《DLA MIL-HDBK-271-106-1986 STRUCTURAL PANEL FASTENERS-INSTALLATION& REMOVAL METHODS FOR MIL-F-85616 MIL-F-85617& MIL-F-85618《MIL-F-85616 MIL-F-85617& MIL-F-85618结构嵌板紧固件的安装和拆除方法》.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-HDBK-271-106-1986 STRUCTURAL PANEL FASTENERS-INSTALLATION& REMOVAL METHODS FOR MIL-F-85616 MIL-F-85617& MIL-F-85618《MIL-F-85616 MIL-F-85617& MIL-F-85618结构嵌板紧固件的安装和拆除方法》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、F, _. MIL-HDBK-271-106 20 .JANUARY -1 986 B+ STRUCTURAL PANEL FASTENERS-INSTALLATION AND REMOVAL METHODS FOR f MIL-F-856 16, MIL-F-856.1 7 AND .MIL-F-856 18 ! AMSC NIA FSC 53GP Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-HDBK-271-106 DEPARTME
2、NT OF DEFENSE WASHINGTON 25 OC 20361 MIL-HDBK-271-106 Structural Panel Fasteners, Installation and Reme.val Methods 1. This standardization handbook was developed by the Department of Defense in accordance with established procedure. 2. This publication was approved on 20 January 1986 for printing a
3、nd inclusion in the military standardization handbook series. 3. This handbook provides installation and removal methods for structural panel fasteners including hole preparation and procedures for installing and removing the grommet, sleevebolt, and receptacle barrel. It will provide valuable infor
4、mation and guidance to mechanics at Navy, Army and Air Force Rework Facilities. 4. This handbook is not to be referenced in procurement specifications except for information purposes, nor shall it supersede any specification requirements. 5. Every effort has been made to include the latest informati
5、on on installation and removal methods of panel fasteners. Mechanics should review this handbook periodically. Users of this handbook are encouraged to report any errors or recom- mendations to the Commanding Officer, Naval Lakehurst, NJ 08733. .Air Engineering Center, Code 93, SESD, 6. The individu
6、al parts covered in this hand- book should be ordered under the specifi- cation sheets associated with MIL-F-85616 (stud), MIL-F-85617 (receptacle), and MIL- G-85618 (grommet). Specifics .concerning the part numbering scheme are covered in Section . 4. Provided by IHSNot for ResaleNo reproduction or
7、 networking permitted without license from IHS-,-,-CONTENTS Paragraph Page 1. SCOPE . 1 1.1 Scope . 1 2. REQUIREMENTS AND METHODS 2 2.1 Panel hole preparation 2 2.2 Substructure hole preparation . 2 2.3 Grornnet installation and removal. 3 2.3.1 Installing grommet into panel . 3 2.3.2 Removing gromm
8、et from metal panels 4 2.3.3 Removing grommet from composite 2.4 panels 5 Sleevebolt. installation and removal . 5 2.4.1 Installing sleevebolt into grommet . 5 2.4.2 Removing sleevebolt from grommet. 6 2.5 Receptacle barrel installation . and removal . 7 2.5.1 Installing barrel into sub- structure 7
9、 2.5.2 Barrel removal 8 3. COMPLETING INSTALLATION . 8 3.1 Final seating torque 8 4. PARTS NUMBEKI NG AND TOOLING PROCUREMENT . 9 4.1 4.2 Stud number example . 9 Receptacle number example . . . . . . . 9 4.3 Grommet number example 9 4.4 Tooling procurement . 9 ii Provided by IHSNot for ResaleNo repr
10、oduction or networking permitted without license from IHS-,-,-MIL-HDBK-271-106 1. SCOPE 1.1 Scope. This handbook covers the use and maintenance of structural panel fasteners. It illustrates use of the installation and removal tools, product identification, panel preparation and seating torque values
11、. Figure 1 shows the various parts of the assembly. TTSLEE VEBOLT PANEL GROMMET RING ASSY. GASKEP ASSEMBLY FIGURE 1. Parts of fastener assembly. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. : 2. REQUIREMENTS AND METHODS 2.1 Panel hole preparatio
12、n. Prepare the panel hole -for grommet installation in accordance with Figure 2 and Table I. LE3 dia.4 FIGURE 2. Panel hole meDaration. TABLE I. Panel hole dimensions. I Di ameter B Dia. A Dia. Dia.-Nom. Dash No. Fastener -4 I .250“ .403 I ,316 1 .393 .312 -5 .375 .476 .379 .486 ,312“ I I I I I 1 -6
13、 ,472 ,568 .375“ .558 .468 i 2.2 Substructure hole preparation. Prepare hole for receDtacle in accordance with Fiaure 3 d and Table II. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-R-J dia. tY P. MIL-HDBK-271-106 II I I FIGURE 3. Substructure ho
14、le DreDaration. TABLE 2. Substructure hole dimensions. Di ameter Dash No. Di a. Rivet Dia. -4 .O98 .873 .313 .lo3 .877 .318 -5 .O98 .748 ,253 ,103 .752 .257 -6 .130 .998 .377 .135 1.002 ,383 2.3 Grommet installation and removal. 2.3.1 Installing grommet into panel. Insert qrommet shank into fastener
15、 hole from the bottom ;ide so that large diameter of grommet is against the inside of the panel. Put threaded stud assembly of installation tool through gromet and fastener hole from the inside and engage the nut component (see Table III). “Install“ end of nut should be toward the grommet. Turn nut
16、until it contacts the grommet. Inspect to ensre that grommet and tool are properly seated, then wrench until the shank is flared to fit the countersink and the grommet is difficult to turn (70 inch pounds max). Figure 4 illustrates this procedure. Provided by IHSNot for ResaleNo reproduction or netw
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILHDBK2711061986STRUCTURALPANELFASTENERSINSTALLATIONREMOVALMETHODSFORMILF85616MILF85617MILF85618MILF85616MILF85617MILF85618

链接地址:http://www.mydoc123.com/p-691405.html