FORD WSS-M98P3-C-2016 SUN VISOR ASSEMBLY PERFORMANCE TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M98P3-C-2016 SUN VISOR ASSEMBLY PERFORMANCE TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M98P3-C-2016 SUN VISOR ASSEMBLY PERFORMANCE TO BE USED WITH FORD WSS-M99P1111-A .pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 01 2016 05 02 Editorial See Summary of Revisions A. Wagenhals, NA 2016 04 05 Released A. Wagenhals FNA Controlled document at www.MATS Copyright 2016, Ford Global Technologies, LLC Page 1 of 5 SUN VISOR ASSEMBLY, PERFORMANCE WSS-M98P3-C
2、1. SCOPE This specification defines the performance requirements for sunvisor assemblies. 2. APPLICATION This specification was released originally for materials used for sun visors. The construction is not defined but may include expanded polypropylene (EPP) with wire frames, or injection molded su
3、bstrates. The part may be covered with a welded PVC sheet or other polymeric films, knitted or nonwoven fabrics. Engineering drawings may specify the insertion of a mirror and/or heat set printed label. If present, components used in the sun visor must meet the following requirements: Interior Roof
4、System Fabric Performance WSS-M8P27-A1/latest Interior Plastic Parts WSS-M15P4-F/latest Label Performance WSS-M99P41-A10/A72/latest (applicable labels only) Note that vanity mirror components will not require approval to a Ford performance specification. They are considered a PIA component with an e
5、xpectation to meet all assembly requirements outlined in this specification. 2.1 LIMITATIONS All amorphous materials (such as PC, PC/ABS, ABS, SMA, ASA, PPO) should be evaluated for potential incompatibility with other materials that they may come in contact with per FLTM BO 127-03. 3. REQUIREMENTS
6、3.1 APPROVED SOURCES This specification is performance based and does not have approved sources. 3.2 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative humidity. T
7、esting of the material should occur in the conditioning environment or soon after removal. 3.3 DV/PV TEST PLAN PEC/FEC/PV testing must be conducted in compliance with program milestones unless otherwise specified by Ford Engineering. See Table 1 for DV/PV testing. For design changes, see Table 2. EN
8、GINEERING MATERIAL SPECIFICATION WSS-M98P3-C Copyright 2016, Ford Global Technologies, LLC Page 2 of 5 3.4 FOGGING (SAE J1756, 3 h at 100 C heating, 21 C cooling plate, post test conditioning 16 h) Fog Number 70 min Formation of clear film, droplets or crystals is cause for rejection. Fog evaluation
9、 is visual. Microscopic evaluation is used only for further evaluation of oily droplets or crystals. Sample shall be tested as an assembly if it is 100% bonded. If not 100% bonded, test each component separately. 3.5 ODOR Rating 3 max (FLTM BO 131-03) Sample shall be tested as part of a production a
10、ssembly composite if it is 100% bonded. If not 100% bonded, test each component separately. 3.6 FLAMMABILITY (ISO 3795) Burn Rate 100 mm/minute max Sample shall be tested as part of a production assembly composite if it is 100% bonded. If not 100% bonded, test each component separately. 3.7 CONSTRUC
11、TION PROPERTIES 3.7.1 Bond Strength (applicable to welded or sewn seams) 3.7.1.1 Original 50 N min 3.7.1.2 After Environmental Cycling 75% min of original In para 3.9. value Test Method: Specimens 15 mm in width and approx. 150 mm in length shall be cut across the bond line and then clamped in the j
12、aws of a tensile machine such that the bond line is centered between the jaws. The maximum breaking strength will be determined using a test speed of 500 mm/min. Report the average of all specimens tested. 3.7.2 Resistance to Mildew (7 days at 98 +/- 2 % relative humidity and 38 +/-2 C.) Test Method
13、 Cut specimens from the thickest section. Specimen size is 200 x 200 mm unless part size is smaller. Expose for 7 days in a humidity cabinet. Evaluation Remove the part from the cabinet and evaluate immediately. The part shall exhibit no visible evidence of mildew growth and/or objectionable odor af
14、ter 7 days exposure. ENGINEERING MATERIAL SPECIFICATION WSS-M98P3-C Copyright 2016, Ford Global Technologies, LLC Page 3 of 5 3.8 INDENTATION AND RECOVERY (FLTM BO 111-02, 1.5 kg load, 5 min recovery at room temp) The part shall not show any visible indentation marks. 3.9 ENVIRONMENTAL CYCLING Test
15、Method: Install a complete sun visor using production assembly techniques, in an approved test fixture or vehicle buck representative of intended production dimensions. Expose the vehicle (with windows open) or test buck to the following environmental cycle one time. After completion, condition the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM98P3C2016SUNVISORASSEMBLYPERFORMANCETOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-754207.html