1、*USACE / NAVFAC / AFCESA / NASA UFGS-12 48 13.13 (February 2011)-Preparing Activity: NASA SupersedingUFGS-12 48 13.13 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION TABLE OF CONTENTSDIVISION 12 - FURNISHINGSSECTION 12 48 13.13ENTRANC
2、E FLOOR MATS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCEPART 2 PRODUCTS2.1 AFFIRMATIVE PROCUREMENT2.2 TYPE OF MATS2.2.1 Entrance and Floor Mats2.2.1.1 Resilient Link Mats2.2.1.2 Rubber or Vinyl Mats2.2.1.3 Cocoa Mats2.2.1.4 Recycled Rubber-Tire Mats2.2.1.5 Carpet-Type Mats2.2
3、.1.6 Loop Filament Mats2.2.1.7 Nylon-Reinforced Mats2.3 GRAPHICSPART 3 EXECUTION3.1 DELIVERY OF MATERIALS3.2 EXAMINATION3.3 INSTALLATION- End of Section Table of Contents -SECTION 12 48 13.13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USA
4、CE / NAVFAC / AFCESA / NASA UFGS-12 48 13.13 (February 2011)-Preparing Activity: NASA SupersedingUFGS-12 48 13.13 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2011*SECTION 12 48 13.13ENTRANCE FLOOR MATS02/11*NOTE: This guide specification cover
5、s the requirements for entrance and floor mats for surface installation, including resilient link mats, rubber-vinyl mats, rubber-tire mats, carpet-type mats, loop-filament mats, nylon-reinforced mats, coconut brush mats, and custom graphics.Drawings must indicate location, size, and shape of mats.E
6、dit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments
7、, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to
8、 in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the
9、 Reference Wizards Check Reference feature to update SECTION 12 48 13.13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specificatio
10、n when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 501 (1984; R 2009) Relative
11、 Resistance to Wear of Unglazed Ceramic Tile by the Taber AbraserASTM D 2047 (2004) Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James MachineASTM D 2240 (2005; R 2010) Standard Test Method for Rubber Property - Durometer HardnessASTM E 648 (2010) Standard Test M
12、ethod for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy SourceASTM F 150 (2006) Electrical Resistance of Conductive and Static Dissipative Resilient FlooringASTM F 1869 (2010) Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium ChlorideCA
13、RPET AND RUG INSTITUTE (CRI)CRI 104 (2002) Standard for Installation Specification of Commercial CarpetU.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials1.2 SUBMITTALS*NOTE: Review Submittal Description (
14、SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Governme
15、nt approval. Some submittals are already marked with a “G”. Only SECTION 12 48 13.13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality
16、 Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approvin
17、g authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following
18、 the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ desi
19、gnation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataSu
20、bmit Manufacturers Data and indicate percentage of recycled material content in protective flooring materials Entrance and Floor Mats to verify affirmative procurement compliance.Submit total weight and volume quantities of protective flooring materialswith recycle materials content.SD-04 SamplesSub
21、mit manufacturers standard color charts for Entrance and Floor Mats showing the manufacturers recommended color and finish selections.Submit one sample 300 mm 12 inch square, assembled sections of floor mat to show corners, intersections, and other details of construction. Provide any graphics in dr
22、awing for approval.1.3 QUALITY ASSURANCEComply with Section 4.5 in the U.S. Architectural & Transportation Barriers Compliance Boards “Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities (ADAAG) for installed entrance and floor mats.Submit documentation of te
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS124813132011ENTRANCEFLOORMATS 入口 地毯 PDF

链接地址:http://www.mydoc123.com/p-836575.html