CLC TS 50537-3-2010 Railway applications - Mounted parts of the traction transformer and cooling system - Part 3 Water pump for traction converters《轨道交通 牵引变压器和冷却系统安装部件 第3部分 牵引变流器用水.pdf
《CLC TS 50537-3-2010 Railway applications - Mounted parts of the traction transformer and cooling system - Part 3 Water pump for traction converters《轨道交通 牵引变压器和冷却系统安装部件 第3部分 牵引变流器用水.pdf》由会员分享,可在线阅读,更多相关《CLC TS 50537-3-2010 Railway applications - Mounted parts of the traction transformer and cooling system - Part 3 Water pump for traction converters《轨道交通 牵引变压器和冷却系统安装部件 第3部分 牵引变流器用水.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationRailway applications Mountedparts of the traction transformerand cooling systemPart 3: Water pump for traction convertersDD CLC/TS 50537-3:2010National forewordThis Draft for Dev
2、elopment is the UK implementation of CLC/TS 50537-3:2010.The UK participation in its preparation was entrusted by Technical CommitteeGEL/9, Railway Electrotechnical Applications, to Subcommittee GEL/9/2,Railway Electrotechnical Applications - Rolling stock.A list of organizations represented on this
3、 committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Users are responsible for its correct application. BSI 2010ISBN 978 0 580 69508 7ICS 23.080; 29.180; 45.060.10Compliance with a British Standard cannot confer
4、 immunity fromlegal obligations.This Draft for Development was published under the authority of theStandards Policy and Strategy Committee on 30 April 2010.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDDD CLC/TS 50537-3:2010TECHNICAL SPECIFICATION CLC/TS 50537-3 SPCIF
5、ICATION TECHNIQUE TECHNISCHE SPEZIFIKATION February 2010 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: Avenue Marnix 17, B - 1000 Brussels 2010 CENELEC - All rights
6、 of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. CLC/TS 50537-3:2010 E ICS 29.180; 45.060.10 English version Railway applications - Mounted parts of the traction transformer and cooling system - Part 3: Water pump for traction converters Applications fer
7、roviaires - Accessoires des transformateurs de traction et systmes de refroidissement - Partie 3: Pompe eau pour convertisseurs de puissance Bahnanwendungen - Anbauteile des Haupttransformators und Khlsystems - Teil 3: Wasserpumpe fr Traktionsumrichter This Technical Specification was approved by CE
8、NELEC on 2010-01-22. CENELEC members are required to announce the existence of this TS in the same way as for an EN and to make the TS available promptly at national level in an appropriate form. It is permissible to keep conflicting national standards in force. CENELEC members are the national elec
9、trotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Swede
10、n, Switzerland and the United Kingdom. DD CLC/TS 50537-3:2010CLC/TS 50537-3:2010 - 2 - Foreword This Technical Specification was prepared by Working Group 25 of SC 9XB, Electromechanical material on board rolling stock, of Technical Committee CENELEC TC 9X, Electrical and electronic applications for
11、 railways. It was circulated for voting in accordance with the Internal Regulations, Part 2, Subclause 11.3.3.3 and was accepted as a CENELEC Technical Specification on 2010-01-22. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. C
12、EN and CENELEC shall not be held responsible for identifying any or all such patent rights. The following date is proposed: latest date by which the existence of the CLC/TS has to be announced at national level (doa) 2010-07-22 The CLC/TS 50537 series “Railway applications Mounted parts of the tract
