DIN 2430-3-2009 Piping for pigging systems - Part 3 Trial pigging (prior to commissioning)《生铁装置管道 第3部分 使用前测试》.pdf
《DIN 2430-3-2009 Piping for pigging systems - Part 3 Trial pigging (prior to commissioning)《生铁装置管道 第3部分 使用前测试》.pdf》由会员分享,可在线阅读,更多相关《DIN 2430-3-2009 Piping for pigging systems - Part 3 Trial pigging (prior to commissioning)《生铁装置管道 第3部分 使用前测试》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、February 2009DEUTSCHE NORM Translation by DIN-Sprachendienst.English price group 5No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (D
2、IN-Normen).ICS 23.040.01!$XyI“1538638www.din.deDDIN 2430-3Piping for pigging systems Part 3: Trial pigging (prior to commissioning)Rohrleitungen fr Molchanlagen Teil 3: Prfungen vor InbetriebnahmeSupersedesDIN 2430-3:2002-11www.beuth.deDocument comprises 5 pagesIn case of doubt, the German-language
3、original should be consulted as the authoritative text.DIN 2430-3:2009-02 2 Contents Page Foreword. 3 1 Scope . 4 2 Preliminary checks and inspections. 4 3 Trial pigging 4 3.1 General. 4 3.2 Liquid medium 4 3.3 Gaseous medium 5 3.4 Evaluation 5 4 Safety information 5 DIN 2430-3:2009-02 3 Foreword Th
4、is standard has been prepared by Technical Committee NA 082-00-03 AA Molchbare industrielle Rohr-leitungen of the Normenausschuss Rohrleitungen und Dampfkesselanlagen (Piping and Boiler Plant Standards Committee). The DIN 2430 series of standards comprises: Part 1: Straight pipes and elbows Part 2:
5、Pipe joints Part 3: Trial pigging (prior to commissioning) Amendments This standard differs from DIN 2430-3:2002-11 as follows: a) Clause 3.4 “Evaluation” has been modified. Previous editions DIN 2430-3: 1924-09, 1929-12, 2002-11 DIN 2430-3:2009-02 4 1 Scope This standard deals with the trial piggin
6、g, prior to commissioning, of piping systems. It describes two methods of trial pigging which serve to check the quality of the piggable components of the system. 2 Preliminary checks and inspections Prior to trial pigging the following shall be carried out: checking the installed piping system for
7、conformity with the DIN 2430 standards series; preliminary cleaning of piping system by purging; inspection of piping system for external defects; checking the pipe fixing elements for adequate resistance to the dynamic loads induced during pigging; inspection of piping system for internal defects u
8、sing an intelligent pig or a video camera; function testing of valves; pressure and leaktightness test in accordance with relevant codes of practice; checking the pig with respect to its type, dimensions, material and surface finish, documenting the results. Trial pigging shall be carried out using
9、the same pig type as is used in service. 3 Trial pigging 3.1 General Trial pigging shall be carried out to obtain an indication of the quality of pipes, pipe bends and welds as well as of the proper functioning of valves. Trial pigging also serves to detect and localize defects on pipes, pipe bends,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN243032009PIPINGFORPIGGINGSYSTEMSPART3TRIALPIGGINGPRIORTOCOMMISSIONING 生铁 装置 管道 部分 使用 测试 PDF

链接地址:http://www.mydoc123.com/p-655168.html