GMW GMW3286-2011 Neutral Salt Spray (NSS) Test English Issue 2《中性盐雾(NSS)试验 第2次出版(英文版本)》.pdf
《GMW GMW3286-2011 Neutral Salt Spray (NSS) Test English Issue 2《中性盐雾(NSS)试验 第2次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW3286-2011 Neutral Salt Spray (NSS) Test English Issue 2《中性盐雾(NSS)试验 第2次出版(英文版本)》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW3286 Neutral Salt Spray (NSS) Test Copyright 2011 General Motors Company All Rights Reserved October 2011 Originating Department: North American Engineering Standards Page 1 of 4 1 Scope Note: Nothing in this standard supercedes applicable laws and
2、regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. The neutral salt spray test is typically used to evaluate the corrosion resistance of metallic substrates and the corrosion preventative properties of coati
3、ngs. 1.2 Foreword. This standard establishes test equipment and test specimen requirements for conducting the neutral salt spray test. The chamber operation and test procedures are based on ISO 9227. Clarifications to ISO 9227 requirements are defined below. 1.3 Applicability. The neutral salt spray
4、 test is typically used for quality control and process control evaluations and not for simulating field performance. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. ISO 9227 2.2 GM Standards/Specifications. None
5、 3 Resources 3.1 Facilities. Laboratory (preferably with controlled ambient conditions). 3.2 Equipment. 3.2.1 Test Chamber. The apparatus shall consist of an environmental chamber, a suitable water supply conforming to ISO 9227 (section 3.1) requirements, provisions for humidification and heating of
6、 the chamber, and the necessary means of control along with the ability to maintain the following environmental conditions: 3.2.1.1 Chamber Temperature: 35 2 C (95 3 F). 3.2.1.2 Humidity 100% relative humidity (RH). 3.2.1.3 Humidification/Bubble Tower Temperature: May be adjusted such that the speci
7、fied operating conditions are met. 3.2.1.4 Humidification/Bubble Tower Pressure: May be adjusted such that the specified operating conditions are met. Note: Refer to ISO 9227, Annex A for schematic diagram of one possible design of test chamber. 3.2.2 Fog/Water Collection. Suitable collecting device
8、s include glass or plastic funnels with the stems inserted into collection vessels. Funnels with a diameter of 10 cm have an area of about 80 cm2. 3.2.2.1 At least two clean fog collectors shall be placed within the exposure zone so that no drops of solution from the test specimens or any other runo
9、ff source shall be collected. 3.2.2.2 The collectors shall be placed in the proximity of the test specimens. 3.2.2.3 Collection rates for each 80 cm2 of horizontal collection area should be in the range of 1.0 to 2.0 mL/h in each collector. Exposure zones for test specimens shall be established base
10、d on demonstrated conformance to the collection rate range. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW3286 Copyright 2011 General Motors Company All Rights Reserved October 2011 Page 2 of 4 3.2.2.4 The pH o
11、f the collected solution must be in the range of 6.5 to 7.2, when measured at 25 3 C. It may be necessary to adjust the pH by adding hydrochloric acid or sodium hydroxide or sodium bicarbonate solution of analytical grade. 3.2.2.5 The specific gravity of the collected solution shall be 1.025 to 1.04
12、0 when measured at 25 3 C. Note: Test chamber parameters, collection rates, pH, and specific gravity shall be monitored and recorded daily (excluding weekends) during normal operation. 3.3 Test Vehicle/Test Piece. Not applicable. 3.4 Test Time. Typical: Calendar time: 1 to 42 days Test hours: 24 to
13、1000 hours Coordination hours: 1 to 4 hours 3.5 Test Required Information. Not applicable 3.6 Personnel/Skills. Not applicable 4 Procedure 4.1 Preparation. 4.1.1 Test Solution Preparation. The salt solution in percent (%) by mass shall be as specified below: Sodium Chloride (NaCl): 5% Note: Reagent
14、grade or food grade sodium chloride may be used. The purity of the sodium chloride shall meet ISO 9227 (section 3.1) requirements. Water must meet ISO 9227 (section 3.1) requirements. 4.1.2 Sample Preparation. 4.1.2.1 Samples shall be suitably cleaned, if necessary, prior to exposure. The cleaning m
15、ethod shall be optional depending upon the nature of the surface and the type of contaminants. The cleaning shall not include the use of abrasives or solvents which may compromise the test surface. 4.1.2.2 Cut edges, backs, and other test specimen imperfections shall be suitably coated or protected,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW32862011NEUTRALSALTSPRAYNSSTESTENGLISHISSUE2 中性 NSS 试验 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-758020.html