ATIS 0300030-2011 Next Generation Interconnection Interoperability (NGIIF) Reference Document Part IX Installation Testing and Maintenance Responsibilities of Facilities.pdf
《ATIS 0300030-2011 Next Generation Interconnection Interoperability (NGIIF) Reference Document Part IX Installation Testing and Maintenance Responsibilities of Facilities.pdf》由会员分享,可在线阅读,更多相关《ATIS 0300030-2011 Next Generation Interconnection Interoperability (NGIIF) Reference Document Part IX Installation Testing and Maintenance Responsibilities of Facilities.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、 ATIS-0300030 Next Generation Interconnection Interoperability (NGIIF) Reference Document Part IX, Installation, Testing and Maintenance Responsibilities of Facilities Version 12.0 ATIS is the leading technical planning and standards development organization committed to the rapid development of glo
2、bal, market-driven standards for the information, entertainment and communications industry. More than 200 companies actively formulate standards in ATIS Committees, covering issues including: IPTV, Cloud Services, Energy Efficiency, IP-Based and Wireless Technologies, Quality of Service, Billing an
3、d Operational Support, Emergency Services, Architectural Platforms and Emerging Networks. In addition, numerous Incubators, Focus and Exploratory Groups address evolving industry priorities including Smart Grid, Machine-to-Machine, Connected Vehicle, IP Downloadable Security, Policy Management and N
4、etwork Optimization. ATIS is the North American Organizational Partner for the 3rd Generation Partnership Project (3GPP), a member and major U.S. contributor to the International Telecommunication Union (ITU) Radio and Telecommunications Sectors, and a member of the Inter-American Telecommunication
5、Commission (CITEL). ATIS is accredited by the American National Standards Institute (ANSI). For more information, please visit www.atis.org. Notice This document was developed by the Alliance for Telecommunications Industry Solutions (ATIS) sponsored Next Generation Interconnection Interoperability
6、Forum (NGIIF). The NGIIF addresses next-generation network interconnection and interoperability issues associated with emerging technologies. Specifically, it develops operational procedures which involve the network aspects of architecture, disaster preparedness, installation, maintenance, manageme
7、nt, reliability, routing, security, and testing between network operators. In addition, the NGIIF addresses issues which impact the interconnection of existing and next generation networks and facilitate the transition to emerging technologies. All changes to this document shall be made through the
8、NGIIF issue resolution process. Note Regarding Previous Versions The NIIF Reference Document was formerly known as the Network Operations Forum (NOF) Reference Document. The NOF Reference Document was published and maintained by Bellcore. The last version of the NOF Reference Document is Issue 13. D
9、isclaimer and Limitation of Liability The information provided in this document is directed solely to professionals who have the appropriate degree of experience to understand and interpret its contents in accordance with generally accepted engineering or other professional standards and applicable
10、regulations. No recommendation as to products or vendors is made or should be implied. NO REPRESENTATION OR WARRANTY IS MADE THAT THE INFORMATION IS TECHNICALLY ACCURATE OR SUFFICIENT OR CONFORMS TO ANY STATUTE, GOVERNMENTAL RULE OR REGULATION, AND FURTHER NO REPRESENTATION OR WARRANTY IS MADE OF ME
11、RCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR AGAINST INFRINGEMENT OF INTELLECTUAL PROPERTY RIGHTS. ATIS SHALL NOT BE LIABLE, BEYOND THE AMOUNT OF ANY SUM RECEIVED IN PAYMENT BY ATIS FOR THIS DOCUMENT, WITH RESPECT TO ANY CLAIM, AND IN NO EVENT SHALL ATIS BE LIABLE FOR LOST PROFITS OR OTHER
