COE EP 1110-1-8 VOL 1-2009 Construction Equipment Ownership and Operating Expense Schedule Region I《施工设备的所有权和运行费用表I》.pdf
《COE EP 1110-1-8 VOL 1-2009 Construction Equipment Ownership and Operating Expense Schedule Region I《施工设备的所有权和运行费用表I》.pdf》由会员分享,可在线阅读,更多相关《COE EP 1110-1-8 VOL 1-2009 Construction Equipment Ownership and Operating Expense Schedule Region I《施工设备的所有权和运行费用表I》.pdf(570页珍藏版)》请在麦多课文档分享上搜索。
1、 EP 1110-1-8 Volume 1 November 2009 Construction Equipment Ownership and Operating Expense Schedule Region I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
2、-,-,-DEPARTMENT OF ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 This pamphlet supersedes EP 1110-1-8, dated 31 July 2007. REPLY TO ATTENTION OF: CECW-EC Pamphlet 30 November 2009 No. 1110-1-8, Vol. 1 CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE 1. Purpose. This pamp
3、hlet is authorized by and established in accordance with Federal Acquisition Regulation (FAR) 31.105 and Engineer Federal Acquisition Regulation (EFAR) SUBPART 31.105. This pamphlet establishes predetermined equipment ownership and operating expense rates for construction equipment. This pamphlet al
4、so establishes a method to calculate equipment ownership and operating expense rates for construction equipment when the predetermined rates are not considered appropriate. The overall intent of this pamphlet is to determine equipment costs that are fair and reasonable. Expense factors for calculati
5、ng dredge plant and marine equipment costs are provided in chapter 4. 2. Applicability. This pamphlet applies to all USACE commands. It is applicable to all solicitations and contracts for construction expected to exceed the Simplified Acquisition Threshold of $100,000 when actual cost data for both
6、 ownership and operating costs cannot be determined. This volume is for use in Region I, which includes the following states: Connecticut Maine Massachusetts New Hampshire New Jersey New York Pennsylvania Rhode Island Vermont 3. References. See APPENDIX A. 4. Distribution Statement. Approved for pub
7、lic release, distribution is unlimited. FOR THE COMMANDER: 12 Appendixes STEPHEN L. HILL (See Table of Contents) Colonel, Corps of Engineers Chief of Staff EP 1110-1-8, Vol. 130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-This page intentio
8、nally left blankEP 1110-1-8, Vol. 130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents CHAPTER 1.0 - INTRODUCTION 1.1 Use 1-1 1.2 Decision Flow Process 1-1 1.3 Ho
9、w to Obtain Assistance 1-1 1.4 How to Obtain CHECKRATE Spreadsheet 1-2 1.5 How to Obtain this Publication. 1-2 CHAPTER 2.0 - METHODOLOGY FOR CONSTRUCTION EQUIPMENT SECTION I. GENERAL.2-1 2.1 Contents 2-1 2.2 Basis for Equipment Rates 2-1 2.3 Total Hourly Rate. 2-1 SECTION II. OPERATING CONDITIONS.2-
10、2 2.4 Average, Difficult, or Severe Conditions 2-2 2.5 Determination of Condition 2-3 SECTION III. EQUIPMENT SELECTION2-3 2.6 General 2-3 2.7 Truck Selection 2-3 2.8 Crawler Tractor Selection 2-3 2.9 Equipment Accessories. 2-4 SECTION IV. EQUIPMENT VALUE .2-4 2.10 List Price and Accessories. 2-4 2.1
11、1 Discount Code (DC) 2-4 2.12 Sales or Import Tax . 2-4 2.13 Freight . 2-4 2.14 Total Equipment Value (TEV) 2-4 SECTION V. LIFE .2-5 2.15 Economic Life (LIFE). 2-5 2.16 Working Hours Per Year (WHPY) 2-5 SECTION VI. SALVAGE VALUE .2-5 2.17 Salvage Value (SLV) . 2-5 2.18 Salvage Value Percentage 2-5 E
12、P 1110-1-8, Vol. 130 Nov 09Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iiCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) SECTION VII. OWNERSHIP COST2-6 2.19 Ownership Elements . 2-6 2.20 Depreciation
