GMKOREA EDS-T-5718-2008 SPECIFICATION FOR A SMART JUNCTION BOX TEST PROCEDURE.pdf
《GMKOREA EDS-T-5718-2008 SPECIFICATION FOR A SMART JUNCTION BOX TEST PROCEDURE.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5718-2008 SPECIFICATION FOR A SMART JUNCTION BOX TEST PROCEDURE.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto in the operating voltage of 9V16V, the operating temperature of -40+85(PASSENGER ROOM) and -40+105(UDHD), the storage temperature of -40+105(PASSENGER ROOM) and -40+125(UDHD). (2) If there are no special regulations, they shall be measured at the test voltage of over 4 points (9V, Nom
2、inal Voltage: 12V make free-fall of the fuse box with the stipulated harness connected to the concrete floor from 1M high in the both directions of X axis, and then in the both directions of Y axis and then Z axis. (2) Evaluation Criteria 1) No damage shall happen 2) Fuse, spare fuse, cover, and fus
3、e puller shall not be detached. 8.1.3.11. Torque of the attached Part (1) Test Method By screwing Nut(Bolt) up, connect the attached part onto the bracket of the body side of the real vehicle with Torque Lench. measure the Torque of the crack-creating installment part of the junction box. The measur
4、ement shall be made at room temperature, and the nuts (bolts) shall be the same used for the real vehicle. (After the junction box is stored in 0 constant temperature chamber for 12 hours, this test shall be taken). (2) Evaluation Criteria 1) M5: No Crack shall occur below the Torque noted on the dr
5、awing. 2) M6: No Crack shall occur below the Torque noted on the drawing. 8.1.3.12. Connector Distortion durability (1) Test Method Grab the junction box with hand, and turn the connector 10 times respectively in the direction crossing at the right angle, in back and forth direction, and in left and
6、 right direction, in order to insert it. (2) Evaluation Criteria 1) Appearance: No crack, corrosion, scratch, deformation, and discoloration shall occur. 2) Voltage Drop: follow 8.1.1(2). 8.1.3.13. Fixation Force of Terminal (1) Test Method Connect the electric codes-wired terminal to the box, and p
7、ull this at the speed of 20200X /min, using a push-pull gauge or a tension tester. Measure the load generated when the terminal is taken out from the box, and the measured values shall satisfy the evaluation criteria. And then, put 6Kgf load in the direction of 30from the horizontal and check whethe
8、r the terminal is taken out from the box or not. (2) Evaluation Criteria 280 MINI FUSE REC.: over 6Kgf of detachment force, 0.3 3.0SQ of diameter of the applied electric code 250 TAB TERMINAL: over 6Kgf of detachment force, 0.85 5.0SQ of diameter of the applied electric code When using non-above- st
9、ated specifications, record the specification and evaluation criteria on the drawing EDS-T-5718SPECIFICATION FOR SMART JUNCTION BOX TEST PROCEDURE PAGE: 17/21 ISSUED DATE: 2005. 07. 07 REVISED DATE: 2008. 10. 21 VERSION: 2 GM DAEWOO Auto & Technology which shall be used for the test. 8.2. Electrical
10、 Performance Test 8.2.1. Insulation resistance Test (1) Test Method Provide DC voltage (500V) to the fuse box with stipulated fuse and relays assembled for 1 minute and measure the case resistances between adjacent terminals, between adjacent codes, between terminals, or between the wiring plate. (2
11、) Evaluation Criteria Over 100 max. 8.2.2. Dielectric Resistance Test (1) Test Method After providing AC voltage (1000V) to the fuse box with the stipulated fuse assembled for 1 minute, measure if insulation destructions between adjacent holes, adjacent patterns happen. (2) Evaluation Criteria There
12、 shall be no insulation destruction. 8.2.3. Over-current Test (1) Test Method 1) Under the stabilized temperature condition of 40and +85(Passenger Room), and +105(UDHD), provide 135%, 200%, and 350% load currents of the fuse capacity to the circuit of the smart junction assembly whose wiring, fuse,
13、and relay connected, while using the rated voltage. Provide this load current until short-circuit. 2) Fuse Cut-out Test: provide 150% of currents for the real vehicle for 60 minutes. In case of the test, use the fuse whose capacity is higher than shunt or the rated capacity. 3) Over-Current Cycle Te
14、st: perform 720 cycles (1 Cycle means 135% of fuse capacity for 1 minute On and 9 minute OFF) by each circuit. In case of the test, use the fuse whose capacity is higher than the shunt or rated one. In case of the circuit without fuse, provide 150% of the current for the real vehicle. (2) Evaluation
15、 Criteria 1) Apparent crack, ignition, deformation of the box (sinking and contraction), discoloration, and the disconnection of PCB pattern shall not occur. 2) Voltage Drop: 8.1.1(2) shall be satisfied. 8.2.4. Real Load and Rated Capacity Temperature Increase Test (1) Test Method 1) For this test,
16、assemble electric codes, fuses, and relays in the smart junction box and provide the load as much as 100% of the rated capacity of the load current and fuse noted on the drawing (The reason of providing 100% current is to check the risk of ignition). 2) There shall be more than 10 measurement points
17、 which shall undergo PCB pattern soldering. EDS-T-5718SPECIFICATION FOR SMART JUNCTION BOX TEST PROCEDURE PAGE: 18/21 ISSUED DATE: 2005. 07. 07 REVISED DATE: 2008. 10. 21 VERSION: 2 GM DAEWOO Auto & Technology 3) Regarding test time, perform this test until the increased temperature of the load with
18、 100% rated capacity reaches the saturation. (2) Evaluation Criteria No deformation and defect (ignition and burning) shall occur in the smart junction box. PCB patterns shall not open the circuit. 8.3. Environmental Performance Test 8.3.1. Humidify Test (1) Test Method 1) Assemble the wiring in the
19、 fuse box according to the regulation, and set it under the condition of 852.5temperature and 90 95% RH humidity. After that, hang it for 96 hours without the reach of water drops. 2) During the test, provide DC voltage (14.5V) to the terminal and between the cases of adjacent terminals every 24 hou
20、r for short-circuit measurement. (2) Evaluation Criteria Leakage Current: The acceptable range of measurement shall be based on the drawing. If the drawing has no special regulations, the maximum current shall be 1mA. 8.3.2. Dust Test (1) Test Method Install the junction box assemble (relay excluded
21、) in the air-tight test chamber (the width, length, and height are 9001200mm), and ii) spray the pressured air to the 1.5kg of Portland cement (JIS Z-8901 8 types) for 10 seconds. While doing so, spread the air in an invariable way with a FAN. This process is 1Cycle, and 8Cycles shall be performed.
22、(2) Evaluation Criteria (the dust shall not affect the functions) 1) Voltage Drop: 8.1.1(2) shall be followed. 2) Leakage Current: Max 1mA (in case that DC 14.5V is provided) 3) Insulation resistance: Min. 100 8.3.3. Dew Test (1) Test Method Let the junction box assemble (relay excluded) in the cons
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST57182008SPECIFICATIONFORASMARTJUNCTIONBOXTESTPROCEDUREPDF

链接地址:http://www.mydoc123.com/p-757189.html