GMW GMW15575-2013 General Specification for Vehicular Horns Issue 1 English.pdf
《GMW GMW15575-2013 General Specification for Vehicular Horns Issue 1 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW15575-2013 General Specification for Vehicular Horns Issue 1 English.pdf(38页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW15575 General Specification for Vehicular Horns Copyright 2013 General Motors Company All Rights Reserved June 2013 Page 1 of 38 Contents 1 Introduction. 5 1.1 Scope. 5 1.2 Mission/Theme. . 5 1.3 Classification. 5 2 References . 5 2.1 Externa
2、l Standards/Specifications. 5 2.2 GM Standards/Specifications. . 5 2.3 Additional References. 5 3 Test Preparation and Evaluation 6 3.1 Resources. 6 3.1.1 Calibration . 6 3.1.2 Alternatives. 6 3.1.3 Facilities 6 3.1.4 Equipment. 6 3.1.5 Test Vehicle/Test Piece. . 6 3.1.6 Test Time. . 6 3.1.7 Test Re
3、quired Information. . 6 3.1.8 Personnel/Skills. . 7 3.2 Preparation 7 3.3 Conditions. . 7 3.3.1 Environmental Conditions. 7 3.3.2 Test Conditions. 7 3.4 Instructions 7 3.5 Data . 7 3.6 Safety. 7 3.7 Documentation. . 7 3.7.1 Test Results. . 7 4 Requirements and Procedure 7 4.1 Regulatory Requirements
4、. . 7 4.1.1 United States. . 7 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15575 Copyright 2013 General Motors Company All Rights Res
5、erved June 2013 Page 2 of 38 4.1.2 Canada. 8 4.1.3 Europe, China, Indonesia, Confederation of Independent States (formerly Russia). 8 4.1.4 Japan. . 8 4.1.5 Gulf States. . 8 4.1.6 Brazil. 8 4.1.7 Taiwan 8 4.1.8 India. . 8 4.1.9 Republic of Korea . 8 4.2 Part Drawing Requirements. . 8 4.3 Pre-Release
6、 Requirements. 8 4.3.1 Design Failure Mode Effects Analysis (DFMEA). . 8 4.3.2 Process Failure Mode Effects Analysis (PFMEA) 8 4.3.3 Process Control Plan. . 8 4.4 Test Sample Performance and Failure Determination. . 9 4.5 Test Sample Size, Selection, Allocation, Identification and Disposition. . 9 4
7、.5.1 Test Sample Size. . 9 4.5.2 Test Sample Selection 9 4.5.3 Test Sample Allocation. 9 4.5.4 Test Sample Identification. . 9 4.5.5 Test Sample Disposition. 9 4.6 Functionality. . 9 4.7 Life Expectancy. 9 4.7.1 Electrical-Mechanical Horn Life Expectancy. . 9 4.7.2 Electronic Horn Life Expectancy. 1
8、0 4.8 Appearance. 10 4.9 Mechanical Requirements. 10 4.9.1 Mounting Orientation. 10 4.9.2 Mounting Torque. 10 4.9.3 Materials. 10 4.9.4 Bracket Attachment to Horn. . 10 4.9.5 Identification. . 10 4.9.6 Recyclability/Recoverability. . 10 4.10 Electrical and Audible Requirements. . 10 4.10.1 Polarity.
9、 10 4.10.2 Voltage Range. 10 4.10.3 Recommended Fusing and Wiring. 10 4.10.4 Terminations. . 11 4.10.5 Current Draw. 11 4.10.6 Readiness. 11 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license
10、 from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15575 Copyright 2013 General Motors Company All Rights Reserved June 2013 Page 3 of 38 4.10.7 Parasitic Load. 11 4.10.8 Connection Sequence. . 11 4.10.9 Insulation Resistance. . 11 4.10.10 Electromagnetic Compatibility. . 11 4.10.11 Fundamental Fre
11、quency. 12 4.10.12 Sound Pressure Level and Harmonic Frequency Content. 12 4.10.13 Variability. . 12 4.10.14 Adjustments. . 12 4.11 Mechanical Validation Test Requirements. 12 4.11.1 Noise and Rattles. 12 4.11.2 Vibration. . 12 4.11.3 Shock. . 15 4.11.4 Drop. 15 4.11.5 Free Fall. . 15 4.12 Climatic.
