FORD ESB-M33J3-B2-2015 ENAMEL COMPLIANCE VOC THERMOSET BASECOAT BASECOAT CLEARCOAT WET-ON-WET PROCESS WITH ESB-M33J3-B3 ETCH RESISTANT - EXTERIOR TO BE USED WITH FORD WSS-M99P1111.pdf
《FORD ESB-M33J3-B2-2015 ENAMEL COMPLIANCE VOC THERMOSET BASECOAT BASECOAT CLEARCOAT WET-ON-WET PROCESS WITH ESB-M33J3-B3 ETCH RESISTANT - EXTERIOR TO BE USED WITH FORD WSS-M99P1111.pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M33J3-B2-2015 ENAMEL COMPLIANCE VOC THERMOSET BASECOAT BASECOAT CLEARCOAT WET-ON-WET PROCESS WITH ESB-M33J3-B3 ETCH RESISTANT - EXTERIOR TO BE USED WITH FORD WSS-M99P1111.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、ENGINEERING MATERIAL SPECIFICATION ESB-M33J3-B2/B3 Page 2 of 20 Date Action Changes 2015 10 09 Revised Separated B2 B3 from remainder of document G. Weber, NA 1996 07 22 Revised Revised para 3.8.5.2, 3.8.9, 3.9.5.6 E. Nunez 1996 06 07 Revised Upd a solution in water of 0.75 % by weight CaSO4 adjuste
2、d to a pH of 4; deionized water (DI) and tap water, Bee Dropping (Ford Method 24). Apply 0.05 mL of specified solutions along entire length of two test panels. Place on gradient bar (38 C - 82 C, calibrated for heat-up rate of 2 minutes or less for 0.09 mm steel substrate).Remove one panel after 15
3、minutes at temperature, other after 30 minutes. Rinse any remaining solution with water. Examine panels for etching, discoloration, pitting, etc. Report etch-free temperature for test material and control. The test enamel shall display resistance to chemical attack which is equal to or better than c
4、urrently available automotive coatings technology. 3.8.4 Cold Checking Resistance 15 cycles (FLTM BI 107-02, Cold Cycling Procedure only) No cracking or noticeable dulling permitted. 3.8.4.1 Panel Preparation Prepare 3 panels according to para 3.4.1 through 3.4.4, applying paint at standard dry film
5、 thickness, utilizing the minimum, standard, and maximum enamel bakes of para 3.4.6 respectively. A total of 4 coats of enamel shall be applied to each panel and baked separately, using the required baking schedule. Scuff-sand between enamel coats using #400 grit sandpaper or equivalent. The film th
6、ickness of the combined cathodic electrocoat primer, primer surfaces and basecoat/clearcoat enamel shall be 380 +/- 5 micrometre. 3.8.5 Weathering Resistance 3.8.5.1 Florida Exposure 120 Mos. (SAE ENGINEERING MATERIAL SPECIFICATION ESB-M33J3-B2/B3 Page 12 of 20 J1976, Procedure A (To Failure) Miami
7、area, facing south standard rack at 5 deg from horizontal) Test the following systems: fully-fortified basecoat/ clearcoat systems - standard bake and catalyzed low bake repair; and unfortifed basecoat/clearcoat system - standard bake (neither basecoat nor clearcoat will contain UVAs or HALs). Prepa
8、re panels as per 3.4.5. Compare adhesion for fully formulated systems at low and standard film thicknesses Panels should be marked for SAE J1976, Procedure A testing on the back. A vertical 25 mm line is scribed at the lower left corner of panels prior to Florida exposure testing. (The scribe line i
9、s located 25 mm from the left edge of panel, and 10 mm from the bottom edge). Panels are exposed in 12 month intervals for a total of 120 months (i.e., 12 months, 24 months, 36 months). A total of 10 panels is required. Additional exposure panels shall be prepared and allowed to remain on test beyon
10、d the 10 year requirement until failure. Failure is defined as any degradation which will render the paint film unserviceable to the final customer. Note: The performance rating assigned to completed 60 Months Florida exposure panel takes precedence over a panel of the same material exposed for 2500
11、 h in accelerated weathering tests (Xenon Arc Weatherometer refer to para 3.8.6.2). Panels on exposure longer than 24 months shall be retrieved from exposure site and washed as per recommended washing procedure (FLTM BI 160-01, B, 1) every 24 months. Test for Adhesion on Completed Exposure Panels: C
