NAVISTAR CEMS DT-17-2013 Torque To Seal Test For Hydraulic Brake Lines.pdf
《NAVISTAR CEMS DT-17-2013 Torque To Seal Test For Hydraulic Brake Lines.pdf》由会员分享,可在线阅读,更多相关《NAVISTAR CEMS DT-17-2013 Torque To Seal Test For Hydraulic Brake Lines.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、This document is restricted and may not be snt outside Navistar, Inc. or eproduced without permision from Corprate Technical Standars. Supliers are rquired to asue al patet liailty. 2013 by Navistar, Inc. JUNE 2013 Page 1 of 2 NAVISTAR, INC. CEMS (CORPRATE NGIERING ATRIAL SPECIFCATION) NUMBER: CEMS
2、DT-17 TILE: Torque To Seal Test For Hydraulic Brake Lines CURENTISUE DATE:JN 2013 WRITEN/REVIWED BY: Materials Engiering APROVED BY: Materials Engiering SUPERSEDS ISUE OF: N/A PRINTED COPIES OF THIS DOCUENT UST BE VRIFED FOR CURENT REVISON This pecifcation may invole hazrdous materials, equipment, a
3、nd procedures. This pecifcation does not purport o adres al of te safty isues socited wit its se. Th usr is rsosible to cnslt apropriat safty halth racties an to trmine th plicabilty of regulatory limits prior to se. Cange Ntic: NEW 1.0 SCOPE Test method to detrmine the torque value to seal hydrauli
4、c brake line conection uder 250 psi. This tst is vali at 23C 5C. 2.0 RESTRICTED CHEMICAL SUBSTANCES Efective January 1, 207, al product suplied to the rquiremnts of this pecifcation must comply with t rqiremnts of the CES B-50 scifcatin. 3.0 REFRENCE DOCUMENTS Unles otherwise pecifed the latest isue
5、 of al refrence standars hal aply. The folwing spcifcatins and stanars ar rfrencd in this piftio. Nvistr CEMS B-50 4.0 APRATUS AND ATERIALS .1 test fixture shal be st up that wil have the capbilty to atch to ablunt end of a brake tube and impart prsrs of 250 psi (Hig tolernc of working presure of yd
6、rlic brak sytem). 4.2 The oposite nd of the brake tub wher presure is imartd shal inlude r tub asembly complt with t subject u nts and standar flar whic wil be te dsign bing evaltd. 4.3 A thread Saver nt or ther suitble iterfcing part il provi for the itrfce with te design bing eluatd (tube nut and
7、sction f lared tube). 4. A seali mchnism shal be provide with t trad saver as part of the tst fixture. .5 Wtr or Brake Oil sl usd in th test. 4.6 A minium of 6 samples hal be tstd. *Note: Parts undergo yielding when torqued together therfore new mating parts are nede after cmpltion f torqu tst. I ad
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVISTARCEMSDT172013TORQUETOSEALTESTFORHYDRAULICBRAKELINESPDF

链接地址:http://www.mydoc123.com/p-962078.html