COE CEGS 16375-1999 ELECTRICAL DISTRIBUTION SYSTEM UNDERGROUND NOTICE 1-8 (1999) INCORPORATED《地下配电系统 合并通知1-8(1999)》.pdf
《COE CEGS 16375-1999 ELECTRICAL DISTRIBUTION SYSTEM UNDERGROUND NOTICE 1-8 (1999) INCORPORATED《地下配电系统 合并通知1-8(1999)》.pdf》由会员分享,可在线阅读,更多相关《COE CEGS 16375-1999 ELECTRICAL DISTRIBUTION SYSTEM UNDERGROUND NOTICE 1-8 (1999) INCORPORATED《地下配电系统 合并通知1-8(1999)》.pdf(69页珍藏版)》请在麦多课文档分享上搜索。
1、CEGS DEPARTMENT OF THE ARMY CEGS-16375 (November 19 92 ) U.S. ARMY CORPS OF ENGINEERS Superseding CEGS-16375 (December 1989) GUIDE SPECIFICATION FOR CONSTRUCTION Includes changes through Notice 8 (May 1999) Includes Special Change (Tailoring Options) (June 1998) Includes Text Adjustment Change (Octo
2、ber 1999) Latest change indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 16 - ELECTRICAL SECTION 16375 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND 11/92 PART 1 GENERAL 1 - 1 REFERENCES 1.2 GENERAL REQUIREMENTS 1.2.1 Terminology 1.2.2 Service Conditions 1.3 SUBMITTALS 1.4 DELIVERY, STORAGE, A
3、ND HANDLING 1.5 EXTRA MATERIALS PART 2 PRODUCTS 2.1 STANDARD PRODUCT 2.2 NAMEPLATES 2.2.1 General 2.2.2 Liquid-Filled Transformer Nameplates 2.3.1 Aluminum Materials 2.3.2 Ferrous Metal Materials 2.3 CORROSION PROTECTION 2.3.2.1 Hardware 2.3.2.2 Equipment 2.3.3 Finishing 2.4.1 Medium-Voltage Cables
4、2.4 CABLES 2.4.1.1 General 2.4.1.2 Ratings 2.4.1.3 Conductor Material 2.4.1.4 Insulation 2.4.1.5 Shielding 2.4.1.6 Neutrals SECTION 16375 Page 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-6 3515789 OB98138 274 E CEGS 2.4.1.7 Jackets 2.4.2.1 Cond
5、uctor Material 2.4.2.2 Insulation 2.4.2.3 Jackets 2.4.2.4 Direct Buried 2.4.2.5 In Duct 2.4.2 Low-Voltage Cables 2.5 CABLE JOINTS, TERMINATIONS, AND CONNECTORS 2.5.1 Medium-Voltage Cable Joints 2.5.2 Medium-Voltage Separable Insulated Connectors 2.5.3 Low-Voltage Cable Splices 2.5.4 Terminations 2.5
6、.4.1 Factory Preformed Type 2.5.4.2 Taped Terminations 2.6 CONDUIT AND DUCTS 2.6.1 Metallic Conduit 2.6.2 Nonmetallic Ducts 2.6.2.1 Bituminized Fiber Duct 2.6.2.2 Concrete Encased Ducts 2.6.2.3 Direct Burial 2.6.3 Conduit Sealing Compound 2.7 MANHOLES, HANDHOLES , AND PULLBOXES 2.8 POLES AND HARDWAR
7、E 2.9 TRANSFORMERS, SUBSTATIONS, AND SWITCHGEAR 2.9.1 Secondary Unit Substation 2.9.1.1 Incoming Section 2.9.1.2 Transformer Section 2.9.1.3 Integral Outgoing Section 2.9.1.4 Nonintegral (Cable Compartment) Outgoing Section 2.9.2 Pad-Mounted Transformers 2.9.2.1 High-Voltage Compartments 2.9.2.2 Loa
8、d-Break Switch 2.9.2.3 Transformer Tank Sections 2.9.2.4 Low-Voltage Cable Compartments 2.9.2.5 Accessories 2.9.3 Busways 2.9.4 Pad-Mounted, Metal-Enclosed, Switchgear 2.9.4.1 Ratings at 60 Hz shall be: 2.9.4.2 Operators, Devices, and Controls 2.9.4.3 Enclosures 2.9.5.1 Ratings 2.9.5.2 Enclosures 2.