12、lean exposure panels will be placed in a deionized water bath for 16 h per FLTM BI 104-01. After panels are removed from water bath and thoroughly blown dry, an “X“, to be located at the center of panel and 50 mm from the bottom, is scribed. The “X“ shall be 30 mm in height and 20 mm wide. Tape the
13、original scribe line and the “X“ scribe with 3M 898-2 tape and check for peeling and delamination between any layers. There shall be no blistering or delamination of any of the coating layers. After two years Florida exposure, the panels shall exhibit no more than 15 % loss of original 20 degree glo
14、ss (ref. para. 3.5.2) or more than 20 % loss of original DOI (ref. para. 3.5.4). Note: If the completed Florida exposure panels require more thorough cleaning to facilitate proper evaluation, the lower 1/3 of the panels may be polished with Ford Custom Silicone Gloss cleaner, part number B7AZ-19530-
15、AA, using a soft cloth. This procedure is performed only after the panels have been previously washed and subjected to water immersion and the “X“- scribe tape pull. ENGINEERING MATERIAL SPECIFICATION ESB-M33J3-B2/B3 Page 13 of 20 The panels shall show no more evidence of chalking, dulling, fading o
16、r other color change than the standard master sample on file. Also, the panels shall be free from cracking and microchecking when examined with the aid of a light source such as a Berkley Colortran Multi-1OA Lamp, Model 100-301 using a Sylvania 120V FBY bulb. Any evidence of such cracking or microch
17、ecking is considered to be a failure. 3.8.5.2 Accelerated Exposure 6000 h (Modified SAE J1960, (To Failure) Xenon Arc Weatherometer, using Type “S“ Borosilicate Inner and Outer filters, Radiant Exposure 0.55 W/m2) Clearcoat systems to be tested include: ESB-M33J3-A2 unfortified (without UVAs or HALs
18、), and ESB-M33J3-A2 fully-formulated (with UVAs & HALs). These will be prepared as per 5.3.2, 5.3.3, 5.3.5. Fully-formulated basecoat/clearcoat systems to be tested include: standard bake and catalyzed low-bake repair. Prepare panels as per 3.4.5. Compare adhesion for fully formulated systems at low
19、 and standard film thicknesses. Scribe vertical 25 mm line at lower left corner of panels and place in Apparatus at beginning of condensation cycle. Additional panels shall be prepared and tested to failure with failure being defined as any degradation rendering the film unserviceable to the final c
20、ustomer. Refer to para 5.3.1 for recommended testing schedule. Test for adhesion as per recommended procedure in Florida Exposure (3.8.6.1). After 2000 h in weatherometer, the panels should not exhibit more than 15 % loss of original gloss (ref para 3.5.2) or more than 20 % loss of original DOI (ref
21、 para 3.5.4). 3.8.6 Cracking Resistance 3 cycles (ISO 3231/DIN 50018 - SFW 2.0S) Testing is conducted in an environmental test chamber (Kesternich-type apparatus) as defined by ISO 3231/DIN 50018. The operation of the chamber during the test cycle shall be conducted in accordance with the procedures
22、 and requirements outlined in the Standard. Upon completion of required test cycles, the panels shall show no evidence of cracking, peeling, fissures or the formation of any film defects, in excess of those observed on a control panel, which could cause paint failures on vehicles. The control panel
23、shall be approved current production enamel which shall be exposed simultaneously with the test material. ENGINEERING MATERIAL SPECIFICATION ESB-M33J3-B2/B3 Page 14 of 20 3.8.6.1 Test Cycle 24 h per cycle A test cycle consists of the following: (1) During the deep heating moist SO2 phase (SFW 2.0S),
24、 the panels in the test chamber are exposed to an atmosphere consisting of 100 % relative humidity at 40 +/- 3 C, in the presence of 2.0 liters of sulfur dioxide for 8 hours. (2) The chamber atmosphere is then evacuated, and the cabinet door opened to ambient room conditions of 24 +/- 2 C and relati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM33J3B22015ENAMELCOMPLIANCEVOCTHERMOSETBASECOATBASECOATCLEARCOATWETONWETPROCESSWITHESBM33J3B3ETCHRESISTANTEXTERIORTOBEUSEDWITHFORDWSSM99P1111PDF

链接地址:http://www.mydoc123.com/p-745373.html