NAVY MIL-C-82461-1966 CONTAINER TORPEDO MK 197 MODS 1& 2《197号1和2型鱼雷贮存器》.pdf
《NAVY MIL-C-82461-1966 CONTAINER TORPEDO MK 197 MODS 1& 2《197号1和2型鱼雷贮存器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-82461-1966 CONTAINER TORPEDO MK 197 MODS 1& 2《197号1和2型鱼雷贮存器》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-82YbL L U 999990b 0289823 9 r MIL-C-8246i(OS) 3 September 1966 CONTAINER, TOWPHX) MK 197 WIx 2 This specification has been approved by the Naval rdnancs Systemis Command, Department of the Navy. 1. SCOPE 1.1 Taais specification coverts Containers for Torpedoes MK 43 od i, MK 43 MO 3, M.44 Mod
2、O, MX 44 W 1, MK 46 Mod O and MK 46 w 1. sontainers are, for test purposes, of one type and one class and are referred to herein as the Container. These . (See 6.2 for description). 20 APPLIC4Bm WCUMENTS 2,f !the following documents of the Issue In effect on dste of invitation for bids form a 8art o
3、f this specification, to the extent specified herein. SPECIFICATIONS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-(582461 (OS) 26994 Container, Wrpedo, Wk 197 Mod 2 and aJ.1 doconnents listed thereon Torpedo MK 43 Mod 3, OutUne WaWing Torpedo
4、 PIK 46 Mod 0, Outline Wswing Torpedo MK ic6 Hod lo Outline mawlog BUEPS DW 1803640 BWEPS DWG 2159700 Bm WG 2539302 (Copies of speeif ications , staadwds, drawingo, and publications required by the supplier in connection with specific procurement functions should be obtained ra the procuring activit
5、y or 68 directed by the con- tracting officer. ) 3.1 Preproduction srrniple. Unless otherwise specified in the con- tract QT arder, preproduction samples of the Container shall be manu- factured using the methods and procedures proposed for the production. The sample Will be tested as specified in S
6、ectdon 4 herein and i6 for the piapose of determining that, prior to starting production, the con- tractors production methods are capable of yieldiag items that ccmply with the technical requirements of the contract. 3.2 GeneraJ. requkrements. 3.2.1 bisteriais and treatments of materials and parts.
7、 Unless other- wise specified, all materials, treatments, EUXI parts used in the manu- facture of the Container shall be in accordance with the requiremnts specified herein and with the applicable documents listed in LB 269273 for Msd 1 and LD 2692% for Mad 2. 3.2.2 Gages. “he supplier shall provide
8、 those gages necessary and adequate to assure that the Contaimr will meet dimensions and requirements shown on the applicable docmen%s breted in u) 269273 for Mod 1 and LD 269294 for Mod 2. When requested by the supplier, the procuring agency may fu=nish existing, pertimnt draxtngs of Naval final in
9、spection gages for use only in the designiug of the suppliers gages. for designing and manufacturing the gages needed for the fulfilbent of the contract. This action does not relieve the supplier of the responsibility 3.2.3 lkmny load. For test purposes a dunmy load simulating a torpedo shall be use
10、d. Con%iguratiorr. and Wei% distribution of the dimimy load shall be in accordance wi-th awing 2539302 kor Container MK 197 Mod 1, and ;U, if 60 iiirei?%eii by the procuring activity, from those units previously shipped. c. Submit to the procuring activity for approval, the proposed corrective actio
11、n to prevent recurrence of the defect. Retmn %o Step 1 and proceed as infcated when inspection ia resumed. 4.4 Preproduction and periodic production inspection. The pre- production and periodic production siample, after satisfactorily passing the acceptance inspections detailed in 4.5, sW1 be subjec
12、ted to the following tests and exeminations. 4.4.1 Test equipment 4.4.1.1 Vibration test machine. Vibration tests shall be conducted by any vibration machine capable of meeting the conditions specified in 4.4.2.1. Means shall be provided for controlling the direction of vibration of the machine and
13、for adjusting and measuring the frequencies and amplitudes of vibration. 4.4.L.2 Hoist. A hoist capable of safely lifting a load of lo00 pounds. 4.4.2 Test procedures. The Container, using a dw loadL shall be subjected to the following tests at ambient temperature only: 4.4.2.1 Vibration. The loaded
14、 container shall be rigidly secured to the vibration equipment, in its normal shipping attitude, and vibrated in directions parallel to each of the three principal orthogonsl axes, with frequency and applied force varying unifarmly with tim, in scam as shown in Table I. -_ -. - -. Provided by IHSNot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC824611966CONTAINERTORPEDOMK197MODS12197 鱼雷 贮存 PDF

链接地址:http://www.mydoc123.com/p-978065.html