BS EN 13742-2-2004 Irrigation techniques - Solid set sprinkler systems - Test methods《灌溉技术 固定式喷灌系统 试验方法》.pdf
《BS EN 13742-2-2004 Irrigation techniques - Solid set sprinkler systems - Test methods《灌溉技术 固定式喷灌系统 试验方法》.pdf》由会员分享,可在线阅读,更多相关《BS EN 13742-2-2004 Irrigation techniques - Solid set sprinkler systems - Test methods《灌溉技术 固定式喷灌系统 试验方法》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS EN 13742-2:2004 Irrigation techniques Solid set sprinkler systems Part 2: Test methods The European Standard EN 13742-2:2004 has the status of a British Standard ICS 65.060.35 BS EN 13742-2:2004 This British Standard was published under the authority of the Standards Policy and S
2、trategy Committee on 19 November 2004 BSI 19 November 2004 ISBN 0 580 44789 8 National foreword This British Standard is the official English language version of EN 13742-2:2004. The UK participation in its preparation was entrusted to Technical Committee AGE/30, Irrigation and drainage equipment, w
3、hich has the responsibility to: A list of organizations represented on this committee can be obtained on request to its secretary. Cross-references The British Standards which implement international or European publications referred to in this document may be found in the BSI Catalogue under the se
4、ction entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.
5、 Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor r
6、elated international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside front cover, the EN title page, pages 2 to 9 and a back cover. The BSI copyright notice displayed in this document indicates when the document was last issu
7、ed. Amendments issued since publication Amd. No. Date CommentsEUROPEANSTANDARD NORMEEUROPENNE EUROPISCHENORM EN137422 November2004 ICS65.060.35 Englishversion IrrigationtechniquesSolidsetsprinklersystemsPart2:Test methods TechniquesdirrigationInstallationsdecouverture intgraleparasperseursPartie2:Mt
8、hodesdessai BewsserungsverfahrenOrtsfestinstallierte BeregnungssystemeTeil2:Prfverfahren ThisEuropeanStandardwasapprovedbyCENon2September2004. CENmembersareboundtocomplywiththeCEN/CENELECInternalRegulationswhichstipulatetheconditionsforgivingthisEurope an Standardthestatusofanationalstandardwithouta
9、nyalteration.Uptodatelistsandbibliographicalreferencesconcernings uchnational standardsmaybeobtainedonapplicationtotheCentralSecretariatortoanyCENmember. ThisEuropeanStandardexistsinthreeofficialversions(English,French,German).Aversioninanyotherlanguagemadebytra nslation undertheresponsibilityofaCEN
10、memberintoitsownlanguageandnotifiedtotheCentralSecretariathasthesamestatusast heofficial versions. CENmembersarethenationalstandardsbodiesofAustria,Belgium,Cyprus,CzechRepublic,Denmark,Estonia,Finland,France, Germany,Greece,Hungary,Iceland,Ireland,Italy,Latvia,Lithuania,Luxembourg,Malta,Netherlands,
11、Norway,Poland,Portugal, Slovakia, Slovenia,Spain,Sweden,SwitzerlandandUnitedKingdom. EUROPEANCOMMITTEEFORSTANDARDIZATION COMITEUROPENDENORMALISATION EUROPISCHESKOMITEEFRNORMUNG ManagementCentre:ruedeStassart,36B1050Brussels 2004CEN Allrightsofexploitationinanyformandbyanymeansreserved worldwideforCE
12、NnationalMembers. Ref.No.EN137422:2004:EEN 13742-2:2004 (E) 2 Contents Page Foreword3 1 Scope 4 2 Normative references 4 3 Terms and definitions .4 4 Inspection and testing before pressurization.4 5 Inspection and testing at start-up4 5.1 Recommendation.4 5.2 Preliminary pressurization of main-lines
13、 and sub-mains4 5.3 Visual inspection .5 5.4 Hydraulic measurements 5 5.5 Distribution uniformity measurements5 6 Presentation of test results 8 Bibliography 9 EN 13742-2:2004 (E) 3 Foreword This document (EN 13742-2:2004) has been prepared by Technical Committee CEN/TC 334 “Irrigation techniques”,
14、the secretariat of which is held by AENOR. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by May 2005, and conflicting national standards shall be withdrawn at the latest by May 2005. According to t
15、he CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxem
16、bourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. EN 13742-2:2004 (E) 4 1 Scope This document provides a document to check and test, the proper operation and performance of a solid set irrigation system installed according to rele
17、vant design documents specified in EN 13742-1. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any
18、amendments) applies ISO 7749-1:1995 Agricultural irrigation equipment - Rotating sprinklers - Part 1: Design and operational requirements. ISO 7749-2: 1990, Irrigation equipment - Rotating sprinklers - Part 2: Uniformity of distribution and test methods EN 13742-1:2004, Irrigation techniques - Solid
19、 set sprinkler systems - Part 1: Selection, design, planning and installation. 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 13742-1:2004 apply. 4 Inspection and testing before pressurization Inspect if all the installed material and its location on
20、 the site correspond to the detailed bill of materials and to the plans that have been supplied with the installation. 5 Inspection and testing at start-up 5.1 Recommendation Before pressurization, all pipes shall be flushed to wash out dirt that may have accumulated during network installation. 5.2
21、 Preliminary pressurization of main-lines and sub-mains Main-lines and sub-mains shall be pressurized at a pressure 1,5 times higher than operating pressure before filling the trenches. No leak or damage shall be visible. EN 13742-2:2004 (E) 5 5.3 Visual inspection Pressurize the system for normal o
22、peration according to design specification and check: a) Water tightness after start-up at the network nominal operating pressure specified by the design; b) for no leaks shall be between the various system components; c) sprinkler operation. Make sure that they all rotate; d) risers which shall be
23、vertical and stable; e) proper valve operation; f) that all material is installed following manufacturers instructions; 5.4 Hydraulic measurements After the visual check, measure the following: a) pressure at the system inlet; b) total flow. It shall correspond to project flow (more or less 5 %); c)
24、 pressure measurements at lateral sprinklers exposed to highest and lowest pressure. On a sub-unit, pressure measurements shall be made at the most pressurized and less pressurized sprinkler with an accuracy of more or less 5%. Pressure variation between those two sprinklers shall not exceed 20 % of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN1374222004IRRIGATIONTECHNIQUESSOLIDSETSPRINKLERSYSTEMSTESTMETHODS 灌溉 技术 固定 喷灌 系统 试验 方法 PDF

链接地址:http://www.mydoc123.com/p-571805.html