12、 INCIDENTAL OR CONSEQUENTIAL DAMAGES. ATIS EXPRESSLY ADVISES THAT ANY AND ALL USE OF OR RELIANCE UPON THE INFORMATION PROVIDED IN THIS DOCUMENT IS AT THE RISK OF THE USER. ATIS-0300024, NGIIF Reference Document, Part IX, Installation, Testing and Maintenance Responsibilities of Facilities, Formerly
13、NIIF 5026 The NGIIF Reference Document, Part IX, Installation, Testing and Maintenance Responsibilities of Facilities, is an ATIS standard developed by the NGIIF. Published by Alliance for Telecommunications Industry Solutions 1200 G Street, NW, Suite 500 Washington, DC 20005 Copyright 2011 by Allia
14、nce for Telecommunications Industry Solutions All rights reserved. 2 No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher. For information contact ATIS at 202.628.6380. ATIS is online at . Pri
15、nted in the United States of America. 3 INSTALLATION, TESTING, AND MAINTENANCE RESPONSIBILITIES FOR FACILITIES Table of Contents 1 GENERAL 5 2 RESPONSIBILITIES 5 2.1 ACCESS SERVICE CUSTOMER (ASC) 5 2.2 ACCESS SERVICE PROVIDER (ASP) 6 3 NETWORK SERVICE CENTER (NSC) 7 4 NETWORK MODIFICATION NOTIFICATI
16、ON . 7 5 FACILITIES INSTALLATION . 8 5.1 FACILITY ORDER ACTIVITY 8 5.2 ESTABLISHING INTERFACE . 8 5.3 PRE-SERVICE TESTING 8 5.4 COOPERATIVE ACCEPTANCE TESTING 8 5.5 DIGITAL ACCEPTANCE TESTING GUIDELINES . 9 5.6 ACCEPTANCE OF DS-1 9 5.6.1 Performance Limits, Using QRSS (From ANSI T1.510) 10 5.6.2 Per
17、formance, Using Pattern Sensitive Testing AMI and B8ZS MATRIX . 10 5.6.3 Long Term Performance Testing (From ANSI T1.510) . 11 5.6.4 Line Code Option Verification . 11 5.6.5 AMI/B8ZS Mismatch Testing . 11 5.7 ACCEPTANCE TESTING OF DS-3 SERVICE 11 5.7.1 Test limits and objectives for 44.736 Mbit/s se
18、rvice (T1-510-1999) 11 5.8 DS-3 TESTING - OPTICAL INTERFACE . 12 5.9 COMPLETIONS 12 5.10 FACILITY DISCONNECTS . 12 5.11 FACILITY REARRANGEMENTS . 12 5.12 COORDINATED CONVERSIONS 12 5.13 CHANGE ORDERS 13 6 FACILITIES MAINTENANCE . 13 6.1 ROUTINE MAINTENANCE 13 6.2 POTENTIAL SERVICE AFFECTING ACTIVITI
19、ES . 14 6.3 DEFERRED SERVICE RESTORATION 14 6.4 TROUBLE REPORTING . 14 6.5 TROUBLE CLEARANCE REPORTING . 15 6.6 SPECIALIZED TROUBLE HANDLING . 15 6.6.1 Inoperative and Impaired Facilities. 15 6.6.2 Chronic Facility Failures 16 6.6.3 Synchronization . 16 6.7 ESCALATION . 16 6.8 TROUBLE REPORT STATUS
20、. 16 6.9 SECTIONALIZATION AND REPAIR 17 6.10 MAINTENANCE OF DS-1 SERVICE . 17 6.10.1 AMI and B8ZS MATRIX . 18 6.11 CHRONIC TROUBLE OF DS-1 SERVICE 18 6.12 MAINTENANCE OF DS-1 SERVICE WITHIN A DS-3 SERVICE 19 6.13 MAINTENANCE TESTING OF DS-3 SERVICE 19 6.14 DS-3 TESTING - OPTICAL INTERFACE . 20 6.15
21、FACILITY RESTORATION PROCEDURES . 20 6.16 MAINTENANCE MAKE-BUSY PROCEDURE FOR FACILITIES . 20 4 6.16.1 Facility Make-Busy (Facility Failure) . 20 6.16.2 Maintenance Removal from Service . 20 6.16.3 Expedited Make-Busy Procedure for Facilities . 20 6.17 VERIFICATION TESTS 21 6.18 END TO END INTERCARR
22、IER TESTING . 21 7 ADDITIONAL BILLING . 21 7.1 BILLABLE OVERTIME INSTALLATION AND REPAIR . 22 7.2 ADDITIONAL COOPERATIVE ACCEPTANCE TESTING (ACAT) . 22 7.3 NON-SCHEDULED TESTING . 22 7.4 MAINTENANCE OF SERVICE CHARGE 22 7.5 STAND-BY TIME . 22 7.6 OTHER LABOR 22 8 FACILITIES PROVIDED BY MULTIPLE EXCH
23、ANGE CARRIERS 22 8.1 INSTALLATION 23 8.2 COMMON COMPLETION 23 8.3 JEOPARDY . 23 8.4 MAINTENANCE . 23 8.4.1 Trouble Report Exceptions. 25 8.4.2 Request for Test Assistance 25 8.4.3 Request for Escalation Assistance from ASC . 25 9 OPTIONAL DS-1 TEST PATTERNS . 26 9.1 BACKGROUND CCITT / ITU-T TEST SIG
24、NALS, OTHER TESTS, AND TEST SIGNALS . 26 9.1.1 215-1 32,757-bit PRBS note1test pattern (Inverted) note 2. 26 9.1.2 2201 1,048,575-bit PRBS test pattern note 226 9.1.3 223-1 8,388,607-bit PRBS test pattern (Inverted) note 2. 26 9.1.4 1-IN-16 (1:15) A single ONE bit followed by fifteen ZERO-bits. . 26
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ATIS03000302011NEXTGENERATIONINTERCONNECTIONINTEROPERABILITYNGIIFREFERENCEDOCUMENTPARTIXINSTALLATIONTESTINGANDMAINTENANCERESPONSIBILITIESOFFACILITIESPDF

链接地址:http://www.mydoc123.com/p-540942.html