COE CEAGS 02586A-1990 REMOVAL OF PAVEMENT MARKINGS NOTICE 1 (1992) INCORPORATED METRIC CHANGE (1993) INCORPORATED《路面标线的清除 合并通知1-8(1996) 合并公制变更(1993)》.pdf
《COE CEAGS 02586A-1990 REMOVAL OF PAVEMENT MARKINGS NOTICE 1 (1992) INCORPORATED METRIC CHANGE (1993) INCORPORATED《路面标线的清除 合并通知1-8(1996) 合并公制变更(1993)》.pdf》由会员分享,可在线阅读,更多相关《COE CEAGS 02586A-1990 REMOVAL OF PAVEMENT MARKINGS NOTICE 1 (1992) INCORPORATED METRIC CHANGE (1993) INCORPORATED《路面标线的清除 合并通知1-8(1996) 合并公制变更(1993)》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、- I 3515789 0353945 T37 . CEAGS-02586A (November 1990) DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS ABRIDGED GUIDE SPECIFICATION FOR MILITARY CONSTRUCTION Includes metric Special chan e (September 1993) Includes changes through Nozice 1 (May 1992) Latest Notice change indicated by shall %e su
2、bmitted in accordance with Section 01300 I* Statement that personnel are qualified for equipment operation and handling of chemicals.& 1.3 MAINTENANCE OF TRAFFIC 1.3.1 Airfield The coo&nated with the Contracting Officer and with the. Fli ht Operations Officer. before and during work in the controlle
3、d zones of the airfield. control tower shall be advised when the work is com leted. A radio for this purpose will be provided by the Government. ?shall be provided by erformanqe of work in the controlled zones of airfields shall be Verbal communications shall be maintained with z he control tower Th
4、e Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- =- - - m 3535789 0353946 973 m the Contractor and approved by the Contracting officer. 1.3.2 Roads, Streets and Parking Areas When traffic must be rerouted or controlled to accompJish the work, the n
5、ecessary warnp signs flagpersons and related equipment for the safe passage of vehic?es chail be provideh. Equipment shall be mounted on rubber tires and shall be capable of removing markin s from the pavement without damaging the pavement surface or oint 1.4 EQUIPMENT sealan !i! . 1.4.1 Waterblasti
6、ng Equipment Waterblasting equipment shall be capable of producing an adjustable, pressurized stream of water. 1.4.2 Shotblasting Equipment Shotblasting equipment shall be ca able of producing an adjustable de th of operation, and shall be capable of recycling the abrasive for reuse. Sandblasting eq
7、uipment shall include an air compressoy, hoses, and nozzles. The compressor shall be equipped with traps to maintain the air free of oil and water. Chemical equipment shall be capable of application and yemoyal of chemicals from the pavement surface, and shall leave only non-toxic biodegradable resi
8、due. Pavement surface shall be free of snow, ice or slush. Surface temperature shaJl be at least 5,degrees C (40 degSees FI and rising at the beginning of o erations except those involvin Operation shal!? cease during thunderstorms. 8peratioq shall cease zuring rainfall except for waterblasting and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COECEAGS02586A1990REMOVALOFPAVEMENTMARKINGSNOTICE11992INCORPORATEDMETRICCHANGE1993INCORPORATED 路面 标线

链接地址:http://www.mydoc123.com/p-620625.html