1、Designation: F1269 13 (Reapproved 2018)Standard Test Methods forDestructive Shear Testing of Ball Bonds1This standard is issued under the fixed designation F1269; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last rev
2、ision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 These test methods cover tests to determine the shearstrength of a series of ball bonds made by either thermosonicor thermal c
3、ompression techniques using either gold or copperwires.NOTE 1Common usage at the present time considers the term “ballbond to include the enlarged spheriodal or nailhead portion of the wire,(produced by the flameoff/spark EFO and first bonding operation in thethermosonic or thermal compression proce
4、ss), and the ball bond-bonding pad interfacial-attachment area or weld interface.1.2 These test methods cover ball bonds made with smalldiameter (from 18 to 76-m (0.0007 to 0.003-in.) gold orcopper wire of the type used in integrated circuits and hybridmicroelectronic assemblies, system on a chip, a
5、nd so forth.1.3 These test methods can be used only when the ballheight and diameter are large enough and adjacent interferingstructures are far enough away to allow suitable placement andclearance (above the bonding pad and between adjacent bonds)of the shear test ram.1.4 These test methods are des
6、tructive. They are appropriatefor use in process development or, with a proper sampling plan,for process control or quality assurance.1.5 The values stated in SI units are to be regarded as thestandard. The values given in parentheses are for informationonly.1.6 This standard does not purport to add
7、ress all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations prior to use.1.7 This international standard was deve
8、loped in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Doc
9、uments2.1 ASTM Standards:2F458 Practice for Nondestructive Pull Testing of Wire BondsF459 Test Methods for Measuring Pull Strength of Micro-electronic Wire Bonds2.2 NIST Documents:3NBS Handbook 105-1 Specification and Tolerances for Ref-erence Standards and Field Standards, Weights and Mea-suresIOLM
10、 Class M2-Circular 547-1 Precision Laboratory Stan-dards of Mass and Laboratory Weights2.3 Military Standard:4MIL-STD 883, Method 20103. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 ball lifta separation of the ball bond at the bondingpad interface with little or no residual (
11、less than 25 % of thebond deformation area) ball metallization remaining on thebonding pad (that remains essentially intact). In the case ofgold ball bonds on aluminum pad metallization, a ball lift isdefined as a separation of the ball bond at the bonding padinterface with little or no intermetalli
12、c formation either presentor remaining (area of intermetallic less than 25 % of the bonddeformation area).3.1.1.1 DiscussionIntermetallic refers to the aluminumgold alloy formed at the ball bond pad metallization interfacialarea where a gold ball bond is attached to an aluminum padmetallization. If
13、the wire/ball is of copper, then the aluminumintermetallic is normally much thinner and may not be opti-cally observable.3.1.2 ball shear (weld interface separation) an appre-ciable intermetallic (in the case of the aluminum-gold system)and ball metallization, or both, (in the case of the gold-to-go
14、ld1These test methods are under the jurisdiction of ASTM Committee F01 onElectronics and is the direct responsibility of Subcommittee F01.03 on MetallicMaterials, Wire Bonding, and Flip Chip.Current edition approved March 1, 2018. Published April 2018. Originallyapproved in 1989. Last previous editi
15、on approved in 2013 as F126913. DOI:10.1520/F1269-13R18.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Avai
16、lable from the National Technical Information Service, 5285 Port RoyalRd., Springfield, VA 22161.4Available from Standardization Documents Order Desk, Bldg. 4 Section D, 700Robbins Ave., Philadelphia, PA 19111-5094, Attn: NPODS.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West C
17、onshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade
18、 Organization Technical Barriers to Trade (TBT) Committee.1system) remains on the bonding pad (area of remaining metalor intermetallic greater than 25 % of the bond deformationarea).3.1.3 bonding pad lift (substrate metallization removal)aseparation between the bonding pad and the underlying sub-str
19、ate. The interface between the ball bond and the residual padmetallization attached to the ball remains intact.3.1.4 crateringbonding pad lifts taking a portion of theunderlying substrate material with it. Residual pad and sub-strate material are attached to the ball. The interface betweenthe ball a
20、nd this residual material remains intact.3.1.4.1 DiscussionIt should be noted that cratering can becaused by several factors including the ball bonding operation,the post-bonding processing, and even the act of shear testingitself. If cratering occurs, chemically etch off the ball bondsand bond pads
21、 of untested units and microscopically check forcratering. Cratering caused prior to the shear test operation isunacceptable.Various aspects of the failure mode definitions are illustratedin Fig. 1.4. Summary of Test Methods4.1 The microelectronic device with the ball bond (wirebond (see Practice F4
22、58 and Test Methods F459) to be testedis held firmly in an appropriate fixture. A shearing ram ispositioned parallel to the substrate and approximately 25 m (1mil) above the substrate metallization (except for the case offine pitch bond bonds and pads, where the ram height can belower, depending on
23、the pitch, final ball height,5and so forth.A typical shearing configuration is shown in Fig. 2. The ram isthen moved into the ball until the ball separates from thesubstrate. The force applied to the ram, in order to cause thefailure of the ball bond, is recorded. The mode of failure (forexample, ba
24、ll lift, weld-interface separation, cratering, etc.) isobserved and recorded.NOTE 2Bonds made with larger or smaller diameter wire may requirethat the ram be placed further above the substrate, or lower, but in all casesthe ram should be located below the balls horizontal centerline. Thedistance bel
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF126920132018STANDARDTESTMETHODSFORDESTRUCTIVESHEARTESTINGOFBALLBONDS 球焊 破坏性 剪切 试验 标准 方法 PDF

链接地址:http://www.mydoc123.com/p-534532.html