《EN 12255-3-2000 en Wastewater Treatment Plants - Part 3 Preliminary Treatment (Incorporating Corrigendum December 2000)《废水处理工厂 第3部分 预处理 合并勘误表2000年12月》.pdf》由会员分享,可在线阅读,更多相关《EN 12255-3-2000 en Wastewater Treatment Plants - Part 3 Preliminary Treatment (Incorporating Corrigendum December 2000)《废水处理工厂 第3部分 预处理 合并勘误表2000年12月》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS EN 12255-3:2000 Incorporating Corrigendum No. 1 Wastewater treatment plants Part 3: Preliminary treatment The European Standard EN 12255-3:2000 has the status of a British Standard ICS 13.060.30 BS EN 12255-3:2000 This British Standard, having been prepared under the direction of
2、 the Sector Committee for Building and Civil Engineering, was published under the authority of the Standards Committee and comes into effect on 15 December 2000 BSI 2006 ISBN 0 580 36451 8 National foreword This British Standard was published by BSI. It is the UK implementation of EN 12255-3:2000, i
3、ncluding Corrigendum December 2000. The start and finish of text introduced or altered by corrigendum is indicated in the text by tags . Tags indicating changes to CEN text carry the number of the CEN amendment. For example, text altered by CEN Corrigendum 1 is indicated in the text by . The UK part
4、icipation in its preparation was entrusted by Technical Committee B/505, Wastewater engineering, to Subcommittee B/505/40, Wastewater treatment plants. A list of organizations represented on B/505/40 can be obtained on request to its secretary. Further information regarding design and loading data c
5、an be found in the informative national annex. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. Compliance with a British Standard cannot confer immunity from legal obligations. Amendments issued since publica
6、tion Amd. No. Date Comments 16723 Corrigendum No. 1 31 October 2006 See national foreword(8523($167$1$5 1250(8523e(11( (8523b,6 Part 3: Preliminary treatment; Part 4: Primary settlement; Part 5: Lagooning processes; Part 6: Activated sludge processes; Part 7: Biological fixed-film reactors; Part 8:
7、Sludge treatment and storage; Part 9: Odour control and ventilation; Part 10: Safety principles; Part 11: General data required; Part 12: Control and automation; Part 13: Chemical treatment; Part 14: Disinfection; Part 15: Measurement of the oxygen transfer in clean water in aeration tanks of activa
8、ted sludge plants; Part 16: Physical (mechanical) filtration. NOTE For requirements on pumping installations at wastewater treatment plants and in their water feed field, provided initially as Part 2: Pumping installations for wastewater treatment plants, see EN 752-6, Drain and sewer systems outsid
9、e buildings - Part 6: Pumping installations. The parts EN 12255-1, EN 12255-3 to EN 12255-8 and EN 12255-10 and EN 12255-11 were implemented together as a European package (Resolution BT 152/1998). The date of withdrawal (dow) of all conflicting national standards is 2001-12-31. Until the date of wi
10、thdrawal is reached the National and the already published European standards both coexist. 1 Scope This part of this European Standard specifies the requirements for preliminary treatment of wastewater at wastewater treatment plants for over 50 PT. The primary application is for wastewater treatmen
11、t plants designed for the treatment of domestic and municipal wastewater. Preliminary treatment may include one or more of the following options: screening; grit removal; grease separation; flow balancing and flow separation. 1) inpreparation.1) 1) 1) BSI 2006Page 4 EN 12255-3:2000 NOTE Flow measure
12、ment and/or sampling provision may be included with any of the chosen options. Differences in wastewater treatment throughout Europe have led to a variety of systems being developed. This standard gives fundamental informations about the systems; this standard has not attempted to specify all availa
13、ble systems. Detailed information additional to that contained in this standard may be obtained by referring to the Bibliography. 2 Normative references This European Standard incorporates by dated or undated references, provision from other publications. These normative references are cited at the
14、appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this European Standard only when incorporated in it by amendment or revision. For undated references the latest edition of the p
15、ublication referred to applies. EN 1085 Wastewater treatment Vocabulary. prEN 12255-1:1996 Wastewater treatment plants Part 1: General construction principles. prEN 12255-10:2000 Wastewater treatment plants Part 10: Safety principles. prEN 12255-11:1998 Wastewater treatment plants Part 11: General d
16、ata. 3 Terms and definitions For the purposes of this European Standard the terms and definitions given in EN 1085 apply. 4 Requirements 4.1 General Preliminary treatment units are an important part of the overall wastewater treatment process, since they serve to ensure that the subsequent main trea
17、tment stages operate effectively. The preliminary process requires the removal of large floating and suspended solids, grit, grease and oil. Unless preliminary units are correctly designed, variations in flow may cause operational problems in the subsequent processes. This is particularly true of sm
18、aller plants. The type and size of units are influenced by the overall system and the nature of the wastewater to be treated. Combined sewerage systems usually have greater variations in flow than separate systems so that storm water separation arrangements and/or flow balancing may be necessary. Gr
19、it removal may be required to prevent damage to following treatment units and pumps. Where treatment plants receive significant amounts of organic industrial wastes, e.g. from food processing, the provision of grease and oil removal units is essential. 4.2 Planning The design considerations for a pr
20、eliminary treatment system shall include a combination of the acceptable options to fulfil the process. Selection shall be based on an assessment of the characteristics of the wastewater to be treated, the size of the installation and its technical and economic consequences on subsequent processes.
21、BSI 2006Page 5 EN 12255-3:2000 The requirements for the installation should be determined after consideration of the following factors: the effect of the flows on the subsequent treatment processes; the need to limit retention time in order to avoid septicity and/or premature sedimentation; fine scr
22、eening and its influence upon sludge treatment and the necessity for primary treatment; grit removal with or without grease and oil separation; requirements for the disposal of grit and, the necessity for or possibility of grit washing; the reliability of the treatment process; the need to provide f
23、rost protection for exposed pipework and equipment where it is warranted. Once the requirements for the installation have been determined, consideration should be given to the requirements for the chosen site taking into account collection and disposal of screenings, grit, grease and oil. In additio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN1225532000ENWASTEWATERTREATMENTPLANTSPART3PRELIMINARYTREATMENTINCORPORATINGCORRIGENDUMDECEMBER2000

链接地址:http://www.mydoc123.com/p-706028.html