1、BRITISH STANDARD BS ISO 3977-8:2002 Gas turbines Procurement Part 8: Inspection, testing, installation and commissioning ICS 27.040 BS ISO 3977-8:2002 This British Standard, having been prepared under the direction of the Engineering Sector Policy and Strategy Committee, was published under the auth
2、ority of the Standards Policy and Strategy Committee on 25 September 2002 BSI 25 September 2002 ISBN 0 580 40411 0 National foreword This British Standard reproduces verbatim ISO 3977-8:2002 and implements it as the UK national standard. The UK participation in its preparation was entrusted to Techn
3、ical Committee MCE/16, Gas turbines, which has the responsibility to: A list of organizations represented on this committee can be obtained on request to its secretary. Cross-references The British Standards which implement international publications referred to in this document may be found in the
4、BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible fo
5、r its correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK int
6、erests informed; monitor related international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside front cover, the ISO title page, pages ii to iv, pages 1 to 12, an inside back cover and a back cover. The BSI copyright date disp
7、layed in this document indicates when the document was last issued. Amendments issued since publication Amd. No. Date Comments Reference number ISO 3977-8:2002(E)INTERNATIONAL STANDARD ISO 3977-8 First edition 2002-07-01 Gas turbines Procurement Part 8: Inspection, testing, installation and commissi
8、oning Turbines gaz Spcifications pour lacquisition Partie 8: Contrle, essais, installation et mise en service BSISO39778:2002BSISO39778:2002iiIS-7793 O8:(2002)E I SO 2002 All irthgs ersedevr iiiContents Page Foreword.iv 1 Scope 1 2 Normative references1 3 Terms and definitions .2 4 General principle
9、s .2 5 Inspection.3 5.1 General3 5.2 Material inspection 3 5.3 Mechanical inspection 4 6 Testing 4 6.1 General4 6.2 Hydrostatic test4 6.3 Functional/operating tests5 6.4 Optional tests.10 7 Preparation for storage and shipment 10 7.1 General10 7.2 Preparation.11 8 Installation and commissioning.11 B
10、SISO39778:2002iiiIS-7793 O8:(2002)E vi I SO 2002 All irthgs ersedevr Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technic
11、al committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely wi
12、th the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 3. The main task of technical committees is to prepare International Standards. Draft Inte
13、rnational Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this part of ISO
14、 3977 may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 3977-8 was prepared by Technical Committee ISO/TC 192, Gas turbines. ISO 3977 consists of the following parts, under the general title Gas turbines Procurement: Part 1: Gen
15、eral and definitions Part 2: Standard reference conditions and ratings Part 3: Design requirements Part 4: Fuels and environment Part 5: Applications for petroleum and natural gas industries Part 7: Technical information Part 8: Inspection, testing, installation and commissioning Part 9: Reliability
16、, availability, maintainability and safety BSISO39778:2002ivINTENRATIONAL TSANDADR IS-7793 O8:(2002)EI SO 2002 All irthgs ersedevr 1Gas turbines Procurement Part 8: Inspection, testing, installation and commissioning 1 Scope This part of ISO 3977 states the principles for systems and procedures to a
17、ssure the integrity of a packagers product and services. It gives guidance on the inspection, testing, installation and commissioning required for the package and packaged equipment. It outlines the responsibilities between the purchaser and packager for inspection, coordination, reporting and recor
18、ding. 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this part of ISO 3977. For dated references, subsequent amendments to, or revisions of, any of these publications do not apply. However, parties to agreem
19、ents based on this part of ISO 3977 are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies. Members of ISO and IEC maintain registers of cu
20、rrently valid International Standards. ISO 2314:1989, Gas turbines Acceptance tests ISO 3977-1:1997, Gas turbines Procurement Part 1: General introduction and definitions ISO 3997-2:1997, Gas turbines Procurement Part 2: Standard reference conditions and ratings ISO 3977-3:2002, Gas turbines Procure
21、ment Part 3: Design requirements ISO 3997-4:2002, Gas turbines Procurement Part 4: Fuels and environment ISO 4406:1999, Hydraulic fluid power Fluids Method for coding the level of contamination by solid particles ISO 6190:1988, Acoustics Measurement of sound pressure levels of gas turbine installati
22、ons for evaluating environmental noise Survey method ISO 10442: 1), Petroleum, chemical and gas service industries Packaged, integrally geared centrifugal air compressors for general refinery service ISO 11042-1:1996, Gas turbines Exhaust gas emission Part 1: Measurement and evaluation ISO 11086:199
23、6, Gas turbines Vocabulary 1) To be published. BSISO39778:20021ISO 3977-8:2002(E) 2 I SO 2002 All irthgs ersedevr ISO 13709: 1) , Centrifugal pumps for petroleum, petrochemical, and natural gas industries ISO 13691:2001, Petroleum and natural gas industries High-speed special-purpose gear units IEC
24、60034-1:1983, Rotating electrical machines Part 1: Rating and performance IEC 60034-4:1985; Rotating electrical machines Part 4: Methods for determining synchronous machine quantities from tests 3 Terms and definitions For the purposes of this part of ISO 3977, the terms and definitions given in ISO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO397782002GASTURBINESPROCUREMENTINSPECTIONTESTINGINSTALLATIONANDCOMMISSIONING 燃气轮机 采购 检验 测试 安装 交付

链接地址:http://www.mydoc123.com/p-587212.html