12、 . 15 4.12.1 Temperature. 15 4.12.2 Low Temperature Wakeup. . 16 4.12.3 Seven (7) Point Functional Check. 17 4.12.4 High Temperature Degradation Electronic Horn Only. . 18 4.12.5 Thermal Shock. . 18 4.12.6 Humidity 20 4.12.7 Corrosion. . 22 4.12.8 Dust. 22 4.12.9 Frost. . 22 4.12.10 Water Impingemen
13、t. 23 4.12.11 Water Immersion. 23 4.12.12 Altitude. . 24 4.12.13 Dimensional. . 24 4.13 Additional Electrical Tests Electronic Horn 24 4.13.1 Battery Voltage Dropout Test. 24 4.13.2 Sinusoidal and Pulse Superimposed Test. . 25 4.13.3 Reverse Polarity. . 25 4.13.4 Overvoltage . 25 4.14 Horn Connector
14、 Test Requirements. . 26 4.14.1 Terminal Push-out Force. . 26 4.14.2 Connector Engagement Force. . 26 4.14.3 Locked Connector Disengage Force. . 26 4.14.4 Unlocked Connector Disengagement Force. 26 4.14.5 Connector Installation Abuse, Side Force. . 26 Copyright General Motors Company Provided by IHS
15、 under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15575 Copyright 2013 General Motors Company All Rights Reserved June 2013 Page 4 of 38 4.15 Contaminants. . 27 4.16 Reliability/Durabilit
16、y Requirements. . 27 4.16.1 Combined Environmental Reliability Test (CERT). . 27 4.16.2 Durability Requirements. 28 4.16.3 Continuous Blow Requirements. 28 4.17 Serviceability and Service Parts Requirements. . 28 4.18 Quality Assurance. 28 4.18.1 Quality Assurance Requirements. 28 4.18.2 Process Con
17、trol. . 28 4.18.3 Reliability Re-Certification. 28 4.18.4 Quality Control Audits. 29 4.18.5 Audit Test Failures. . 29 4.18.6 Audit Documentation. . 29 5 Provisions for Shipping 29 5.1 Shipping . 29 5.2 Packaging. . 29 5.3 Lot Control. 29 6 Notes 29 6.1 Glossary. 29 6.2 Acronyms, Abbreviations, and S
18、ymbols. . 30 7 Additional Paragraphs 31 7.1 All parts or systems supplied to this specification must comply with the requirements of GMW3059, Restricted and Reportable Substances for Parts. . 31 8 Coding System . 31 9 Release and Revisions 31 Appendix A 32 A1.1 Severe Usage Regions. 32 A1.1.1 Backgr
19、ound. . 32 A1.1.2 Observations. . 32 A1.1.3 Electrical, Mechanical and Audible Requirements. 32 Appendix B 33 Appendix C 35 Appendix D 37 D1 GMW15575 Horn Test Plan Report 37 D1.1 Instructions. . 38 D1.2 Report Outline. 38 Copyright General Motors Company Provided by IHS under license with General M
20、otors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15575 Copyright 2013 General Motors Company All Rights Reserved June 2013 Page 5 of 38 1 Introduction Note: Nothing in this specification supercedes applicable laws a
21、nd regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Scope. This specification covers the requirements for horns for installation in General Motors Company (GM) vehicles. This document should be referenced on, and i
22、s thus an extension of engineering parts drawings covering these products. 1.2 Mission/Theme. The horn subsystem is required on all vehicles. Its purpose includes one or more of the following: An alerting device to be used by the operator of the vehicle to alert persons outside the vehicle to the ve
23、hicles position or motion. An annunciating device to inform the operator of the vehicle to some condition, or change of condition of the vehicle, e.g., alarm enabled. An alerting device for the purpose of warning away intruders, or for providing an audible vehicle locator. Although not a primary mis
24、sion of the horn, it is recognized that it is also used as a celebratory noise maker, e.g., parades, wedding processions, and should be capable of not being damaged by a reasonable amount of such usage. An alarm device for an anti-theft system. 1.3 Classification. Electrical-Mechanical and Electroni
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW155752013GENERALSPECIFICATIONFORVEHICULARHORNSISSUE1ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757669.html