of the preproduction test, and shall contain, but not neces- sarily be limited to, the following: (a) Description of tests (b) Chronological history of all events connected with testing (c) Analysis of res
15、ults (d) Conclusions and recommendations (e) All test data 4.5 . Acceptance Tests. 4.5.1 Non-destructive Testing. 4.5.1.1 Examination. - Each igniter delivered or tested that1 be ex- amined to assure quality of workmanship, use of proper materiais and ussembly, and absence of visual defects or other
16、 imperfections that would affect the Efe or function of the unit. I 4.5.1.2 - Electrical Resistance. - The electrical resistance of each ig- niter delivered or tested shall be determined and shall comply with the tequire- ments of 3.3. c 7 4 Provided by IHSNot for ResaleNo reproduction or networking
17、 permitted without license from IHS-,-,-I MIL-1-23453 (WEP) 4.5.1 i3 Dimensional Inspection. - A sample shall be selected from each lot in cor dance with the provisions of. MtL-SD-i!%, inspection level 11, nor- ml i.mpection, single sampling. The sample shall be inspected for compliance with oppiica
18、ble dimensional requirements of drawings listed in LD 537849 to ar. Accept- able Quality Level (AQL) of 1.5. 4.5.2 Performance Tests. - A sample shall be selected from each lot, test at -85F and +i75F8 in accordance with the provisions of MIL-STD-414, in- spection level IV, wrmal inspection with var
19、iability unknown-standard deviation method. fiach unit shall be tested in accordance with 4.6.2 and shall comply with the requirements of 3a4. Failure of the sample to comply with the acceptability limib for an AQl of 0.15 shall constitute rejection of the lot. 4 4.6 Test Methods. 4.6.1 . Electrical
20、 Resistance Test. - The resistance and continuity of the completed igniter shall be measured between the igniter grounding post and the ig= niter cable assembly. A resistance testiiig circuit which subjects the igniter to less than 10 milliamperes shall be used. Resistance measurements shall be made
21、 with a . suitable meter having an accuracy of * 0.005 ohms. 1.6.2 Performance Test. 4.:.2.1 The igniter shall be installed in an igniter test chamber fabricated in accordance with Figure 1 and having a free volume of 610 * 6 cubic inches. The igniter shull be fired electrically with not less than 1
22、5 nor more than 20 amperes of cunent flowing. 4.6.2.2 A record of chamber pressure versus time shall be obtained for each tat in the igniter test chamber. This record shall have a minimum time resolution of 0.001 second and minimum pressure resolution of 10 psi and shall consist of a continu- Qus re
23、cording from the instant that current is applied to the igniter until maximum pres- Sure it attained. 5. PREPARATION FOR DEUVERY 5.1 Preservation and Packaging. 5.1.1 - wfth the Code of Federal Regulations 49 CFR 71-78. In addition to the following Level A packaging shall be in accordance 8 c W Prov
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI234531962IGNITERMARK188MOD0MARK188MOD0 点火器 PDF

链接地址:http://www.mydoc123.com/p-979800.html