FORD ESB-M2G197-A-2014 ADHESION PRIMER FOR URETHANE STRUCTURAL ADHESIVE - (METAL TO FRP) TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD ESB-M2G197-A-2014 ADHESION PRIMER FOR URETHANE STRUCTURAL ADHESIVE - (METAL TO FRP) TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M2G197-A-2014 ADHESION PRIMER FOR URETHANE STRUCTURAL ADHESIVE - (METAL TO FRP) TO BE USED WITH FORD WSS-M99P1111-A .pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions2003 01 17 Revised Para 3.0 inserted ; Para 3.9 & 4 deleted 1982 05 01 Revised CAM1 DR 593035-1 1972 05 02 Released AB1-776 Printed copies are uncontrolled Page 1 of 3 Copyright 2002, Ford Global Technologies,
2、 Inc. ADHESION PRIMER, FOR URETHANE STRUCTURAL ESB-M2G197-A ADHESIVE - (METAL TO FRP) 1. SCOPEThe material defined by this specification is a modified synthetic polymer, solvent release primerthat must be heat cured prior to adhesive application.2. APPLICATIONThis specification was released original
3、ly as a material used for priming clean cold rolled steelreinforcements prior to bonding the reinforcements to FRP using ESB-M2G189 UrethaneStructural Adhesive.3. REQUIREMENTS3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standar
4、d Requirements For Production Materials (WSS-M99P1111-A). 3.1 COLOR Black 3.2 VISCOSITY at 23 +/- 2 C 20-50 cP (mPa.s) (ASTM D 2556, Brookfield Model RVT No. 1 Spindle at 50 RPM) 3.3 SOLIDS 13 -2 %(ASTM D 2046, except heat at 121 +/- 3C for 3 h in a mechanical convection oven) 3.4 DRYING TIME at 23
5、+/- 2 C, max 15 minutes Test Method: Apply a light film (0.0003-0.0010 in) (8-25 m) of the adhesion primer to the metal surface. The primer must be dry to the touch within the specified time limit. NOT TO BE USED FOR NEW DESIGN2014 12 08 N Status No replacement named L. Sinclair, NAENGINEERING MATER
6、IAL SPECIFICATION ESB-M2G197-A Page 2 of 3 Copyright 2002, Ford Global Technologies, Inc. 3.5 COVERAGE AND HEAT CURE Test Method: Apply the adhesion primer in a light film (0.0003-0.0010 in) (8-25 m) with no skips or bare spots evident. The primer may be applied by either brushing, spraying or wipin
7、g of clean metal surfaces. The primer shall be heat cured at one of the following temperatures prior to adhesive application: . 30 minutes at 150 C . 20 minutes at 175 C . 10 minutes at 205 C 3.6 STORAGE STABILITY The material shall be stored at temperatures below 38 C away from all sources of heat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM2G197A2014ADHESIONPRIMERFORURETHANESTRUCTURALADHESIVEMETALTOFRPTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-745308.html