ASTM F2949-2018 Standard Specification for Pole Vault Box Collars《撑杆跳高箱套圈标准规范》.pdf
《ASTM F2949-2018 Standard Specification for Pole Vault Box Collars《撑杆跳高箱套圈标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2949-2018 Standard Specification for Pole Vault Box Collars《撑杆跳高箱套圈标准规范》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2949 122F2949 18 An American National StandardStandard Specification forPole Vault Box Collars1This standard is issued under the fixed designation F2949; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of las
2、t revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1 NOTEEditorially added footnotes regarding patent rights in August 2013.2 NOTEEditorially corrected 9.1.3 in April 2014.1. Scope1.1
3、This specification covers minimum requirements of size, physical characteristics of materials, standard testing procedures,labeling and identification of pole vault box collars.21.2 UnitsThe values stated in SI units are to be regarded as the standard. The values given in parentheses are for informa
4、tiononly.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety safety, health, and healthenvironmental practices and determine theapplicability of regulatory limi
5、tations prior to use.1.4 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Principles for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Tec
6、hnical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:3F1292 Specification for Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment3. Terminology3.1 Definitions:3.1.1 box collar arms, nthe two parts of the pole vault box collar to the lef
7、t and right of the pole vault box. If the box collarhas box collar wings, the wings are part of the box collar arms.3.1.2 box collar body, nthe part of the pole vault box collar that pads the horizontal surfaces around the rim of the pole vaultbox and under the front buns.3.1.3 box collar cutout, nt
8、he opening in the pole vault box collar above the pole vault box.3.1.4 box collar wing, nthe part of the box collar arm that extends down the inner sidewall of the pole vault box. The boxcollar wings provide protection and help to hold the box collar in place.3.1.5 front buns, nthe parts of the pole
9、 vault landing system that pad the areas between the standard bases and around the polevault box.3.1.6 front opening, nthe opening at the front of the pole vault box nearest the approach runway.3.1.7 pole bend cavity, nthe rearmost portion of the pole vault box and box collar cutout in front of the
10、strike plate where thepole bends and rotates. The cavity is formed by the sidewalls and strike plate of the pole vault box, the rearmost part of the poleslide, and inside edges of the box collar cutout over the deepest part of the box where the pole slide meets the strike plate.1 This specification
11、is under the jurisdiction of ASTM Committee F08 on Sports Equipment, Playing Surfaces, and Facilities and is the direct responsibility ofSubcommittee F08.67 on Pole Vault.Current edition approved Sept. 1, 2012April 1, 2018. Published October 2012May 2018. Originally approved in 2012. Last previous e
12、dition approved in 2012 asF2949 122. DOI: 10.1520/F2949-12E02.10.1520/F2949-18.2 The users attention is called to the possibility that compliance with this standard may require use of an invention covered by patent rights.By publication of this standard, no position is taken with respect to the vali
13、dity of any such claim(s) or of any patent rights in connection therewith. If a patent holderhas filed a statement of willingness to grant a license under these rights on reasonable and nondiscriminatory terms and conditions to applicants desiring to obtain such alicense, then details may be obtaine
14、d from the standards developer.3 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM s
15、tandard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all c
16、ases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.8 pole slide, nthe floor of the pole vault box that slants downward from i
17、ts front boundary with the runway to its rearboundary with the back of the box. The tip of the vaulting pole slides on the pole slide to the strike plate.3.1.9 pole slide opening, nthe space between the ends of the box collar arms at the front of the pole vault box collar and abovethe intersection o
18、f the runway with the pole slide.3.1.10 pole vault box, nthe trough at the end of the pole vault runway. It has four sides: a downward sloping floor or pole slide,two sidewalls, and a strike plate.Avaulter directs the lower end of the vaulting pole into the pole vault box. The back wall of polevault
19、 box stops the forward motion of the end of the pole while allowing the pole to rotate about its end as the vaulter leaves theground and completes a vault.3.1.11 pole vault box collar, na device used to offer impact protection to pole vaulters in and around a pole vault box.3.1.12 sidewalls, nthe le
20、ft and right walls of the pole vault box.3.1.13 strike plate, nthe back wall of the pole vault box; the stopboard.4. Performance Requirements4.1 The average peak acceleration calculated from the last two of a series of three impact tests for each impact test location onthe pole vault box collar shal
21、l not exceed 200 g when impact tested in accordance with Section 9.4.2 The average HIC score calculated from the last two of a series of three impact tests for each impact test location on the polevault box collar shall not exceed 1150 when impact tested in accordance with Section 9.5. Dimensions5.1
22、 Minimum DimensionsA pole vault box collar shall be at least 122 cm (48 in.) wide and 146 cm (5712 in.) long. Thedistance from the rear edge of the box collar at its base to the rear edge of the box collar cutout shall be at least 38 cm (15 in.).At its uppermost surface, the box collar shall cover t
23、he upper edges of each sidewall of the box from the front of the box wherethe pole slide meets the runway to a point on the top edge of the sidewall no less than 20 cm (8 in.) forward of the top of the strikeplate. The box collar arms shall extend forward at least 108 cm (4212 in.) from the base of
24、the rear edge of the box collar cutout.(See Figs. 1 and 2.)4,55.2 Maximum ThicknessA pole vault box collar shall be no more than 10 cm (4 in.) thick.5.3 Maximum Dimensions of Box Collar CutoutAt the box collars uppermost surface in the vertical plane passing throughthe front edge of the pole slide,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF29492018STANDARDSPECIFICATIONFORPOLEVAULTBOXCOLLARS 撑杆跳高 箱套圈 标准规范 PDF

链接地址:http://www.mydoc123.com/p-539799.html