BS 1881-208-1996 Testing concrete - Recommendations for the determination of the initial surface absorption of concrete《混凝土试验 第208部分 混凝土初期表面吸水性推荐测定方法》.pdf
《BS 1881-208-1996 Testing concrete - Recommendations for the determination of the initial surface absorption of concrete《混凝土试验 第208部分 混凝土初期表面吸水性推荐测定方法》.pdf》由会员分享,可在线阅读,更多相关《BS 1881-208-1996 Testing concrete - Recommendations for the determination of the initial surface absorption of concrete《混凝土试验 第208部分 混凝土初期表面吸水性推荐测定方法》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS 1881-208: 1996 Testing concrete Part 208: Recommendations for the determination of the initial surface absorption of concrete ICS 91.100.30BS1881-208:1996 This British Standard, having been prepared under the directionof the Sector Board for Building and Civil Engineering, was pu
2、blished under the authorityof the Standards Board and comes into effect on 15 September 1996 BSI 12-1998 The following BSI references relate to the work on this standard: Committee reference B/517/1 Draft for comment 95/106828 DC ISBN 0 580 26201 4 Committees responsible for this British Standard Th
3、e preparation of this British Standard was entrusted by Technical Committee B/517, Concrete, to Subcommittee B/517/1, Concrete production and testing, upon which the following bodies were represented: Association of Lightweight Aggregate Manufacturers Association of Metropolitan Authorities British
4、Aggregate Construction Materials Industries British Cement Association British Civil Engineering Test Equipment Manufacturers Association British Precast Concrete Federation British Ready Mixed Concrete Association Building Employers Confederation Cement Admixtures Association Cementitious Slag Make
5、rs Association Concrete Society County Surveyors Society Department of the Environment (Building Research Establishment) Department of the Environment Department of Transport (Highways Agency) Electricity Association Federation of Civil Engineering Contractors Federation of Piling Specialists Instit
6、ute of Concrete Technology Institution of Civil Engineers Institution of Structural Engineers Institution of Water and Environmental Management National House-Building Council Quality Ash Association Sand and Grovel Association Society of Chemical Industry Amendments issued since publication Amd. No
7、. Date CommentsBS1881-208:1996 BSI 12-1998 i Contents Page Committees responsible Inside front cover Foreword ii 1 Scope 1 2 References 1 3 Definitions 1 4 Applications 1 5 Factors influencing the initial surface absorption of concrete 2 6 Apparatus 2 7 Calibration of apparatus 5 8 Procedure 5 9 Fac
8、tors affecting test results 7 10 Precision 7 11 Test report 7 Figure 1 Assembly of typical absorption apparatus 3 Figure 2 Typical cap suitable for clamping onto a smooth horizontal surface 4 Figure 3 Typical cap suitable for use on a vertical surface 4 Table 1 Determination of period of movement 6
9、Table 2 Correction factors to convert readings to an equivalent value at 20 C 7 List of references Inside back coverBS1881-208:1996 ii BSI 12-1998 Foreword This Part of BS1881 has been prepared by Subcommittee B/517/1. It supersedes clause6 of BS1881-5:1970 which has been deleted. All aspects of tes
10、ting concrete are included as Parts of BS1881 from sampling fresh concrete to assessing concrete in structures. BS1881-201:1986 Guide to the use of non-destructive methods of test for hardened concrete gives general guidance on the choice of non-destructive test methods and should be consulted for a
11、dvice on methods which complement the measurement of initial surface absorption or are useful as alternatives. In this Part of BS1881, recommendations for surface absorption differ from those in clause6 of BS1881-5:1970 in the omission of the requirement for a measurement at 2h after commencing the
12、test since this is no longer regarded as providing useful additional information in practice. Recommendations on applications, factors influencing results and interpretation is also provided. The method given in this standard provides a low pressure assessment of the water absorption of the concrete
13、 surface. Other tests currently under development involve higher pressures or surface drilling and the results from such tests will be governed by properties of the concrete not necessarily related to surface absorption. A British Standard does not purport to include all the necessary provisions of
14、a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pages i and ii, pages1 to 8, an inside ba
15、ck cover and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover.BS1881-208:1996 BSI 12-1998 1 1 Scope This Part of BS1881 gives recommendations for a method of determining
16、 the initial surface absorption of oven dried concrete, of concrete in the laboratory which cannot be oven dried and of site concrete. Recommendations are given on areas of application of this method and the interpretation of results. 2 References 2.1 Normative references This Part of BS1881 incorpo
17、rates, by dated or undated reference, provisions from other publications. These normative references are made at the appropriate places in the text and the cited publications are listed on the inside back cover. For dated references, only the edition cited applies; any subsequent amendments to or re
18、visions of the cited publication apply to this Part of BS1881 only when incorporated in the reference by amendment or revision. For undated references, the latest edition of the cited publication applies, together with any amendments. 2.2 Informative references This Part of BS 1881 refers to other p
19、ublications that provide information or guidance. Editions of these publications current at the time of issue of this standard are listed on the inside back cover, but reference should be made to the latest editions. 3 Definitions For the purposes of this Part of BS1881 the definitions in BS6100-6.2
20、 apply together with the following: 3.1 location region of concrete that is being assessed and that, for practical purposes, is assumed to be of uniform quality 3.2 initial surface absorption rate of flow of water into concrete per unit area at a stated interval from the start of the test and at a c
21、onstant applied head 3.3 surface zone zone of concrete immediately behind the surface NOTEThe thickness of the zone that influences the result of this test may range between a few millimetres and several centimetres depending on the nature and condition of the concrete. 4 Applications 4.1 General Th
22、is test method provides data for assessing the uniaxial water penetration characteristics of a concrete surface. The applied pressure of 200mm head of water is worse than the severest weather exposure in the UK due to driving rain. The results may be considered to be related to the quality of finish
23、 and to the durability of the surface under the effects of natural weathering. The results are of little relevance to behaviour under higher water pressures, and cannot be used to assess the permeability of a body of concrete. This test method can be applied to exposed aggregate or profiled surfaces
24、 provided that a watertight seal can be obtained with the apparatus. The test is not applicable to specimens or areas showing obvious porosity, honeycombing or cracking. Misleading results can be obtained when tests are performed on thin concrete sections through which water could penetrate during t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS18812081996TESTINGCONCRETERECOMMENDATIONSFORTHEDETERMINATIONOFTHEINITIALSURFACEABSORPTIONOFCONCRETE

链接地址:http://www.mydoc123.com/p-542972.html