ITU-T E 503 (REV 1)-1992 Traffic Measurement Data Analysis (Study Group II) 9 pp《话务测量数据分析(研究2组)9pp》.pdf
《ITU-T E 503 (REV 1)-1992 Traffic Measurement Data Analysis (Study Group II) 9 pp《话务测量数据分析(研究2组)9pp》.pdf》由会员分享,可在线阅读,更多相关《ITU-T E 503 (REV 1)-1992 Traffic Measurement Data Analysis (Study Group II) 9 pp《话务测量数据分析(研究2组)9pp》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、CCITT RECMN*E.503 (REV*l) 92 4862591 0573670 376 W INTERNATIONAL TELECOMMUNICATION UNION CCITT E.503 (rev.1) THE INTERNATIONAL TELEGRAPH AND TELEPHONE CONSULTATIVE COMMITTEE TELEPHONE NETWORK AND ISDN QUALITY OF SERVICE, NETWORK MANAGEMENT AND TRAFFIC ENGINEERING TRAFFIC MEASUREMENT DATA ANALYSIS Re
2、commendation E.503 (rev.1) CCITT RECMN*E.503 (REV*l) 92 = 4Bb2591 0573671 202 INTERNATIONAL TELECOMMUNICATION UNION CCITT E.503 (rev.1) THE INTERNATIONAL TELEGRAPH AND TELEPHONE CONSULTATIVE COMMITTEE TELEPHONE NETWORK AND ISDN QUALITY OF SERVICE, NETWORK MANAGEMENT AND TRAFFIC ENGINEERING TRAFFIC M
3、EASUREMENT DATA ANALYSIS Recommendation E.503 (rev.1) Geneva, 1992 FOREWORD The CCIIT (the International Telegraph and Telephone Consultative Committee) is a permanent organ of the International Telecommunication Union (ITU). CCIIT is responsible for studying technical, operating and tariff question
4、s and issuing Recommendations on them with a view to standardizing telecommunications on a worldwide basis, The Plenary Assembly of CCIIT which meets every four years, establishes the topics for study and approves Recommendafions prepared by its Study Groups. The approval of Recommendations by the m
5、embers of CCITT between Plenary Assemblies is covered by the procedure laid down in CCITT Resolution No. 2 (Melbourne, 1988). Recommendation E.503 was prepared by Study Group II and was approved under the Resolution No. 2 procedure on the 16th of June 1992. CCIT NOTE In this Recommendation, the expr
6、ession “Administration” is used for conciseness to indicate both a telecommunication Administration and a recognized private operathg agency. O IT 1992 Ail rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including phot
7、ocopying and microfilm, without permission in writing from the ITU. CCITT RECMN*E.503 (REV*l,) 92 4862591 0573673 O5 More specific information on traffic data relevant to the exchange and surrounding network performance can be provided by means of measurements on selected sets of circuit groups, sub
8、scriber line groups, common channel I signalling links, auxiliary and control units. Recommendation ES03 TRAFFIC MEASUREMENT DATA ANALYSIS (revised 1992) 1 Introduction The aim of traffk measurements is to provide data that can be used by an Administration for planning, engineering and managing its
9、network. The resulting measured data can be used to support various activities as stated in Recommendation E.502. In order to reduce the amount of data ransfer and off-line processing, the exchange or operations system can be used to make preliminary analyses for purposes of: - eliminating unnecessa
10、ry data values; - replacing missing or wrong values in an approriate way; - performing simple calculations on the values of the basic measurement entities to derive characteristic parameter values of the traffic; - storing some measured or calculated values, in particular, traffk data records; - pro
11、ducing appropriate user friendly report printouts. For each measurement object, there is a data record in which a certain number of traffic values are stored. Also, some calculated values, e.g. moving average, can be stored and updated in this data record area. The internal functions of the analysis
12、 are not specified here. They depend on the requirements for the output results which are specified by the Administration. An acceptable method may be to collect and store the data in real time, either in a temporary data base file or directly in the traffic data record, and later perform the calcul
13、ations and report printout during periods of low exchange processing activity. Alternatively, the records can be transferred to an off-line system for processing, to reduce the load on the exchange. 2 Po ten tia1 applications In order to provide bulk data for traffk and operational analysis, overall
14、 measurements can be performed on the totality of subscriber lines and/or circuits. Very detailed raffk data can be obtained by analysis of call records. These call records should be produced by the exchange, containing all the data (e.g. time of occurrence of signalling event, dialled digits, etc.)
15、 characterizing each individual cal attempt. The relationships between the above measurements and the potential applications are shown in Table 1E.503. The basic measurement types are given in Recommendation E.502. Their applicability will deped on the function of the exchange (local, transit, inter
16、national, etc.). Recommendation ES03 1 2 Recommendation ES03 - x x x x - x Y 3 B EJ 4 x x x - x CCITT RECMN*E.503 (REV831 72 4862573 0573675 758 9 3 Traffic analysis model Corresponding to a variety of measurements, there are a variety of analyses, some of which are typicaUy running continuously fro
17、m day to day. From the viewpoint of a particular measurement, there are one or more analyses for which the measured data are written in particular fdes which are included in the output device list of a measurement as logical devices. These files are input files from the viewpoint of a traffk analysi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTE503REV11992TRAFFICMEASUREMENTDATAANALYSISSTUDYGROUPII9PP 话务 测量 数据 分析研究 PPPDF
链接地址:http://www.mydoc123.com/p-795273.html