FORD ESB-M2G190-A-2014 PRIMER ADHESION - URETHANE STRUCTURAL ADHESIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD ESB-M2G190-A-2014 PRIMER ADHESION - URETHANE STRUCTURAL ADHESIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M2G190-A-2014 PRIMER ADHESION - URETHANE STRUCTURAL ADHESIVE TO BE USED WITH FORD WSS-M99P1111-A .pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2014 12 08 N Status No replacement named L. Sinclair, NA 2003 01 24 Revised Para 3.0 inserted ; Para 3.10 & 4 deleted 1971 03 03 Released AA1-220 Page 1 of 3 Copyright 2014, Ford Global Technologies, Inc. PR
2、IMER, ADHESION - URETHANE STRUCTURAL ADHESIVE ESB-M2G190-A NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material defined by this specification is a chemically reactive, non-flammable, solvent release, air drying, adhesion wash primer. 2. APPLICATION This specification was released originally for a mat
3、erial used for priming FRP (glass fiber reinforced polyester) prior to the application of structural adhesive. The primer air cures at 23 +/- 2 C and does not require heat cure prior to or after adhesive application. 3. REQUIREMENTS 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material supplie
4、rs and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.1 COLOR Red or Orange or as specified 3.2 VISCOSITY Shall be water thin for easy wash priming of the FRP substrate. 3.3 SOLIDS 2 - 3% (ASTM D 2046, except heat at 70 C for 10 min in
5、a mechanical convection oven) 3.4 EVAPORATION LOSS Shall not be drawn off in volumes that will not be utilized within 8 hrs. Material shall be maintained in closed containers at all times. ENGINEERING MATERIAL SPECIFICATION ESB-M2G190-A Page 2 of 3 Copyright 2014, Ford Global Technologies, Inc. 3.5
6、DRYING RATE at 23 +/- 2 C, max 2 minutes Test Method: Apply a light wet film (approximately 0.0003 - 0.0005 in (8 - 13 m) to a flat surface of an FRP panel. The primer must be dry to the touch within the specified time limit. The applied primer must flash off at least one minute before adhesive is a
7、pplied, but must not be reapplied if the open time exceeds 16 hrs. at 23 +/- 2 C. 3.6 COVERAGE No skips or bare spots Test Method: Apply the adhesion primer in a light wet coating with no skips or bare spots evident. The primer may be applied by either brushing, spraying or wiping. 3.7 STORAGE STABI
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM2G190A2014PRIMERADHESIONURETHANESTRUCTURALADHESIVETOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-745307.html