13、2-6 2.21 Facilities Capital Cost of Money (FCCM). 2-7 SECTION VIII. OPERATING COST2-7 2.22 Operating Cost Elements 2-7 2.23 Fuel Cost . 2-8 2.24 Filters, Oil, and Grease (FOG) Cost 2-9 2.25 Repair Cost 2-10 2.26 Tire Wear Cost 2-12 2.27 Tire Repair Cost 2-13 SECTION IX. STANDBY HOURLY RATE2-14 2.28
14、Standby Hourly Rate . 2-14 SECTION X. RATE CALCULATION EXAMPLE2-14 2.29 Computation Example . 2-14 CHAPTER 3.0 - ADJUSTMENTS TO HOURLY RATES SECTION I. GENERAL.3-1 3.1 Contents 3-1 3.2 Basis for Equipment Rates 3-1 3.3 Equipment Rate Adjustment Tables 3-1 3.4 Determination for Use of Equipment Rates
15、 in Tables 2-1 and 2-2.3-1 SECTION II. RATE ADJUSTMENTS3-2 3.5 Rate Adjustments 3-2 3.6 Changes in Operating Conditions 3-2 3.7 Change in Cost of Money Rate (CMR) 3-2 3.8 Actual Work Hours Greater than 40 Hours per Week 3-3 3.9 Changes in Fuel Cost 3-4 3.10 Adjustments to Fuel, Oil, and Grease (FOG)
16、 Cost 3-5 3.11 Equipment of Different Age than Table 2-1 . 3-5 3.12 Rate Adjustment for Overage Equipment 3-6 3.13 Standby Rate Adjustment for Equipment of a Different Age than Table 2-13-7 3.14 Equipment Purchased Used 3-8 3.15 Rate Calculation Examples 3-8 EP 1110-1-8, Vol. 130 Nov 09Provided by I
17、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iiiCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) CHAPTER 4.0 - METHODOLOGY FOR DREDGING PLANT AND MARINE EQUIPMENT SECTION I. GENERAL.4-1 4.1 Contents 4-1 4.2 General
18、4-1 SECTION II. ANNUAL USE4-1 4.3 Time Available to Dredge 4-2 SECTION III. LIFE 4-2 4.4 Life. 4-2 4.5 Annual Hours Available . 4-3 SECTION IV. SALVAGE VALUE .4-3 4.6 Salvage Value (SLV) . 4-3 SECTION V. OWNERSHIP COST4-3 4.7 Ownership Cost. 4-3 4.8 Depreciation Factor . 4-4 4.9 The Cost of Money Ra
19、te (CMR) Factor . 4-4 4.10 Other Ownership Elements 4-5 SECTION VI. OPERATING FACTORS 4-5 4.11 Hourly Operating Cost. 4-5 4.12 Prime and Secondary Power. 4-5 4.13 Water, Lube, and Supplies (WLS) . 4-6 4.14 Repairs (RPR) . 4-6 SECTION VII. STANDBY4-7 4.15 Standby Rate. 4-7 SECTION VIII. NEGOTIATED PR
20、OCUREMENT .4-7 4.16 Rates. 4-7 4.17 Allowance for Additional Capital Improvements. 4-8 4.18 Overage Plant 4-8 4.19 Dredging Plant Purchased Used . 4-8 SECTION IX. RATE CALCULATION EXAMPLE .4-8 4.20 Rate Calculation Example . 4-8 EP 1110-1-8, Vol. 130 Nov 09Provided by IHSNot for ResaleNo reproductio
21、n or networking permitted without license from IHS-,-,-ivCONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE Table of Contents (Continued) List of Tables Table 2-1. Hourly Equipment Ownership and Operating Expense 2-21 Table 2-2. Hourly Rate Elements.2-253 Table 3-1. Equipment Age Adjust
22、ment Factors .3-9 Table 3-2. Equipment Age Adjustment Factors .3-33 Table 4-1. Dredging Plant Cost Factors 4-9 List of Figures Figure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction Equipment1-3 Figure 2-1. Equipment Rate Computation Worksheet .2-15 Figure 3-1
23、. Total Hourly Rate Calculation for Overage Equipment3-25 Figure 3-2. Standby Hourly Rate Calculation for Overage Equipment.3-49 Figure 4-1. Months Available by Region4-2 Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet 4-13 List of Appendixes Appendix A References .A-1 Appendix B A
24、rea Factors .B-1 Appendix C Guide for Selecting Operating Conditions C-1 Appendix D Equipment Hourly Calculation Factors. D-1 Appendix E Economic Indexes for Construction Equipment E-1 Appendix F Tire Description and Tire Cost F-1 Appendix G Tire Life and Tire Wear Factors . G-1 Appendix H Manufactu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COEEP111018VOL12009CONSTRUCTIONEQUIPMENTOWNERSHIPANDOPERATINGEXPENSESCHEDULEREGIONI 施工 设备 所有权 运行 费用 IPDF

链接地址:http://www.mydoc123.com/p-620658.html