1、BS 7121-5:2006NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBRITISH STANDARDCode of practice for safe use of cranes Part 5: Tower cranesICS 53.020.20Publishing and copyright informationThe BSI copyright notice displayed in this document indicates when the document was last is
2、sued. BSI 2006ISBN 0 580 48129 8The following BSI references relate to the work on this standard:Committee reference MHE/3Draft for comment 05/30054437 DCPublication historyFirst published as BS 7121-5, July 1997First revision, April 2006Amendments issued since publicationAmd. no. Date Text affected
3、BS 7121-5:2006 BSI 2006 iBS 7121-5:2006ContentsForeword iii1 Scope 12 Normative references 13 Terms and definitions 14 Management of installation and lifting operations 55 Contract lift or crane hire 116 Planning of lifting operations when the crane is in use 137 Selection and duties of personnel 15
4、8 Minimum attributes of personnel 209 Selection of tower cranes 2710 Safety 3811 Siting of cranes 4512 Erecting, dismantling and alteration of height 5013 Tower crane climbing 5814 Procedures and precautions 7115 Operating conditions 7416 Slinging and handling of loads 7717 Maintenance 7918 Thorough
5、 examination 81AnnexesAnnex A (normative) Additional recommendations for the installation and use of self-erecting tower cranes 82Annex B (normative) Lifting of persons 83Annex C (normative) Training of crane operators and slingers 87Annex D (informative) Example of typical procedure for climbing fr
6、ame thorough examinations and checks 97Annex E (informative) Background to the BS 7121 series 99Bibliography 101List of figuresFigure 1 Contract options 12Figure 2 Flow of information between personnel involved in lifting operations 18Figure 3 Hand signals 22Figure 4 Types of tower 28Figure 5 Types
7、of jib 30Figure 6 Types of base 33Figure 7 Lorry mounted tower crane 37Figure 8 Typical external climbing sequence 59Figure 9 Typical internal climbing sequence 61Figure 10 Typical tie 63List of tablesTable 1 Minimum number of operators required for continuous single shift operation of tower cranes
8、45Table 2 Weight of materials 77Summary of pagesThis document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 102, an inside back cover and a back cover.BS 7121-5:2006ii BSI 2006 This page deliberately left blank BSI 2006 iiiBS 7121-5:2006ForewordPublishing informationThis
9、part of BS 7121 was published by BSI and came into effect on 28 April 2006. It was prepared by Subcommittee MHE/3/11, Crane safety and testing, under the authority of Technical Committee MHE/3, Cranes and derricks. A list of organizations represented on this committee can be obtained on request to i
10、ts secretary.SupersessionThis part of BS 7121 supersedes BS 7121-5:1997, which is withdrawn.Relationship with other publicationsThe Lifting Operations and Lifting Equipment Regulations (LOLER) 1 and the Provision and Use of Work Equipment Regulations (PUWER) 2 came into force on the 5 December 1998.
11、 Details of the Regulations, an Approved Code of Practice plus HSE guidance can be found in the HSE books Safe use of lifting equipment 3 and Safe use of work equipment 4.BS 7121-1 provides general recommendations for crane types not covered in an additional part of BS 7121. BS 7121-2 covers in-serv
12、ice inspection, thorough examination and, where appropriate, testing for the safe use of all types of crane. Subsequent parts of BS 7121 deal with the specific crane types as follows: Part 3: Mobile cranes; Part 4: Lorry loaders; Part 5: Tower cranes; Part 6: Derrick cranes; Part 7: Overhead/under-h
13、ung travelling and goliath cranes; Part 8: High pedestal and portal jib dockside cranes; Part 9: Container handling cranes; Part 10: Rail mounted cranes; Part 11: Offshore cranes; Part 12: Recovery vehicles and equipment; Part 13: Hydraulic gantry lifting systems; Part 14: Side boom pipelayers.When
14、all parts of BS 7121 have been published, CP 3010 will be withdrawn and BS 5744 will be revised to cover manually operated and light cranes only.Information on the background to the development and use of BS 7121 since the initial publication of BS 7121-1 in 1989 is given in Annex E.The BS 7121 seri
15、es has been accepted as representing the consensus of practical experience for safety on cranes.BS 7121-5:2006iv BSI 2006Information about this documentThis new edition represents a full revision of the standard. It is intended to be used in conjunction with other parts of BS 7121 to ensure, so far
16、as is reasonably practicable, that lifting operations are carried out safely.The Health and Safety Executive (HSE) commends the use of this British Standard to those who have duties under the Health and Safety at Work etc. Act 1974 5. This standard was drawn up with the participation of HSE represen
17、tatives and will be referred to in relevant HSE publications.Use of this documentAs a code of practice, this British Standard takes the form of guidance and recommendations. It should not be quoted as if it were a specification and particular care should be taken to ensure that claims of compliance
18、are not misleading.Any user claiming compliance with this British Standard is expected to be able to justify any course of action that deviates from its recommendations.It has been assumed in the preparation of this British Standard that the execution of its provisions will be entrusted to appropria
19、tely qualified and experienced people, for whose use it has been produced.Presentational conventionsThe provisions in this standard are presented in roman (i.e. upright) type. Its recommendations are expressed in sentences in which the principal auxiliary verb is “should”.Commentary, explanation and
20、 general informative material is presented in smaller italic type, and does not constitute a normative element.Contractual and legal considerationsThis publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance wit
21、h a British Standard cannot confer immunity from legal obligations. BSI 2006 1BS 7121-5:20061 ScopeThis part of BS 7121 gives recommendations for the safe installation and use of tower cranes, including self-erecting tower cranes.Subjects covered include selection of tower cranes, planning the insta
22、llation (including site specific design work, e.g. base and ties), erection, extension (including climbing), thorough examination (including testing), maintenance, operation, and dismantling, as well as safety measures to be taken during the execution of all the above functions. It also covers the a
23、ppropriate selection and training of personnel involved in the safe installation and use of tower cranes.NOTE Self-erecting tower cranes have been addressed briefly in this document. It is envisaged that a full treatment will be given in a future publication.2 Normative referencesThe following refer
24、enced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.BS 7121 (all parts), Code of practice for the safe use of cranesBS 76
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS712152006CODEOFPRACTICEFORSAFEUSEOFCRANESTOWERCRANES 起重机 安全 使用 实施 规则 塔式起重机 PDF

链接地址:http://www.mydoc123.com/p-546577.html