NAVY MIL-H-85478 A-1982 HANDLE BEADED INFLATION ASSEMBLY《充气装配操纵》.pdf
《NAVY MIL-H-85478 A-1982 HANDLE BEADED INFLATION ASSEMBLY《充气装配操纵》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-H-85478 A-1982 HANDLE BEADED INFLATION ASSEMBLY《充气装配操纵》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、. P a MIL-H-8547A 42 m 7799706 O236507 2 m - i/ c-IS -50 MI L-H -85478A( AS I 19 July 1982 - - MIL-H-85478( AS) 15 June 1981 MILITARY SPECIFICATION HANDLE, BEADED, INFLATION ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Sco
2、pe, This specification covers the require- ments for two types of inflation assembly beaded handles. 1.2 Classification. The inflation assembly beaded handles shall be of the following types (see 6.2): TYPE I - II AP PL I CATION FLU-8A/P Inflator LPU-21 B/P Li fe Preserver LRU-18IU Life Raft 2. APPL
3、ICABLE DOCUMENTS 2.1 Issue of documents. The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herei n. SPECIFICATIONS Federal PPP-B-636 Boxes, Fi brboard Beneficial comments (recommendations,
4、additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Engineering Specifications and Standards Department (Code 93) , Naval Air Engineering Center, Lakehurst, NJ 08733, by using the self-addressed Standardization Docum
5、ent Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. 6 FSC 4220 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-STANDARDS Federal FED-STD-751 . Stitches, Seams, and Stitchings Militarv MIL-STD-105 Sampling Proce
6、dures and Tables for Inspection by Attributes Markings for Shipment and Storage MIL-STD-129 DRAWINGS Naval Air Systems Command 97 5AS 12 1 Handle, Beaded, Inflation Assembly (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific acquisiti
7、on functions should be obtained from the acquiring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), the contractor shall furnish sample units for first article inspection and approval (see 4.3 and 6.3). 3.2 Materials and components. Ma
8、terials and compo- nents shall conform to the applicable specifications and drawings as listed or required herein. 3.3 Design and construction. The beaded handles shall be constructed in accordance with NAVAIR Drawing 975AS121. 3.3.1 Stitching. All the machine stitching shall be accomplished with St
9、itch Type 301 of FED-STD-751. eight to ten stitches per inch. Unless otherwise specified, the ends of the stitching shall be backstitched by overlapping on itself, a minimum of 1/2 inch. back of the break, a minimum of 1/2 inch. The thread tension shall be maintained so that there shall not be any l
10、oose or tight stitching and the lock shall be embedded in the materials sewn together. to 3/8 inch. There shall be Thread breaks shall be backstitched, All the thread ends shall be trimmed to a length of 1/4 34 Breaking strength of the lanyards, When tested as specified in 4.5.3, the lanyards breaki
11、ng strength shall conform to Table III. 3.5 Workmanship. The beaded handle shgll be uniform in quality and free from defects and irregularities which could adversely affect performance, reliability or durability. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
12、from IHS-,-,-. MIL-H-85478A 42 m 7779706 023b.507 b m MIL-H-85478A(AS) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein, Except as otherw
13、ise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. the inspections set forth in the specification where such inspections are deemed necessary to assu
14、re supplies and services conform to prescribed requirements. The Government reserves the right to perform any of 4.2 Classification of inspection. The inspection requirements specified herein are classified as follows: 1. First article inspection (see 4.3). 2. Quality conformance inspection (see 4.4
15、). 4.3 First article. 4.3.1 First article samples. Unless otherwise speci- fied, as soon as practicable after award of the contract or order, the manufacturer shall submit three beaded handles. The samples shall be representative of the construction, workmanship, compo- nents, and materials to be us
16、ed during production. When a manufac- turer is in continuous production of these beaded handles from contract to contract, submission of further first article samples on the new contract may be waived at the discretion of the acquiring activity (see 6.2d). waiving of the first article inspection doe
17、s not exempt the require- ments for performing the quality conformance inspection. The first article samples shall be forwarded as specified in the contract or order (see 6.2e). Approval of the first article samples or the 4.3.2 First article sample approval. Upon completion of the first article ins
18、pection program, recommendations and com- - ments pertinent for use in monitoring production, will be forwarded by the Government activity responsible for the inspection program (see 6.2e) to the contracting officer. One approved beaded handle will be returned to the manufacturer for use in monitori
19、ng produc- tion. article inspection and shall not be considered as part of the quantity to be delivered under contract. will be retained by the inspection laboratory for reference. One beaded handle will be consumed or destroyed in the first The other beaded handle 4.4 Quality conformance inspection
20、. The sampling and inspection levels shall conform to MIL-STD-105. conformance inspection shall consist of the following: The quality 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-85478A 42 9799906 0236510 2 m - - MIL-H-85478A(AS) Visual In
21、spection Dimensional Inspection Breaking Strength of the Lanyards Preparation for Delivery 4.4.1 Sampling 4.4.1.1 Inspection lot. The inspecton lot size shall be expressed in units of one beaded handle made from the same material and under the same conditions, one beaded handle, The sample unit shal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILH85478A1982HANDLEBEADEDINFLATIONASSEMBLY 充气 装配 操纵 PDF

链接地址:http://www.mydoc123.com/p-979534.html