NAVY MIL-D-50727 B-1973 DELAY ELEMENT ASSEMBLIES《延迟发射装置》.pdf
《NAVY MIL-D-50727 B-1973 DELAY ELEMENT ASSEMBLIES《延迟发射装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-D-50727 B-1973 DELAY ELEMENT ASSEMBLIES《延迟发射装置》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、_- f. - . I -1 NIL-D-50727B 13 MIL-D- 50727B( MU) 11 June 1973 SUPERSEDING Mn;-D-50727A( MU) 21 October 1971 .o MILITARY SPECIFICATION DELAY ELEMENT ASSEMBLIES 1. SCOPE 1.1 This specification covers the production, assembly and inspection . requirements for Delay Element Assemblies. The assembly wil
2、l ultimately be loaded and used in conjunction with other propellant actuated devices in aircrew emergency escape systems. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of the specification to the extent
3、 specified herein. SPECIFICATIONS Military MIL -A -2 5 50 - MIL-E- 5272 - MIL-C -60539 - STANDARDS Military MIL-STD-9 - - .-,. MIL-STDg105 MIL-STD-109 - MIL-STD-171 - Ammunition and Special Weapons, General Environmental Testing, Aeronautical and Specification For . Associated Equipment, General Spe
4、cification For and Aluminum Alloys Coating, Anodic, Conventional for Aluminum Screw Threads Conventions and Method of Sampling Procedures and Tables for Inspection Quality Assurance Terms and Definitions Finishing of Metal and Wood Surfaces Specifying by Attributes FSC 1377 Provided by IHSNot for Re
5、saleNo reproduction or networking permitted without license from IHS-,-,-_-_ MIL-D-50727B 13 W 777770b 042b802 1 W MIL-D- 50727B( MU) 4- 2.1 (Contd) DRAWINGS C Applicable Drawings 9266885 - Delay Element Assembly (See 6.1 and 6.3) - Container, Metal Packing Ammunition for De7ay Element Assembly 0.10
6、 Second Delay, 0.30 Second Delay, 0.60 Second Delay, 0.85 Second Delay, or 1.0 Second Delay - Box, Packing Ammunition for Delay Element Assembly 0.10 Second Delay, 0.30 Second Delay, 0.60 Second Delay, 0.85 Second Delay or 1.0 Second Delay 9266886 (Copies of specifications, standards, drawings and p
7、ublications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 2.2 Other publications.-The following document forms a part of this specification to the extent specified herein, the issue i
8、n effect on date of invitation for bid or request for proposal shall apply. Unless otherwise indicated, ASA B46.1 - Surface Texke m (Application for copies should be addressed to the American National Standards Institute, i430 Broadway, New York, N. Y. 3. REQUIRESIENTS 10018). 3.1 General.-Materials
9、, parts and assemblies shall comply with the requirements specified on the drawings pertaining to the applicable Delay Assembly specified in the invitation for Bid, Request for Proposal, contract or other procurement documents (see 6.1 and 6.3) and referenced specifications. 3.2 Protective finish.-W
10、hen protective finish is required by component details, finish requirements shall be as required on the drawings and reference specifications MIL-c-o and MIL-STD-171 and shall apply to all surfaces regardless of contour configurations. 3.3 Vibration,-The delay element assembly shall withstand vibrat
11、ions as prescribed in MIL-E-5272, Procedure XII, without evidence of any dis- integration of the primer or delay charge or derangement of components, 3.4 Primer sensitivity.-The primer when crimped and sealed in a retainer assembly shall fire when drop tested at an energy level of 26.0 inch - ounces
12、 and shall not fire when drop tested at an energy level of 4.0 inch - ounces, 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-50727B 13 m 7777706 0426803 3 m MIL-D- 50727B( MIT) 3.5 Functional. 3.5.1 The delay element shall not fail to fire.
13、3.5.2 Ballistics .-The delay charge shall produce the delay time required by the applicable assembly drawing. 3.6 Workmanship. -Workmanship shall be in accordance with the requirements of the applicable drawings, referenced specifications and the following: 3.6.1 Metal defect.-The metal parts shall
14、be free from cracks, splits, inclusions, porosity or other metal defects. 3.6.2 Burr.-The part shall not have a burr which might interfere - with the assembly or function of the item, or which might be injurious to personnel handling the item. 3.6.3 Foreign matter.-The part or assembly shall not con
15、tain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALLCTY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the per- formance of all inspection requirements as specified herein.
16、Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the -Government. inspections set forth in the specification where such inspections are deem
17、ed necessary to assure supplies and services conform to prescribed requirements. t The Government reserves the right to perform any of the 4.1.1 Quality Assurance terms and definitions .-Reference shall be made to MIL-STD-109 to define Quality Assurance terms used. 4.1.2 4.2 First Article sample. 4.
18、2.1 Inspection.-Inspection shall be in accordance with MIL-A-2550. Initial production sample .-At the beginning of regular production, a sample shall be submitted in accordance with contract requirements and shall consist of 100 primer retainer assemblies for primer sensitivity test, 30 delay elemen
19、t assemblies for vibration and ballistic tests and 10 sets of unassembled components for visual and dimensional examination and tests. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. -_ _._II_- -I_- MIL-D-50727B 13 - 7999906 042680i 5 W 1 MIL-D-
20、50727B(MU) 4.2.1 (Cont d) The sample shall be manufactured, using the same materials, equipment, processes and procedures as used in regular production. All parts and materials, includ+ng packaging and packing shall be the same as used for regular production and shall be obtained from the same sourc
21、e of supply 4.2.1.1 Examination and Tests.-After examination and provisional acceptance at source, the sample shall be inspected for all requirements of the drawings and specifications at a Government laboratory or such other facility specified in the contract. TABLE I Temperature Vibrated . Not Vib
22、rated -65; to -7O:F 4 65, to 75,F 4 200 to 205 F 4 6 6 6 4.2.1.3 Initial production sample failure.-Failure of the sample a- to comply with the requirements of the drawings and specifications shall result in sample disapproval. 4.3 Inspection provisions. 4.3.1 - Lot. 413.1.1 Submission of product.-T
23、he product shall be submitted in accordance with MIL-STD-105. 4.3.1.2 Size of lot.-An munition lot shall consist of an identifiable group of Delay Element Assemblies consisting of: a. Components produced by a homogeneous process. b, C. Primers from not more than one lot. Delay charge from not more t
24、han one lot. d. Output charge from not more than one lot. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-._- I MIL-D-507278 13 m 7977706 0426805 7 m MIL- D50727B(W 4.3.2 Examination.-One-hundred percent examination shall be performed I for all cri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILD50727B1973DELAYELEMENTASSEMBLIES 延迟 发射 装置 PDF

链接地址:http://www.mydoc123.com/p-978346.html