FORD ESB-M4G267-A3-2014 SEALER - ELASTOMERIC TAPE FORM - WELDABLE HEAT EXPANDING (HIGH EXPANSION) - PRESSURE SENSITIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD ESB-M4G267-A3-2014 SEALER - ELASTOMERIC TAPE FORM - WELDABLE HEAT EXPANDING (HIGH EXPANSION) - PRESSURE SENSITIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M4G267-A3-2014 SEALER - ELASTOMERIC TAPE FORM - WELDABLE HEAT EXPANDING (HIGH EXPANSION) - PRESSURE SENSITIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Action Changes1990 06 07 NB00E10066633 Released CDR ERR MPWP 3948-a Page 1 of 6 SEALER - ELASTOMERIC TAPE FORM - WELDABLE ESB-M4G267-A3HEAT EXPANDING (HIGH EXPANSION) - PRESSURESENSITIVE1. SCOPEThe material defined by this spe
2、cification is an extruded tape formpressure sensitive heat expanding EPDM base sealer. It incorporates anethylene vinyl acetate film on one side to facilitate application of thesealer to the sheet metal.2. APPLICATIONThis specification was released originally for material used in the BodyShop for se
3、aling weld joints and openings where welding is not arequirement.It has an agressive pressure sensitive adhesive which promotes adhesion tooiled CRLC steel, galvanized steel and steel sheet, and zinc rich primercoated substrates. This material has good phosphate wash resistanceproperties. The materi
4、al expands during the electrocoat bake schedulesnoted per para 5.3.3. REQUIREMENTS3.1 STATISTICAL PROCESSSuppliers must conform to the requirements of Ford Quality SystemStandard Q-101. A mutually acceptable Control Plan as describedtherein is required for material/source approval. Appropriatestatis
5、tical tools must be used to analyze process/product data sothat variation in the final product is continuously reduced.3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSISFord Motor Company, at its option, may conduct infrared and/orthermal analysis of material/parts supplied to this specification
6、.The IR spectra and thermograms established for initial approval shallconstitute the reference standard and shall be kept on file at thedesignated material laboratory. All samples shall produce IR spectraand thermograms that correspond to the reference standard when testedunder the same conditions.N
7、OT TO BE USED FOR NEW DESIGN2014 N Status No replacement named L. Sinclair, NAENGINEERING MATERIAL SPECIFICATIONESB-M4G267-A3WP 3948-b Page 2 of 6 3.3 CONDITIONING AND TEST CONDITIONSAll test values indicated herein are based on ma terial conditioned ina control led atmosphere of 23 +/- 2 C and 50 +
8、/- 5 % relativehumidity for not less than 24 h prior to testing and tested under thesame conditions unless otherwise specified.3.4 DIMENSIONSAs specified on the Engineering Drawing and/or Weld Sealer Manual.3.5 CONSISTENCY, mm(ASTM D5 150 g total weight)Initial and after material aged 80 - 12072 h a
9、t 45 +/- 2 C3.6 SOLIDS, min 95 %(ASTM D 2834, except heat at 102 +/- 2 Cfor 3 h in a mechanical convection oven)3.7 SPECIFIC GRAVITY 1.2 +/- 0.25(ASTM D 297, hydrostatic method3.8 VOLUME EXPANSION(FLTM BV 8-2)3.8.1 5 minutes at 177 C metal temperature 150 - 250 %3.8.2 30 minutes at 205 C metal tempe
10、rature 150 - 250 %3.9 WATER ABSORPTION, %, max(FLTM BV 17-1)3.9.1 Method A Less than 2 %3.9.2 Method B Less than 2 %3.10 BRIDGING, max 2.0 mmTest Method: Position a 500 mm length strip of material over theho les in the fixture shown below. Prepare two assemblies andcondition at 23 +/- 2 C for 1 h. S
11、ubject one assembly to eachmaterial cure schedule per para 5.3.BRIDGING TEST FIXTURE ENGINEERING MATERIAL SPECIFICATIONESB-M4G267-A3WP 3948-b Page 3 of 6 3.11 SAG RESISTANCE,Max 6 mm(FLTM BV 18-1, substrate per para 5.2,material cure schedules per para 5.3)3.12 ADHESION CHARACTERISTICSTest Method: A
12、pply two 200 mm length ribbons of material to each oftwo 0.89 x 100 x 300 mm steel panels per para 5.2 and conditionpanels at 23 C +/- 2 C for 1 h. Bake one panel at each material cureschedul e per para 5.3. Position panels in a horizontal attitudeduring material bake. After bake, condition pan els
13、at 23 +/- 2 C for4 h min. Evaluate adhesion by inserting the tip of a sharp spatulaunder the end of the material strip. Grasp the tab of sealer andattempt to peel at 180 deg.The mat erial strip shall not be removable in a continuous coherentfilm. Observe for any indication that the material fails to
14、 adhereto the substrate or is brittle or friable.3.13 LOW TEMPERATURE RESISTANCE No cracking oradhesion failureTest Method: Prepare t wo 0.89 x 100 x 300 mm test panels para 3.11.Con dition the panels in a mechanical convection oven at 70 +/- 2 Cfor 7 days. Condition the samples at 23 +/- 2 C for 1
15、hour. Place thepanels in the slamming apparatus (FLTM BV 1-2) at - 29 +/- 2 C for 4hours. Slam each panel a total of 10 times.3.14 RESISTANCE TO CORROSION 500 h(ASTM B 117)No loss of adhesion or blistering of the material and no evidence ofcorrosion on the metal surface when subjected to salt spray.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM4G267A32014SEALERELASTOMERICTAPEFORMWELDABLEHEATEXPANDINGHIGHEXPANSIONPRESSURESENSITIVETOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-745599.html