NAVY MIL-C-81805-1970 CARTRIDGE IMPULSE MARK 125 MOD 0《MARK 125 MOD 0型推动炮弹》.pdf
《NAVY MIL-C-81805-1970 CARTRIDGE IMPULSE MARK 125 MOD 0《MARK 125 MOD 0型推动炮弹》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-81805-1970 CARTRIDGE IMPULSE MARK 125 MOD 0《MARK 125 MOD 0型推动炮弹》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、i IaL-C-81805.(AS ) U, December- 1970 Superseding AS-i077 MILITARY SPEC1 FICATIOM CARTRIDGE, IMPULSE, MARK 125 MOD o This specification has been approved by the Naval Air Systems Command, Department of the Navy. 1. SCOPE 1.1 This document governs the manufacture, assembly and preparation for deliver
2、y of the MARK 125 MOD O impulse cartridge and the methods of inspection and tests upon which product acceptance will be based. 2. APPLICABLE DOCUME3TS 2.1 The following specirications, standards, drawings, and publications, of the issue in effect on date of invitation for bids, form a part or this d
3、ocument to the extent specified herein. SPECIFICATIONS Mili ta-m MIL-P-116 MI L-D-21625 MI L-D -81 303 Preservation, Methods of Design and Evaluation of Cartxidges for Cartridge Actuated Devices Design and Evaluation of Cartridges for Stores Suspension Quipment Naval Air Systems Command (Code Ident
4、30003) AS-1075 Ignition Element, Electrical, MARK 14 MOD O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-bIIL-CB1805 (AS) STANDARDS Military EEL-STD-105 rnL-STD-l2g MIL-STD-4i4 Sampling Procedures and Tables for Inspecttion by Attributes Marking fo
5、r Shipment and Storage Sampling Procedures and Tables for Inspection by Variables for Percent DeTective DRAWINGS AND ASSOCIATED LISTS Haval Air Systems Comand (Code Ident 30003) DL 2520046 DL 283e200 2520046 2838200 2838210 2838211 PUBU CATIOhS Bureau cf Naval Weapons op 5 2 Ignition Element, Electr
6、ical, NARK i4 MOD O Cartridge, Impulse, MARK 125 IOD O Ignition Element, Electrical, MARK 14 MOD O, Assembly Cartridge, Impulse, MARK 125 KOD O, Assembly Cartridge, Impulse, MARK 125 MOD O, Packaging Assembly Container, Inner, Assembly (Code I den% 10001 ) Ammunition Ashore (This publication is not
7、furnished to bidders and contractors by the prccurinp activity. . Contractors should contact the Government Inspector for use of the publication. ) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-kl-43 Preparation of Quality Assurance Provisions ( CU
8、pies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer. ) 2.2 Other publications. Tlie following document forms a part of this spe
9、cification. Unless otherwise indicated, the issue in effect on date of invitation for bids shall apply. CODE OF FEDERAL REGULATIONS 49 cm 171-178 Transportation, and the main propellant charge, Drawing 2838200; are defined as primry ccxponents . See 4.3.3. 3.3.1 Ignition element- The MARK 14 MOD O e
10、lectrical ignition element used in the MARK 125 MOD O impulse cartridge shall be manu- factured in accordance with the drawings listed on DL 2520046 and shall meet the applicable requirements of AS-3-075. The ignition elements shall be from lots manufactured within the preceding 12 mnths. See 4.7.i.
11、 3.3.2 Propellant charge. 3.3.2.1 Quantit . All propellant charges shall be as specified on Drawing 283 + 200 Charges shall be determined by weight rather than by volume measurements. 3.3.2.2 Smokeless powder, handling and loading. Do not subject sniokeless powder to unnecessary handling or exposure
12、 to the atmosphere. The handling and loading of smokeless powder exposed to the atmosphere shall be perfomed only under conditions that do not permit the relative humiity to exceed 75 percent. 3.3.2.3 Smokeless powder, condition. The smokeless powder utilized 3.4 Cartridge inspection. 3.4.1 Visual i
13、nspection. Cartridges shall be free of the following shall exhibit no evidence of decomposition. See 4.7.2. visible deyects: burrs, dents, deep scratches, split or cracked crimp, defective sealant application around crimp, chipped surfaces, or other defects which may prevent entry of the cartridge i
14、nto the firing chamber, or affect the stability or resistance of the cartridge to misture. See 4.7.k. 3.4.2 Erige circuit resistance. The resistance of the bridge circuit in each completely assembled cartridge, when measured electrically as specified in 4.7.3, shall be not less than 1.0 ohm nor more
15、 than 1.2 ohms. 3.4.3 Leakage. Cartridge leakage rate shall not exceed lo- cc of air or gas per second when tested in accordance with 4.7.5. 3.5 No-fire. Each cartridge of the preproduction sample and each cartridge of the production lot ballistic and cartridge integrity samples shall meet the no-fi
16、re requirements of 4.8. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-C-81805 (AS ) 3.6 Tallistic requirements. Cartridges fwm each production lot, selecter! in acccrdance with 4.9.1, shall meet the requirements listed belov when subJzcted to
17、 the test prescribed in 11.9.2. 3.6.1 Velocity. The lower limit (L) of velocity shall be 16 ftisec. See k .9.2 .i . 3.6.2 Misfire. There shall be no misfires. See 4.9.2.1.2. 3.6.3 Hangfire. There shall be no hangfires, See 4.9.2.1.3. 3.6.4 Propellant gas leakage. There shall be no propellant gas lea
18、kage. See 4.9.2.1.4. 3.7 Cartridge integrity. Cartridges froin each production lot, selected in accordance with k.9.1, shall exhibit no evidence of propellant gas leakage when subjected to the test of 4.9.3. 3.8 Change in propellant lot. Whenever a change occurs in the propellant lot, test firings s
19、hall be conducted in accordance with 4.11. Eo cartridge sball produce results cutside the velocity limit of 3.6.1 and no cartridge shall fail to meet the requirements of 3.6.2 through 3.6.4. 3.9 Packaging, packing and markin$. Tie packaging and packing cf cartridges and the container markings shall
20、be in accordance with Section 5. see 4.6.1. 3.10 Workmanship. Cartridges shall be constructed and finished in a manner to assure coapliance with all requirements of this specifi- cation an vibration (12); 15 “g“ shock (12); 40-foot drop (6); +7O0F (12) -65 F (12); +200F (12). on temperatures shall b
21、e f 5 F. Temperature conditioning prior to firing shall be for a minimum period of six hours. The numbers in parentheses denote the number of firings allocated for test, using two cartridges for each firing, except for the 40-foot drop which is a non- firing test. ejector rack as specified in 4.9.2.
22、 No cartridge shall produce results outside the velocity limit of 3.6.1 and no cartridge shall fail to meet the requirements of 3.6.2 through 3.6.4. Of the remaining cartridges, 20 shall be subjected to the cartridge integrity test of 4.9.3. The failure of any cartridge to meet the requirements as s
23、tated above shall cause rejection of the preproduction sample. Tolerance . The above cartridge firings shall be conducted in an Aero 7A 4.3.3 Production lot. Unless otherwise specified in the contract; the cartridge producticn lot size shall be 5000 minimum. -Only primary components from a single lo
24、t shall be used in a production lot of car- triages; however, one primary component production lot may be used in more than one cartridge production lot. 4.4 Gsges. The contractor shall provide gages as necessary to insure that the material to which this specification applies will meet the dimension
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC818051970CARTRIDGEIMPULSEMARK125MOD0MARK125MOD0 推动 炮弹 PDF

链接地址:http://www.mydoc123.com/p-978035.html