9、9.5 Pad-Mounted Sectionalizers 2.9.6 Cable Terminating Cabinets 2.10 METERING AND PROTECTIVE DEVICES 2.10.1 Circuit Breakers, Low-Voltage 2.10.1.1 Low-Voltage Power Circuit Breakers 2.10.1.2 Molded-Case Circuit Breakers 2.10.2.1 Construction 2.10.2.2 Ratings 2.10.2.3 E-Rated, Current-Limiting Power
10、Fuses 2.10.2.4 C-Rated, Current-Limiting Power Fuses 2.10.3.1 Cartridge Fuses 2.10.3.2 Transformer Circuit Fuses 2.10.4.1 General 2.10.4.2 Current Transformers 2.10.2 Fuses, Medium-Voltage, Including Current-Limiting 2.10.3 Fuses, Low-Voltage, Including Current-Limiting 2.10.4 Instrument Transformer
11、s SECTION 16375 Page 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3535789 0898139 LOO M CEGS 2.10.4.3 Current Transformers for 2.10.4.4 Current Transformers for 2.10.4.5 Current Transformers for 2.10.4.6 Voltage Transformers ( Low-Vol tage ) 2.1
12、0.5 Watthour Meters 2.10.6 Protective Relaying 2.10.6.1 General 2.10.6.2 Construction 2.10.6.3 Ratings 2.11 SURGE ARRESTERS 2.12 GROUNDING AND BONDING 2.12.1 Driven Ground Rods 2.12.2 Grounding Conductors 2.13 CONCRETE AND REINFORCEMENT 2.14 PADLOCKS 2.15 CABLE FIREPROOFING SYSTEMS 2.15.1 Fireproof
13、Coating 2.15.2 Fireproofing Tape 2.15.3 Plastic Tape 2.16 LIQUID DIELECTRICS 2.17 FACTORY TESTS 2.18 FENCING Power Transformers Metal-Enclosed Switchgear Kwh and Demand Metering 2.19 COORDINATED POWER SYSTEM PROTECTION 2.19.1 Scope of Analyses 2.19.2 Determination of Facts 2.19.3 Single Line Diagram
14、 2.19.4 Fault Current Analysis 2.19.4.1 Method 2.19.4.2 Data 2.19.5 Coordination Study 2.19.6 Study Report FART 3 EXECUTION 3.1 GENERAL INSTALLATION REQUIREMENTS 3.1.1 Conformance to Codes 3.1.2 Verification of Dimensions 3.1.3 Disposal of Liquid Dielectrics 3.2.1 Cable Installation Plan and Procedu
15、re 3.2 CABLE AND BUSWAY INSTALLATION 3.2.1.1 Cable Inspection 3.2.1.2 Duct Cleaning 3.2.1.3 Duct Lubrication 3.2.1.4 Cable Installation 3.2.1.5 Cable Installation Plan 3.2.2 Duct Line 3.2.3 Direct-Burial 3.2.3.1 Trenching 3.2.3.2 Cable Burial 3.2.3.3 Other Requirements 3.2.3.4 Medium-Voltage Cable J
16、oints or Low-Voltage Cable Splices 3.2.3.5 Cable Markers 3.2.4 Insect and Rodent Damage 3.2.5 Electric Manholes 3.2.6 Busway Installation 3.3 CABLE JOINTS 3.4 FIREPROOFING 3.4.1 Tape Method SECTION 16375 Page 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
17、 IHS-,-,-CEGS 3.4.2 Sprayable Method 3.5.1 Requirements 3.5.2 Treatment 3.5.3 Concrete Encasement 3.5.4 Nonencased Direct-Burial 3.5.5 Installation of Couplings 3.5 DUCT LINES 3.5.5.1 Bituminized-Fiber Ducts 3.5.5.2 Plastic Duct 3.5.6 Duct Line Markers 3.6.1 General 3.6.2 Electric Manholes 3.6.3 Com
18、munications Manholes 3.6.4 Handholes 3.6.5 Pullboxes 3.6.6 Ground Rods 3.7.1 Concrete Pads 3.6 MANHOLES, HANDHOLES, AND PULLBOXES 3.7 PAD-MOUNTED EQUIPMENT INSTALLATION 3.7.1.1 Construction 3.7.1.2 Concrete and Reinforcement 3.7.1.3 Sealing 3.7.2 Padlocks 3.7.3 Fencing 3.8 CONNECTIONS BETWEEN AERIAL
19、 AND UNDERGROUND SYSTEMS 3.8.1 Pole Installation 3.9 CONNECTIONS TO BUILDINGS 3.1 O GROUNDING 3.10.1 Grounding Electrodes 3.10.2 Grounding and Bonding Connections 3.10.3 Grounding and Bonding Conductors 3.10.4 Surge Arrester Grounding 3.10.5 Manhole, Handhole, or Concrete Pullbox Grounding 3.10.6 Me
20、tal Splice Case Grounding 3.10.7 Riser Pole Grounding 3.11 FIELD TESTING 3.11.1 General 3.11.2 Safety 3.11.3 Ground-Resistance Tests 3.11.4 Ground-Mat Connection Inspection 3.11.5 Medium-Voltage Cable Test 3.11.6 Low-Voltage Cable Test 3.11.7 Liquid-Filled Transformer Tests 3.11.8 Dry-Type Transform
21、er Tests 3.11.9 Circuit Breaker Tests 3.11.10 Power Circuit Breaker Tests 3.11.11 Protective Relays 3.11.12 Pre-Energization Services 3.11.13 Operating Tests 3.12 MANUFACTURERS FIELD SERVICE 3.12.1 Onsite Training 3.12.2 Installation Engineer 3.13 ACCEPTANCE - End of Section Table of Contents - SECT
22、ION 16375 Page 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W 3535789 08981111 869 6 CEGS DEPARTMENT OF THE ARMY CEGS-16375 (November 1992) U.S. ARMY CORPS OF ENGINEERS Superseding CEGS-16375 (December 1989) GUIDE SPECIFICATION FOR CONSTRUCTION
23、Includes changes through Notice 8 (May 1999) Includes Special Change (Tailoring Options) (June 1998) Includes Text Adjustment Change (October 1999) Latest change indicated by CHG tags SECTION 16375 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND 11/92 NOTE: This guide specification covers the requiremen
24、ts for underground electrical distribution systems. This guide specification is to be used in the preparation of project specifications in accordance with ER 1110-1-8155. Comments and suggestions on this guide specification are welcome and should be directed to the proponent of the specification. A
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COECEGS163751999ELECTRICALDISTRIBUTIONSYSTEMUNDERGROUNDNOTICE181999INCORPORATED 地下 配电 系统 合并 通知 181999

链接地址:http://www.mydoc123.com/p-620636.html