KS B ISO 10407-2007 Petroleum and natural gas industries-Drilling and production equipment-Drill stem design and operating limits《石油和天然气工业 钻井和生产设备 钻柱设计和操作极限》.pdf
《KS B ISO 10407-2007 Petroleum and natural gas industries-Drilling and production equipment-Drill stem design and operating limits《石油和天然气工业 钻井和生产设备 钻柱设计和操作极限》.pdf》由会员分享,可在线阅读,更多相关《KS B ISO 10407-2007 Petroleum and natural gas industries-Drilling and production equipment-Drill stem design and operating limits《石油和天然气工业 钻井和生产设备 钻柱设计和操作极限》.pdf(118页珍藏版)》请在麦多课文档分享上搜索。
1、 KS B ISO 10407KSKSKSKSSKSKSKS KSKSKS SKSKS KSKS SKS KS KS B ISO 10407: 2007 2007 11 21 http:/www.kats.go.krKS B ISO 10407: 2007 : () ( ) () ( ) : (http:/www.standard.go.kr) : :2007 11 21 2007-1028 : : ( 02-509-7270) (http:/www.kats.go.kr ). 7 5 , . KS B ISO 10407: 2007 Petroleum and natural gas ind
2、ustriesDrilling and production equipmentDrill stem design and operating limits 1993 1 ISO 10407, Petroleum and natural gas industries Drilling and production equipment Drill stem design and operating limits . 1 , , , . 2 . ISO 10407 “API Recommended Practice 7G(RP 7G), Fourteenth Edition, August 1,
3、1990 Recommended Practice for Drill Stem Design and Operating Limits”. API RP 7G . . API RP 7G ISO 31 . 1 inch (in) = 25.4 mm( ) 1 foot (ft) = 304.8 mm 0.304 8 m( ) 1 pound-force per square inch(lbf/in2) = 6 894.757 Pa 1 bar = 105Pa 1 pound-force per square inch (lbf/in2) = 6 894.757 Pa 1 foot-pound
4、 force(ftlbf) = 1.355 818 J 1 foot-pound force(ftlbf) = 1.355 818 N m (F) () . = 5/9(F 32) 1 cubic foot = 0.028 316 8 m3 28.316 8 dm31 gal (US) = 0.003 785 4 m3 3.785 4 dm31 barrel (US) = 0.158 987 m3 158.987 dm3KS B ISO 10407: 2007 2 1 pound (lb) = 0.453 592 37 kg( ) LINEIC 1 pound per foot (lb/ft)
5、 = 1.488 163 9 kg/m 1 pound-force (lbf) = 4.448 222 N 1 barrel/day = 0.158 987 m3/day 1 cubic foot per minute (ft3/min) = 0.028 316 85 m3/min 40.776 192 m3/day KS B ISO 10407: 2007 3 1 1.1 , , , . 1.2 2., 3., 4., 5. . 6., 7., 8., 9., 12. . 10. . 11. . 13. ( ) . 2 2.1 , , . . . 2.2 2. . 2.3 A . 2.4 2
6、.10 2.11 8 . 4 . 12 . 2.5 . , , , , , , . A.8 . 2.6 . (OD) (ID) . OD , ID . OD ID . 2.7 OD . , OD . , OD . , OD . , OD ID . KS B ISO 10407: 2007 4 2.8 2.12 OD, . a) 0.3 % 4060 % . 50 % 60 % . b) . c) 80 % . d) 2 70 % . e) ( 0.80) . . 2.1 1 2 3 4 5 6 7 OD in D & lb/ft alb/ft in ID In d bsq. in A ccu.
7、 in Z alb/ft = 3.399 6A(col.6) bA = 0.785 4(D2 d2) cZ = 0.196 35 DdD44KS B ISO 10407: 2007 5 2.2 1 2 3 4 5 6 7 8 9 10 a ftlb b lb OD in lb E 95 105 135 E 95 105 135 a 57.7 % A.9 (A.15) bA.7 (A.13) KS B ISO 10407: 2007 6 2.3 1 2 3 4 5 6 7 8 9 10 psi psi OD in lb E 95 105 135 E 95 105 135 API 5C3 KS B
8、 ISO 10407: 2007 7 2.4 API 1 2 3 4 5 6 7 8 9 10 a, b ftlb b lb OD in / lb/ft E 95 105 135 E 95 105 135 a 57.7 % b 20 % KS B ISO 10407: 2007 8 2.5 API 1 2 3 4 5 6 7 8 9 10 a psi a psi OD in lb/ft E 95 105 135 E 95 105 135 API 5C3 . a 80 % . OD . OD . KS B ISO 10407: 2007 9 2.6 API 2 1 2 3 4 5 6 7 8 9
9、 10 a, b ftlb b lb OD in / lb/ft E 95 105 135 E 95 105 135 a 57.7 % b 30 % KS B ISO 10407: 2007 10 2.7 API 2 1 2 3 4 5 6 7 8 9 10 a psi a psi OD in lb/ft E 95 105 135 E 95 105 135 2 API 5C3 . a 70 % . OD . OD . 2.8 2.9 RP 7G 12 . KS B ISO 10407: 2007 11 2.10 E 1 2 3 4 5 6 7 8 9 10 11 12 in lb/ft *lb
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- KSBISO104072007PETROLEUMANDNATURALGASINDUSTRIES DRILLINGANDPRODUCTIONEQUIPMENT DRILLSTEMDESIGNANDOPERATINGLIMITS

链接地址:http://www.mydoc123.com/p-815696.html