《EN 62424-2009 en Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools (Remains Current)《过程控制工程的表示法 P&I图表和.pdf》由会员分享,可在线阅读,更多相关《EN 62424-2009 en Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools (Remains Current)《过程控制工程的表示法 P&I图表和.pdf(138页珍藏版)》请在麦多课文档分享上搜索。
1、Representation of process control engineering Requestsin P 35.240.50Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 31 May 2010.Amendments issued since publication
2、Amd. No. Date Text affectedBRITISH STANDARDBS EN 62424:2009EUROPEAN STANDARD EN 62424 NORME EUROPENNE EUROPISCHE NORM August 2009 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central S
3、ecretariat: Avenue Marnix 17, B - 1000 Brussels 2009 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62424:2009 E ICS 35.240.50; 25.040.40 English version Representation of process control engineering - Requests in P it shall not
4、allow unguided automatic changes. The configurable checking step shall include functionality for automatic or manual acceptance of data changes, allowing single decisions up to bulk data management. All changes in the proprietary database and all discovered data inconsistencies shall be reported by
5、the import application. The generation of the report shall be configurable. The import/export application has to assure that the intersection of the different databases contains the same information, and that additional division specific data is handled in a consistent way. Data manipulation by a pr
6、oject division is an ongoing process during the whole project and beyond it. Thus the creation, changing and deletion of data shall be possible during the life-cycle of the plant. CAEX databases have to be consistent. This requires a consistency check before exporting the data. This procedure has to
7、 be followed after a successful data manipulation in a P 2) mandatory fields being filled in; 3) correct use of numbering system of the PCE requests. Inconsistent data shall not be exported. b) generate PCE relevant information; c) check for changed information in comparison with previously stored d
8、ata in the neutral database; d) renaming of PCE request shall be supported by the export functionality; e) perform data export from proprietary into neutral database: 1) e. g. if the PCE request has been changed, the old PCE request within the neutral database has to be deleted and the new one shall
9、 be exported from the proprietary database into the neutral database. The old PCE request information shall be stored in a backup storage system; 2) Other changes shall be performed with the existing object. f) generate reports after each data exchange: e. g. new PCE requests list, missing PCE reque
10、sts list, changed PCE requests list, deleted PCE requests list, problems and error list. Data import from neutral database into the target database shall comprise the following activities: g) generate PCE relevant information from neutral database; h) check for changed information by comparing the n
11、eutral database with the target database; i) perform data import from the neutral into the proprietary database; j) renaming of PCE request shall be supported by the import functionality; k) generate reports after each data exchange: 1) e. g. error lists; 2) inconsistencies due to imported data shal
12、l be detected by the target application during the import process and are not considered within this standard. 6 Representation of PCE requests in a P b) the graphical representation of PCE requests in a P c) the type of functional connection between the PCE requests: the control functions; d) the g
13、raphical representation of signals in a P&ID. In addition the reference designation scheme used for PCE requests in a P&ID shall be specified. Detailed information on complex control functions shall not be part of the P&ID. Therefore, additional documentation (e.g. control narratives, function chart
14、s) has to be prepared to define the required functionality. A control function shall also be individually identified and shall be represented on the P&ID. 6.3 Requirements for the identification and representation of PCE requests 6.3.1 General Each PCE request shall be graphically represented by a b
15、ubble, which collects all information about the functional requirements. Three data fields inside and ten data fields outside the bubble are defined to hold all the information of a PCE request (see Figure 3). For detailed information see 6.3.3 to 6.3.9. USxxxx.3AH SHH AH SHH YS xxxx.4 AL OH PCE loo
16、p xxxx (optional) PCE request PCE control function aPCE request FIxxxx.2 TIxxxx.1 PCE request BS EN 62424:2009 18 62424 IEC:2008(E) Figure 3 General representation of a PCE-Request in a P&ID As stated before, only the PCE functionality shall be depicted on the P&ID, not the PCE implementation. In ex
17、ceptional cases however, there might be constellations where the presentation of detailed realization information is inevitable. For example, in the case of a multi-sensor element which means an instrument that produces measurements for different categories, every category shall be represented by it
18、s own bubble. The bubbles are stacked up, as shown in Figure 4. Figure 4 Multi-sensor element In all cases where the PCE request is connected to the equipment or pipe, this shall be shown by a full line, connecting the bubble with the equipment or pipe. 6.3.2 Types of lines Signal lines are used to
19、illustrate the functional relationship between PCE requests. A signal line shall be depicted as a dashed line with an arrow to indicate the information flow. Source of information flow shall be a bubble of a PCE control function or request or switching action consisting of the six fields right outsi
20、de the bubble. The sink of information flow shall be a bubble of a PCE request or a control function. Process connections shall be depicted by a solid line without a direction. Multi-sensor instruments with only one process connection shall have an extra bubble for each category and only one process
21、 connection. 6.3.3 Displaying the location of the operator interface Each PCE request is graphically represented by a bubble. This standard distinguishes the location of the operator interface between a local interface, a local control panel and a central control room. The location does not reflect
22、any realization in systems. A local interface shall be represented as shown in Figure 5. It could be e. g. a pressure gauge. PCE category and functionPCE IdentificationPU Vendor Typical ident. Device information ZHHHAHSHHALALLSLLLSafety relevant GMPQuality relevant (SIL3)DIxxxxFIxxxxPIxxxxBS EN 6242
23、4:200962424 IEC:2008(E) 19 PIxxxxFigure 5 Local interface Operator action/information on a local control panel shall be represented as shown in Figure 6. HSxxxxFigure 6 Manually operated switch in local control panel Remote requests operated in a central control room shall be represented as shown in
24、 Figure 7. PIxxxxFigure 7 Pressure indication in central control room 6.3.4 PCE categories and processing functions 6.3.4.1 Indication of PCE categories and processing functions The upper part of the bubble shall show the information of the PCE category and its PCE processing function. Each bubble s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN624242009ENREPRESENTATIONOFPROCESSCONTROLENGINEERINGREQUESTSINPIDIAGRAMSANDDATAEXCHANGEBETWEENPIDTOOLSANDPCECAETOOLSREMAINSCURRENT

链接地址:http://www.mydoc123.com/p-721330.html