ETSI TR 102 935-2012 Machine-to-Machine communications (M2M) Applicability of M2M architecture to Smart Grid Networks Impact of Smart Grids on M2M platform (V2 1 1)《机器对机器通信(M2M) M2_1.pdf
《ETSI TR 102 935-2012 Machine-to-Machine communications (M2M) Applicability of M2M architecture to Smart Grid Networks Impact of Smart Grids on M2M platform (V2 1 1)《机器对机器通信(M2M) M2_1.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 102 935-2012 Machine-to-Machine communications (M2M) Applicability of M2M architecture to Smart Grid Networks Impact of Smart Grids on M2M platform (V2 1 1)《机器对机器通信(M2M) M2_1.pdf(58页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TR 102 935 V2.1.1 (2012-09) Machine-to-Machine communications (M2M); Applicability of M2M architecture to Smart Grid Networks; Impact of Smart Grids on M2M platform Technical Report ETSI ETSI TR 102 935 V2.1.1 (2012-09) 2Reference DTR/M2M-00011 Keywords M2M, smart grid, smart meter, use case E
2、TSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice Individual copies of the present document can be
3、 downloaded from: http:/www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the ref
4、erence shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI document
5、s is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: http:/portal.etsi.org/chaircor/ETSI_support.asp Copyright Notification No part may be reproduced except as authorized by written permiss
6、ion. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2012. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Ma
7、rks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association. ETSI ETSI TR 102 935 V2.1.1 (2012-09) 3Contents Intellectual Property Rights 5g3Foreword . 5g31 Scope 6g32 References 6g32.
8、1 Normative references . 6g32.2 Informative references 6g33 Definitions and abbreviations . 8g33.1 Definitions 8g33.2 Abbreviations . 9g34 Introduction and Background . 10g34.1 Description of Smart Grids architecture concept 11g34.2 Key Technical Elements of Smart Grid 12g34.2.1 Distributed Energy R
9、esources (DER) . 12g34.2.2 Demand Response (DR) . 13g34.2.3 Electric Vehicle (EV) 13g34.2.4 Building/Home Energy Management (BHEM) 14g34.2.5 Smart Metering . 14g34.2.6 Advanced Distribution Automation (ADA) 15g34.2.7 Communications . 16g34.3 Smart Grid Standardisation 16g34.3.1 European conceptual m
10、odel 16g34.3.2 NIST conceptual model 17g34.4 Smart Grid Roles and Responsibilities . 19g34.5 SG Communication Requirement values in Relation to M2M services . 22g35 Smart Grid Use Cases. 22g35.1 Smart Grid Energy Layer Use Case . 23g35.1.1 Advanced Distribution Automation WAMS (Wide Area Measurement
11、 System) 23g35.1.1.1 Scope and Objectives of Use Case 23g35.1.1.2 Narrative of Use Case . 23g35.1.1.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 24g35.1.1.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 24g35.1.2 DER control (Dis
12、tributed Energy Resources) . 24g35.1.2.1 Scope and Objectives of Use Case 24g35.1.2.2 Narrative of Use Case . 25g35.1.2.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 25g35.1.2.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 25g35.
13、1.2.5 Drawing or Diagram of Use Case 26g35.1.3 DR control (Demand Response) for large scale application . 26g35.1.3.1 Scope and Objectives of Use Case 26g35.1.3.2 Narrative of Use Case . 27g35.1.3.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 27g35.1.3.
14、4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 27g35.1.3.5 Drawing or Diagram of Use Case . 28g35.1.4 DS supervision (Distribution System) 28g35.1.4.1 Scope and Objectives of Use Case 28g35.1.4.2 Narrative of Use Case . 28g35.1.4.3 Actors: People, Systems, Applications, Datab
15、ases, the Power System, and Other Stakeholders 29g35.1.4.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 29g35.1.4.5 Drawing or Diagram of Use Case 29g35.1.5 DER, DR/Microgrid control . 30g35.1.5.1 Scope and Objectives of Use Case 30g35.1.5.2 Narrative of Use Case . 30g35.1.5.
16、3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 31g3ETSI ETSI TR 102 935 V2.1.1 (2012-09) 45.1.5.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 31g35.1.5.5 Drawing or Diagram of Use Case 31g35.1.6 Electric Vehicle (EV) charging and
17、 power feed . 32g35.1.6.1 Scope and Objectives of Use Case 32g35.1.6.2 Narrative of Use Case . 32g35.1.6.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 33g35.1.6.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 34g35.1.6.5 Drawing o
18、r Diagram of Use Case . 34g35.1.7 PV Generation (Photo Voltaic) . 34g35.1.7.1 Scope and Objectives of Use Case 34g35.1.7.2 Narrative of Use Case . 35g35.1.7.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 35g35.1.7.4 Issues: Legal Contracts, Legal Regulat
19、ions, Constraints and others . 36g35.1.7.5 Drawing or Diagram of Use Case . 36g35.2 Control and Connectivity Layer Use Cases 36g35.2.1 Use Case for Service Providers Management . 36g35.2.1.1 Scope and Objectives of Use Case 36g35.2.1.2 Narrative of Use Case . 37g35.2.1.3 Actors: People, Systems, App
20、lications, Databases, the Power System, and Other Stakeholders 38g35.2.1.4 Drawing or Diagram of Use Case . 39g35.3 Service Layer Use Cases 39g35.3.1 Home-DR applications (Demand Response) for consumer appliances 39g35.3.1.1 Scope and Objectives of Use Case 39g35.3.1.2 Narrative of Use Case . 40g35.
21、3.1.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 41g35.3.1.4 Drawing or Diagram of Use Case . 42g35.3.2 Home Energy Management (HEM) 42g35.3.2.1 Scope and Objectives of Use Case 42g35.3.2.2 Narrative of Use Case . 43g35.3.2.3 Actors: People, Systems, A
22、pplications, Databases, the Power System, and Other Stakeholders 43g35.3.2.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 44g35.3.2.5 Drawing or Diagram of Use Case . 45g35.3.3 Submetering 45g35.3.3.1 Scope and Objectives of Use Case 45g35.3.3.2 Narrative of Use Case . 46g35.
23、3.3.3 Actors: People, Systems, Applications, Databases, the Power System, and Other Stakeholders 46g35.3.3.4 Issues: Legal Contracts, Legal Regulations, Constraints and others . 46g35.3.3.5 Drawing or Diagram of Use Case . 46g35.3.4 Smart Grid/Metering Service Layer 47g35.3.4.1 Use Scope and Objecti
24、ves of Use Case . 47g35.3.4.2 Narrative of Use Case . 47g35.3.4.3 Issues: Legal Contracts, Legal Regulations, Constraints and others . 49g35.3.4.4 Referenced Standards and / or Standardization Committees (if available) . 51g35.3.4.5 Drawing or Diagram of Use Case . 52g36 Applicability of M2M archite
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1029352012MACHINETOMACHINECOMMUNICATIONSM2MAPPLICABILITYOFM2MARCHITECTURETOSMARTGRIDNETWORKSIMPACTOFSMARTGRIDSONM2MPLATFORMV211

链接地址:http://www.mydoc123.com/p-736232.html