EN 62439-1-2010 en Industrial communication networks - High availability automation networks - Part 1 General concepts and calculation methods (Incorporates Amendment A2 2017)《工业通信.pdf
《EN 62439-1-2010 en Industrial communication networks - High availability automation networks - Part 1 General concepts and calculation methods (Incorporates Amendment A2 2017)《工业通信.pdf》由会员分享,可在线阅读,更多相关《EN 62439-1-2010 en Industrial communication networks - High availability automation networks - Part 1 General concepts and calculation methods (Incorporates Amendment A2 2017)《工业通信.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、Industrial communicationnetworks High availabilityautomation networksPart 1: General concepts and calculation methodsBS EN 62439-1:2010+A1:2012raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationNational forewordThis British Stand
2、ard is the UK implementation of EN 62439-1:2010. It isidentical to IEC 62439-1:2010. Together with BS EN 62439-2:2010, BS EN62439-3:2010, BS EN 62439-4:2010, BS EN 62439-5:2010 and BS EN 62439-6:2010, it supersedes BS EN 62439:2008 which is withdrawn.The UK participation in its preparation was entru
3、sted to Technical CommitteeAMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Us
4、ers are responsible for its correct application. BSI 2010ISBN 978 0 580 65552 4ICS 25.040.40; 35.040; 35.110Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 30 June
5、 2010.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 62439-1:2010National forewordThis British Standard is the UK implementation of EN 62439-1:2010. It isidentical to IEC 62439-1:2010. Together with BS EN 62439-2:2010, BS EN62439-3:2010, BS EN 62439-4:2010, BS EN
6、 62439-5:2010 and BS EN 62439-6:2010, it supersedes BS EN 62439:2008 which is withdrawn.The UK participation in its preparation was entrusted to Technical CommitteeAMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this commit
7、tee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Users are responsible for its correct application. BSI 2010ISBN 978 0 580 65552 4ICS 25.040.40; 35.040; 35.110Compliance with a British Standard cannot confer immuni
8、ty fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 30 June 2010.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 62439-1:2010National forewordThis British Standard is the UK implementati
9、on of EN 62439-1:2010. It isidentical to IEC 62439-1:2010. Together with BS EN 62439-2:2010, BS EN62439-3:2010, BS EN 62439-4:2010, BS EN 62439-5:2010 and BS EN 62439-6:2010, it supersedes BS EN 62439:2008 which is withdrawn.The UK participation in its preparation was entrusted to Technical Committe
10、eAMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Users are responsible for it
11、s correct application. BSI 2010ISBN 978 0 580 65552 4ICS 25.040.40; 35.040; 35.110Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 30 June 2010.Amendments issued si
12、nce publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 62439-1:2010BS EN 62439-1:2010+A1:2012 BRITISH ST The British Standards Institution 2012. Published by BSI Standards Limited 2012This British Standard is the UK implementation of EN 62439-1:2010+A1:2012. It is identical to IEC 62439-1:2
13、010 incorporating amendment 1:2012. It supersedes BS EN 62439-1:2010, which is withdrawn.The start and finish of text introduced or altered by amendment is indicated in the text by tags. Tags indicating changes to IEC text carry the number of the IEC amendment. For example, text altered by IEC amend
14、ment 1 is indicated by .ISBN 978 0 580 73807 4Amendments/corrigenda issued since publicationDate Text affected30 November 2012 Implementation of IEC amendment 1:2012 with CENELEC endorsement A1:2012EUROPEAN STANDARD EN 62439-1 NORME EUROPENNE EUROPISCHE NORM March 2010 CENELEC European Committee for
15、 Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: Avenue Marnix 17, B - 1000 Brussels 2010 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. R
16、ef. No. EN 62439-1:2010 E ICS 25.040; 35.040 Supersedes EN 62439:2008 (partially)English version Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods (IEC 62439-1:2010) Rseaux de communication industrielle Rseaux dautomatisme ha
17、ute disponibilit Partie 1 : Concepts gnraux et mthodes de calcul (CEI 62439-1:2010) Industrielle Kommunikationsnetze - Hochverfgbare Automatisierungsnetze - Teil 1: Grundlagen und Berechnungsmethoden (IEC 62439-1:2010) This European Standard was approved by CENELEC on 2010-03-01. CENELEC members are
18、 bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to t
19、he Central Secretariat or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the
20、same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Nethe
21、rlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. BS EN 62439-1:2010August 2012EN 62439-1:2010+A1EN 62439-1:2010 - 2 - Foreword The text of document 65C/583/FDIS, future edition 1 of IEC 662439-1, prepared by SC 65C, Industrial networks
22、, of IEC TC 65, Industrial-process measurement, control and automation, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 62439-1 on 2010-03-01. This EN 62439-1 together with EN 62439-2, EN 62439-3, EN 62439-4, EN 62439-5 and EN 62439-6 supersedes EN 62439:2008. This E
23、N 62439-1:2010 includes the following significant technical changes with respect to EN 62439:2008: adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protoc
24、ol), moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to EN 62439-1, which serves now as a base for the other documents, moving Clause 5 (MRP) to EN 62439-2 with minor editorial changes, moving Clause 6 (PRP) was to EN 624
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN6243912010ENINDUSTRIALCOMMUNICATIONNETWORKSHIGHAVAILABILITYAUTOMATIONNETWORKSPART1GENERALCONCEPTSANDCALCULATIONMETHODSINCORPORATESAMENDMENTA22017

链接地址:http://www.mydoc123.com/p-721343.html