MSFC NASA MPR 3200 1 REV L-2008 ONSITE LOCATION OR RELOCATION OF CONTRACTOR OR OTHER GOVERNMENT AGENCY PERSONNEL AT MSFC《承包商或其他政府机构人员在马歇尔太空飞行中心的现场位置或重新布置》.pdf
《MSFC NASA MPR 3200 1 REV L-2008 ONSITE LOCATION OR RELOCATION OF CONTRACTOR OR OTHER GOVERNMENT AGENCY PERSONNEL AT MSFC《承包商或其他政府机构人员在马歇尔太空飞行中心的现场位置或重新布置》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MPR 3200 1 REV L-2008 ONSITE LOCATION OR RELOCATION OF CONTRACTOR OR OTHER GOVERNMENT AGENCY PERSONNEL AT MSFC《承包商或其他政府机构人员在马歇尔太空飞行中心的现场位置或重新布置》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 3200.1 REVISION L EFFECTIVE DATE: October 20, 2008 EXPIRATION DATE: October 20, 2013 MARSHALL PROCEDURAL REQUIREMENTS AS01 ONSITE LOCATION OR RELOCATION OF CONTRA
2、CTOR OR OTHER GOVERNMENT AGENCY PERSONNEL AT MSFC Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 MPR 3200.1 Revision: L Onsite Location or Relocation of Contractor or Other Government Agency Personnel at MSFC Da
3、te: October 20, 2008 Page 2 of 9 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Revision G 12/27/99 History l
4、og added with this revision; previous history contained in Directive Managers Reference File. This document is a complete rewrite of MMI 3200.lF. Revision H 4/23/2004 Changed “Facilities Engineering Department” to “Integrated Customer Support Department” throughout the document. Updated Footer URL.
5、Revision I 10/22/2004 MSFC received an Agency action from Headquarters requiring the Centers to improve documentation and operating procedures. Revision J 8/26/2005 Revised to reflect organizational changes. Re-numbered paragraphs, as needed. Paragraphs 2.2 and 3.1.1.7 changed to include IT requirem
6、ents. Paragraph 3.2.5 changed to return the original approved/disapproved request to the requesting office/directorate. Revision K 2/14/2007 Revised to reflect organizational and editorial changes, records disposition, add an Appendix (Example of Memorandum for Request for Authority to Locate Contra
7、ctor Personnel Onsite at MSFC), disposition of Appendix, and clarification of additional space requested. Revision L 10/20/2008 Revised the Applicability statement to address the applicability of this directive to MSFC. This document is not applicable to Michoud Assembly Facility (MAF). Also, reflec
8、ts a title change and minor editorial changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 MPR 3200.1 Revision: L Onsite Location or Relocation of Contractor or Other Government Agency Personnel at MSFC Date:
9、 October 20, 2008 Page 3 of 9 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS Preface P.1 Purpose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 References P.6 Cancellation Document
10、Content 1. Definitions 2. Responsibilities 3. Procedure 4. Records 5. Flow Diagram Appendix - Example of Memorandum for Request for Authority to Locate Contractor Personnel Onsite at MSFC Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Proce
11、dural Requirements AS01 MPR 3200.1 Revision: L Onsite Location or Relocation of Contractor or Other Government Agency Personnel at MSFC Date: October 20, 2008 Page 4 of 9 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE
12、 USE PREFACE P.1 PURPOSE The purpose of this Marshall Procedural Requirements (MPR) is to establish the responsibilities and procedures required for onsite location or relocation of contractor and other Government agency personnel at Marshall Space Flight Center (MSFC). This information will be obse
13、rved in the decision-making processes in MPD 8812.1 related to facilities utilization and planning. P.2 APPLICABILITY This MPR applies to the personnel, programs, projects, and activities at MSFC including contractors and resident agencies to the extent specified in their respective contracts or agr
14、eements. (“Contractors,” for purposes of this paragraph include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreements parties.) P.3 AUTHORITY NPR 8800.15, “Real Estate Management Program Implementation Manual” P.4 APPLICABLE DOCUMENTS MPD 8812.1,
15、“MSFC Facility Utilization Policy” P.5 REFERENCES None P.6 CANCELLATION MPR 3200.1K dated February 14, 2007 Original signed by David A. King Director Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 MPR 3200.1 Rev
16、ision: L Onsite Location or Relocation of Contractor or Other Government Agency Personnel at MSFC Date: October 20, 2008 Page 5 of 9 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT CONTENT 1. DEFINITIONS N
17、one 2. RESPONSIBILITIES 2.1 Program/Staff Offices and Directorates shall: 2.1.1 Prepare a memorandum to the Director, Office of Center Operations (OCO), requesting authority to locate contractor and other Government agency personnel onsite in accordance with Section 3, Procedures. 2.1.2 Coordinate w
18、ith the Manager, Facilities Management Office (FMO), AS20, for estimated cost. 2.2 Manager, FMO (AS20), shall provide the program/staff offices and directorates the estimated costs for movement of furniture and equipment requirements, facility alterations, and information technology (IT) requirement
19、s, etc. 3. PROCEDURE 3.1 Program/Staff Offices and Directorates shall: 3.1.1 Prepare and submit request for approval or reapproval (original and three copies) to the Director, OCO, through the Manager, FMO (AS20), and the Director, Office of Procurement, for their concurrence at least 30 days prior
20、to the planned movement of personnel onto Marshall. In the case where a Request for Proposal (RFP) is being prepared that would require a contractor to submit a proposal based on the understanding that the Government would furnish onsite housing, the request shall be approved prior to issuing such a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR32001REVL2008ONSITELOCATIONORRELOCATIONOFCONTRACTOROROTHERGOVERNMENTAGENCYPERSONNELATMSFC

链接地址:http://www.mydoc123.com/p-822868.html