DIN 18007-2000 Demolition works - Concepts procedures fields of application《拆除 方案、程序、应用场所》.pdf
《DIN 18007-2000 Demolition works - Concepts procedures fields of application《拆除 方案、程序、应用场所》.pdf》由会员分享,可在线阅读,更多相关《DIN 18007-2000 Demolition works - Concepts procedures fields of application《拆除 方案、程序、应用场所》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、ICS 01.040.91; 91.200Abbrucharbeiten Begriffe, Verfahren, AnwendungsbereicheRef. No. DIN 18007 : 2000-05English price group 06 Sales No. 010602.02DEUTSCHE NORM May 200018007Continued on pages 2 to 9. No part of this translation may be reproduced without the prior permission ofDIN Deutsches Institut
2、fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).Translation by DIN-Sprachendienst.In case of doubt, the German-language original should be consulted as the authoritative text.Demolition workTerminology, techniques a
3、nd applicationsContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Normative references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Concepts . . . . . . . . . . . . . . . . .
4、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Demolition techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Appendix A Suitability and effects of demolition techniques . . . . . . . . . . . . 8Explanatory notes . . . . . . . .
5、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ForewordThis standard has been prepared by Technical Committee Abbrucharbeiten of the NormenausschussBauwesen (Building and Civil Engineering Standards Committee).IntroductionBy clarifying the terminology used, this sta
6、ndard will improve communication between those involved intendering and other activities related to demolition work, a field that is constantly growing in complexity.Since the design and execution of demolition work demands in-depth knowledge of the demolition fabric(i.e. structures, plant and compo
7、nents), of the techniques used, and of the resulting materials, coupled withwide experience with such, only those companies (and specialists) may be entrusted with such work thatmeet these requirements and are capable of ensuring that such work is carried out properly.The persons in charge of demoli
8、tion work shall ensure that this is carried out under observance of therelevant regulations.Demolition work shall be supervised and monitored by persons who are authorized to do so and havesufficient know-how.The statutory requirements covering safety at work and accident prevention, and the regulat
9、ions for healthand safety issued by the industrial employers liability insurance associations apply even where no specificreference is made to them.In principle, the demolition technique is at the discretion of the company carrying out the work. In somecases, however (e.g. when safety, environmental
10、, economic aspects or ensuing works need to beconsidered) techniques may be specified.Emissions and other effects of demolition work shall also be taken into account when selecting a suitabletechnique.Page 2DIN 18007 : 2000-051 ScopeThis standard deals with the terminology and specifies techniques t
11、o be used in the partial or total demolitionof structures, components and plant, and when making holes in existing buildings. For the purposes of thisstandard, components shall be taken to include parts of plant and the applications described to cover allmaterials resulting from demolition work.2 No
12、rmative referencesThis standard incorporates, by dated or undated reference, provisions from other publications. Thesenormative references are cited at the appropriate places in the text, and the titles of the publications are listedbelow. For dated references, subsequent amendment to or revisions o
13、f any of these publications apply to thisstandard only when incorporated in it by amendment or revision. For undated references, the latest edition ofthe publication referred to applies.DIN 20163 Blasting Terminology, units and symbols3 Concepts3.1 Demolition by grappleRemoval of components using gr
14、apple equipment.3.2 StrippingProgressive removal of material in layers.3.3 DrillingMaking of holes in components.3.4 Flame cuttingCutting through steel by burning a combination of gas and oxygen.3.5 Powder cuttingCutting through components by oxidation of iron powder.3.6 Thermic lancingBurning, pier
15、cing, cutting and separation of components by inducing an oxidation process at the tip of an ironlance.3.7 DismantlingNon-destructive recovery of components by lifting after undoing their connections.3.8 ThrustDemolition by exerting a horizontal thrust.3.9 ImpactDestruction or loosening of component
16、s by application of kinetic energy.3.10 PullingDemolition by application of tensile forces.3.11 Water jettingCutting through components by means of a concentrated jet of water.3.12 Plasma cuttingCutting through components by means of ionized gases.3.13 Demolition by pulverizerCrushing or detachment
17、of components by jaw action.3.14 Breaking-upBreaking up of components using hydraulic excavator shovels and ripper teeth.Page 3DIN 18007 : 2000-053.15 SawingSeverance of components by means of saws (e.g. hand-held saws, chain saws, ring and chain saws, withdiamond blades, by the dry cutting or water
18、-cooled method).3.16 Demolition by hydraulic shearsCutting through, or reducing the size, of structures or components by shear jaw action.3.17 SplittingFracturing or weakening of components by use of hydraulic bursters or expanding agents.3.18 BlastingLoosening, crushing, or causing the collapse of
19、components or structures, or reduction of their height, with theaid of explosives.3.19 MortisingLoosening or reducing the size of components using a chisel or point cutting edge.4 Demolition techniques4.1 GeneralThe techniques described in the following may be used alone or in combination. Depending
20、 on their size, toolsand equipment will be either hand-held or machine-operated.It shall be ensured that machinery, persons and debris have adequate structural support at all times.The structural stability of components and surfaces on which demolition machinery and persons stand anddemolition mater
21、ial is stored shall be ensured.Working spaces and exclusion zones shall be of adequate size.The usability of machinery in demolition operations depends on its reach.4.2 Demolition by grappleDemolition by grapple is effected by mechanical or hydraulic equipment that simultaneously grips and pullscomp
22、onents.a) Main applications: Loosening of masonry or timber components, and separation of debris.b) Conditions of application: Components to be removed shall be pre-loosened using another techniqueunless they are already loosely joined to the rest.4.3 ImpactImpact is effected manually using an impac
23、t hammer or mechanically by a demolition ball suspended from alifting appliance.a) Main applications: Crushing and loosening of plain concrete, reinforced concrete and masonrycomponents.b) Conditions of application: No parts of the structure in the vicinity shall require to be retained. Vibrationmus
24、t be taken into account.4.4 ThrustStructures or components are pushed in or over manually or mechanically as a result of pressure exerted bymechanical or hydraulic equipment (e.g. pusher arms, demolition poles).a) Main applications: Causing timber or masonry components to topple over.b) Conditions o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN180072000DEMOLITIONWORKSCONCEPTSPROCEDURESFIELDSOFAPPLICATION 拆除 方案 程序 应用 场所 PDF

链接地址:http://www.mydoc123.com/p-653824.html