《BS EN 62337-2012 Commissioning of electrical instrumentation and control systems in the process industry Specific phases and milestones《加工工业中电子设备、测量仪表和控制系统的交付使用 具体阶段和时间表》.pdf》由会员分享,可在线阅读,更多相关《BS EN 62337-2012 Commissioning of electrical instrumentation and control systems in the process industry Specific phases and milestones《加工工业中电子设备、测量仪表和控制系统的交付使用 具体阶段和时间表》.pdf(40页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationCommissioning of electrical,instrumentation and control systems in the process industry Specific phases and milestonesBS EN 62337:2012Incorporating corrigendum December 2012BS EN
2、 62337:2012National forewordThis British Standard is the UK implementation of EN 62337:2012. It is identical to IEC 62337:2012, incorporating corrigendum December 2012. It supersedes BS EN 62337:2007 which is withdrawn.The start and finish of text introduced or altered by corrigendum is indicated in
3、 the text by tags. Text altered by IEC corrigendum December 2012 is indicated in the text by .The UK participation in its preparation was entrusted to Technical Committee AMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this
4、 committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2013.Published by BSI Standards Limited 2013ISBN 978 0 580 81737 3ICS 2
5、5.040.01Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 May 2012.Amendments/corrigenda issued since publicationDate Text affected30 June 2013 Implementation o
6、f IEC corrigendum December 2012BRITISH STANDARDEUROPEAN STANDARD EN 62337 NORME EUROPENNE EUROPISCHE NORM April 2012 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Ave
7、nue Marnix 17, B - 1000 Brussels 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62337:2012 E ICS 25.040.40; 91.010; 91.040 Supersedes EN 62337:2007English version Commissioning of electrical, instrumentation and control syst
8、ems in the process industry - Specific phases and milestones (IEC 62337:2012) Mise en service des systmes lectriques, de mesure et de commande dans lindustrie de transformation - Phases et jalons specifiques (CEI 62337:2012) Inbetriebnahme elektrischer und leittechnischer Systeme in der verfahrenste
9、chnischen Industrie - Phasen und Meilensteine (IEC 62337:2012) This European Standard was approved by CENELEC on 2012-03-28. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standar
10、d without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in
11、any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croati
12、a, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. Foreword The t
13、ext of document 65E/221/FDIS, future edition 2 of IEC 62337, prepared by SC 65E, “Devices and integration in enterprise systems“, of IEC TC 65, “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 62337:2012. The follow
14、ing dates are fixed: latest date by which the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2012-12-28 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2015-03-28 This docu
15、ment supersedes EN 62337:2007. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standa
16、rd IEC 62337:2012 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 61331 series NOTE Harmonized in EN 61331 series. IEC 61355-1 NOTE Harmonized as EN 61355-1. 2 BS
17、 EN 62337:2012 62337 IEC:2012Annex ZA (normative) Normative references to international publications with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated reference
18、s, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Publication Year Title EN/HD
19、Year IEC 62079 - Preparation of instructions - Structuring, content and presentation EN 62079 - IEC 62424 - Representation of process control engineering - Requests in P b) the equipment is installed and mechanically functions in accordance with the general design requirements; c) applicable codes,
20、as listed in the general design requirements, are followed for materials and workmanship. Items such as painting, thermal insulation and final clean-up which would not affect the operation or safety of the plant could be excluded. All these items shall be listed and 10 BS EN 62337:2012 62337 IEC:201
21、2completed after precommissioning or commissioning within a mutually agreed schedule between the contractor and the owner but before the acceptance of the plant. 5.2 Procedure The following shall apply: a) The contractor shall prepare and maintain on-site test reports and records which shall include
22、 the following information: description of the type of test or check; date and time of test or check; identification of equipment and facilities; test pressure if applicable, test data and results, including remarks, if any; signature of the owners personnel witnessing the data recorded, if required
23、. b) Check, test and records thereof shall be carried out by the contractors personnel. Wherever the owners witness or attesting for the check or test is required, the owners personnel shall attend such check and test. For this purpose, the contractor shall keep the owner informed of the day-to-day
24、test-plan schedule. The test-plan schedule should be constantly revised to reflect the actual progress of the work and test. c) Any items found incomplete or requiring repair or adjustment shall be marked as such on a separate punch list and reported by the contractor to the owners and the contracto
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN623372012COMMISSIONINGOFELECTRICALINSTRUMENTATIONANDCONTROLSYSTEMSINTHEPROCESSINDUSTRYSPECIFICPHASESANDMILESTONES

链接地址:http://www.mydoc123.com/p-578386.html