BS 5970-2012 Thermal insulation of pipework ductwork associated equipment and other industrial installations in the temperature range of -100C to +870C Code of practice《温度范围从- 100℃.pdf
《BS 5970-2012 Thermal insulation of pipework ductwork associated equipment and other industrial installations in the temperature range of -100C to +870C Code of practice《温度范围从- 100℃.pdf》由会员分享,可在线阅读,更多相关《BS 5970-2012 Thermal insulation of pipework ductwork associated equipment and other industrial installations in the temperature range of -100C to +870C Code of practice《温度范围从- 100℃.pdf(160页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS 5970:2012Thermal insulation ofpipework, ductwork,associated equipment andother industrial installationsin the temperature range of100 C to +870 C Code ofpracticePublishing and
2、 copyright informationThe BSI copyright notice displayed in this document indicates when the documentwas last issued. The British Standards Institution 2012Published by BSI Standards Limited 2012ISBN 978 0 580 56662 2ICS 23.040.01; 27.220; 91.100.60The following BSI references relate to the work on
3、this standard:Committee reference B/540/7Draft for comment 12/30147224 DCPublication historyFirst published May 1981Second edition April 1992Third edition December 2001Fourth (current) edition, September 2012Amendments issued since publicationDate Text affectedBS 5970:2012 BRITISH STANDARDContentsFo
4、reword ivSection 1: General 11 Scope 12 Normative references 13 Terms and definitions 3Section 2: Design and materials 54 Design considerations 55 Exchange of design data 116 Factors affecting planning and programming 137 Typical characteristics of insulating materials and insulation systems 148 Cor
5、rosion 279 Selection of thermal insulating materials 3310 Selection of securing materials 3911 Selection of vapour barriers 5312 Selection of finishing materials, including ultimate treatment of finish 6213 Selection of thermal insulation systems 67Section 3: Site considerations 7114 Basis and metho
6、d of presenting schedule of work for agreement betweenpurchaser and contractor 7115 Packaging and transport to site 7216 Labour and supervision 7217 Provision of storage space, protection and safety during storage 7318 Provision of power, water, light, heat and accommodation forpersonnel 7319 Provis
7、ion of access equipment 7420 Responsibility for studs, cleats, etc. 7421 Observance of site safety and security regulations 7422 Protection of adjacent equipment and surfaces 7423 Clearing waste material from site 7424 Health considerations 75Section 4: Application methods 7625 Methods of applicatio
8、n and practical consideration 7626 Surface preparation and accessories 7627 Securements 7728 Cold insulation Application for systems operating in the temperaturerange 100 C to ambient temperature 8729 Hot insulation Application for systems operating in the temperaturerange above ambient to +870 C 10
9、230 Indoor finishes and their methods of application 12531 Weather-resistant finishes 13232 Ultimate treatment of finish painting 13433 Inspection and testing of the insulated system materials before and duringinstallation 135Section 5: Post-installation inspection and maintenance 13634 Maintenance
10、13635 Guarantees 138AnnexesAnnex A (informative) Adhesives 139Annex B (informative) Water vapour pressure and the relation to water vapourbarriers 143Annex C (informative) Water vapour diffusion resistance ratio ( value) 145Annex D (informative) Examples of termination methods 146Bibliography 148BRI
11、TISH STANDARD BS 5970:2012 The British Standards Institution 2012 iList of figuresFigure1Typical method of staggering insulation sections on a straight pipe(applies where pipe sections are applied in half sections) 6Figure 2 Ship-lapped layers of insulation 7Figure3Typical contraction/expansion join
12、ts for insulated pipework (for use at5 C or colder) 36Figure 4 Linear thermal movement of various materials between temperaturesof 20 C and 100 C 43Figure5Typical compression/support joint (for use at 5 C or above) 44Figure6Typical cladding and/or insulation support for vertical pipework Spacing of
13、joints (hot insulation) 45Figure7Typical methods of insulating horizontal vessels 46Figure8Typical cladding and/or insulation support for vertical pipework Support arrangements (hot insulation) 47Figure9Typical insulation supports for vessels 48Figure 10 Typical methods of insulating vertical vessel
14、s 51Figure 11 Method of supporting cladding 52Figure 12 Preferred option Hanger incorporating load-bearing insulation (forpipes operating above or below ambient temperature) 58Figure 13 Non-preferred option Hanger in direct contact with pipe (not forpipes operating below ambient temperature) 59Figur
15、e 14 Typical roller support incorporating load-bearing insulation 60Figure 15 Typical support for circular ducting incorporating load-bearinginsulation (operating above or below ambient temperature) 61Figure 16 Banding 79Figure 17 Typical support for rectangular ducting incorporating load-bearingins
16、ulation (operating above or below ambient temperature) 83Figure 18 Typical proprietary support inserts 84Figure 19 Typical method for insulating vessels with conical bottoms 85Figure 20 Typical arrangement showing termination of insulation adjacent tothe tank bottom with the bottom left uninsulated
17、for ease of inspection 86Figure 21 Typical method of insulating a valve where metal cladding is notrequired 88Figure 22 Typical method of insulating branches of vessel for cold workshowing layered junction 89Figure 23 Pre-fabricated valve box in single-layer insulation system 93Figure 24 Valve box,
18、dual layer cold pipework using rigid insulation withnon-metallic coating 94Figure 25 Pre-fabricated flange box in single-layer insulation system 95Figure 26 Typical method of insulating manhole (cold work) 96Figure 27 Typical method indicating the extent of insulation on vessel skirt 98Figure 28 Typ
19、ical method of insulating high temperature expansionbellows 104Figure 29 Typical method of insulating cold temperature expansionbellows 104Figure 30 Typical method of insulating flexible pipe 106Figure 31 Typical method of insulating steam traced pipe 109Figure 32 Typical method of insulating electr
20、ically traced pipe 110Figure 33 Typical arrangement showing termination of insulation adjacent tothe tank roof 115Figure 34 Insulated support plate for metal cladding 150 mm square 120Figure 35 Typical joints in sheet metal 121Figure 36 Typical expansion joint between hot vessel and self-setting cem
21、entcovering 127Figure D.1 Termination method, hot pipework using rigid insulation 146Figure D.2 Termination method, dual-layer cold pipework using rigidinsulation 147BRITISH STANDARDBS 5970:2012ii The British Standards Institution 2012List of tablesTable1Typical insulating materials for use at tempe
22、ratures higher thanambient 16Table2Typical insulating materials for use at temperatures higher thanambient with no product standard 18Table3Typical insulating materials for use at temperatures below ambient 20Table4Typical insulating materials for use at temperatures below ambientwith no product sta
23、ndard 21Table 5 Insulation bonding adhesives for pre-formed sections and slabs 40Table6Typical values for water vapour permeance 55Table7Water vapour permeance conversion 56Table 8 Expansion gaps 103Table 9 Thickness of metal cladding 122Table 10 Compatibility between screws/rivets and cladding mate
24、rial 128Table C.1 Water vapour diffusion resistance ratio ( value) 145Summary of pagesThis document comprises a front cover, an inside front cover, pages i to vi,pages 1 to 150, an inside back cover and a back cover.BRITISH STANDARD BS 5970:2012 The British Standards Institution 2012 iiiForewordPubl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS59702012THERMALINSULATIONOFPIPEWORKDUCTWORKASSOCIATEDEQUIPMENTANDOTHERINDUSTRIALINSTALLATIONSINTHETEMPERATURERANGEOF100CTO870CCODEOFPRACTICE

链接地址:http://www.mydoc123.com/p-545519.html