13、ion transformer and cooling system” consists of four different parts: Part 1: HV bushing for traction transformers; Part 2: Pump for insulating liquid for traction transformers and reactors; Part 3: Water pump for traction converters; Part 4: Gas and liquid actuated (Buchholz) relay for liquid immer
14、sed transformers and reactors with conservator for rail vehicles. The CLC/TS 50537 series shall be read in conjunction with CLC/TS 50534 1)“Railway applications - Generic system architectures for onboard electric auxiliary power systems”. This standardization project was derived from the EU-funded R
15、esearch project MODTRAIN (MODPOWER). It is part of a series of standards, referring to each other. The hierarchy of the standards is intended to be as follows: 1)Under development. DD CLC/TS 50537-3:2010- 3 - CLC/TS 50537-3:2010 Overview on the technical frameworkCLC/TS 50534 defines the basis for o
16、ther depending standardsCLC/TS 50534Railway applications - Generic system architectures for onboard electric auxiliary powers systemsCLC/TS 50535Railway applications - Onboard auxiliary power converter systemLevel 1: ArchitecturesEN 50533Three-phase train line voltage characteristicsEN 50546Shore (e
17、xternal) supply systems for rail vehiclesEN 50547Batteries for rail vehiclesCLC/TS 50537-1Part 1: HV bushing for traction transformersCLC/TS 50537-2Part 2: Pump for insulating liquid for traction transformers and reactorsCLC/TS 50537-3Part 3: Water pump for traction convertersCLC/TS 50537-4Part 4: G
18、as and liquid actuated (Buchholz) relay for liquid immersed transformers and reactors with conservator for rail vehiclesLevel 2: Systems, InterfacesLevel 3: ComponentsMounted parts of the traction transformer and cooling systemDD CLC/TS 50537-3:2010CLC/TS 50537-3:2010 - 4 - Contents 1 Scope . 6 2 No
19、rmative references. 6 3 Terms and definitions 7 4 Operating conditions . 8 4.1 General 8 4.2 Environmental conditions . 8 4.3 Cooling liquid 9 4.4 Storage and transport conditions . 9 5 Electrical requirements .10 5.1 Power supply 10 5.2 Electrical connection with three-phase train line 10 5.3 Conne
20、ctor (electrical requirements) .12 5.4 Temporary loss of voltage supply 12 5.5 Insulation class and temperature rise 12 5.6 Starting current.13 5.7 Electrical discharge machining (EDM) .13 6 Mechanical requirements 13 6.1 General 13 6.2 Vibration measurement 13 6.3 Preferred dimensions .13 6.4 Conne
21、ctor (mechanical requirements) .17 7 Hydraulic requirements .17 7.1 Hydraulic performance .17 7.2 Hydraulic interchangeability .18 7.3 Preferred values .19 8 Fire protection 23 9 Reliability and lifetime .23 10 Material 24 11 Noise 24 12 Markings 24 13 Documentation .25 14 Testing .25 14.1 General 2
22、5 14.2 List of tests .26 14.3 Description of tests 26 Bibliography 29 DD CLC/TS 50537-3:2010- 5 - CLC/TS 50537-3:2010 Figures Figure 1 Typical connection to three-phase train line 11 Figure 2 Connectors with contact arrangement View onto mating side 12 Figure 3 Main dimensions of centrifugal water p
23、umps . 14 Figure 4 Main dimensions of peripheral water pumps . 16 Figure 5 Hole pattern of the preferred connector socket 17 Figure 6 Hydraulic interchangeability across the allowable operating range . 18 Figure 7 Hydraulic interchangeability across an actual flow rate . 19 Figure 8 Pump characteris
24、tic (Q-H-diagram) at a frequency of 50 Hz . 20 Figure 9 Pump characteristic (Q-H-diagram) at a frequency of 60 Hz . 20 Figure 10 Pump characteristic (Q-P-diagram) at a frequency of 50 Hz . 21 Figure 11 Pump characteristic (Q-P-diagram) at a frequency of 60 Hz . 21 Figure 12 Pump characteristic (Q-H-
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CLCTS5053732010RAILWAYAPPLICATIONSMOUNTEDPARTSOFTHETRACTIONTRANSFORMERANDCOOLINGSYSTEMPART3WATERPUMPFORTRACTIONCONVERTERS

链接地址:http://www.mydoc123.com/p-629599.html