ASTM D4448-2001(2013) Standard Guide for Sampling Ground-Water Monitoring Wells《地下水位监测井采样标准指南》.pdf
《ASTM D4448-2001(2013) Standard Guide for Sampling Ground-Water Monitoring Wells《地下水位监测井采样标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D4448-2001(2013) Standard Guide for Sampling Ground-Water Monitoring Wells《地下水位监测井采样标准指南》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D4448 01 (Reapproved 2013)Standard Guide forSampling Ground-Water Monitoring Wells1This standard is issued under the fixed designation D4448; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers sampling equipment and proceduresand “in the field” preservation, and it does not include welllocation, depth, well
3、development, design and construction,screening, or analytical procedures that also have a significantbearing on sampling results.This guide is intended to assist aknowledgeable professional in the selection of equipment forobtaining representative samples from ground-water monitor-ing wells that are
4、 compatible with the formations beingsampled, the site hydrogeology, and the end use of the data.1.2 This guide is only intended to provide a review of manyof the most commonly used methods for collecting ground-water quality samples from monitoring wells and is notintended to serve as a ground-wate
5、r monitoring plan for anyspecific application. Because of the large and ever increasingnumber of options available, no single guide can be viewed ascomprehensive. The practitioner must make every effort toensure that the methods used, whether or not they are ad-dressed in this guide, are adequate to
6、 satisfy the monitoringobjectives at each site.1.3 The values stated in SI units are to be regarded asstandard. The values given in parentheses are provided forinformation only.1.4 This standard does not purport to address all of thesafety problems, if any, associated with its use. It is theresponsi
7、bility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D4750 Test Method for Determining Subsurface LiquidLevels in a Borehole or Monitoring Well (Obs
8、ervationWell) (Withdrawn 2010)3D5088 Practice for Decontamination of Field EquipmentUsed at Waste SitesD5792 Practice for Generation of Environmental Data Re-lated to Waste Management Activities: Development ofData Quality ObjectivesD5903 Guide for Planning and Preparing for a GroundwaterSampling Ev
9、entD6089 Guide for Documenting a Ground-Water SamplingEventD6452 Guide for Purging Methods for Wells Used forGroundwater Quality InvestigationsD6517 Guide for Field Preservation of GroundwaterSamples2.2 EPA Standards:EPA Method 9020AEPA Method 90223. Terminology3.1 Definitions:3.1.1 low-flow samplin
10、ga ground water sampling tech-nique where the purge and sampling rates do not result insignificant changes in formation seepage velocity.3.1.2 minimal purge samplingthe collection of groundwater that is representative of the formation by purging onlythe volume of water contained by the sampling equi
11、pment (thatis, tubing, pump bladder).3.1.2.1 DiscussionThis sampling method should be con-sidered in situations where very low yield is a considerationand results from this sampling method should be scrutinized toconfirm that they meet data quality objectives (DQOs) and thework plan objectives.3.1.3
12、 passive samplingthe collection of ground-waterquality data so as to induce no hydraulic stress on the aquifer.3.1.4 water quality indicator parametersrefer to fieldmonitoring parameters that include but are not limited to pH,specific conductance, dissolved oxygen, oxidation-reductionpotential, temp
13、erature, and turbidity that are used to monitorthe completeness of purging.1This guide is under the jurisdiction of ASTM Committee D34 on WasteManagement and is the direct responsibility of Subcommittee D34.01.02 onSampling Techniques.Current edition approved April 1, 2013. Published April 2013. Ori
14、ginallyapproved in 1985. Last previous edition approved in 2007 as D444801 (2007).DOI: 10.1520/D4448-01R13.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the stand
15、ards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenced onwww.astm.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States14. Summary of Guide4.1 The equipment and procedures used
16、 for sampling amonitoring well depend on many factors. These include, butare not limited to: the design and construction of the well, rateof ground-water flow, and the chemical species of interest.Sampling procedures may be different if analyses for traceorganics, volatiles, oxidizable species, or t
17、race metals areneeded. This guide considers all of these factors by discussingequipment and procedure options at each stage of the samplingsequence. For ease of organization, the sampling process canbe divided into three steps: well purging, sample withdrawal,and field preparation of samples. Certai
18、n sampling protocolseliminate the first step.4.2 The sampling must be well planned and all samplecontainers must be prepared prior to going to the field. Theseprocedures should be incorporated in the approved work planthat should accompany the sampling crew so that they mayrefer to it for guidance o
19、n sampling procedures and analytes tobe sampled (see Guide D5903).4.3 Monitoring wells must be either purged to removestagnant water in the well casing or steps must be taken toensure that only water meeting the DQOs and the work planobjectives is withdrawn during sampling (see Practice D5792).When
20、well purging is performed, it is accomplished by eitherremoving a predetermined number of well volumes or by theremoval of ground water until stable water quality parametershave been obtained. Ideally this purging is performed withminimal well drawdown and minimal mixing of the formationwater with t
21、he stagnant water above the screened interval in thecasing. Passive sampling and the minimal purge methods donot attempt to purge the water present in the monitoring wellprior to sampling (1).4The minimal purge method attempts topurge only the sampling equipment. Each of these methods isdiscussed in
22、 greater detail in Section 6.4.4 The types of chemical species that are to be sampled aswell as the reporting limits are prime factors for selectingsampling devices (2, 3). The sampling device and all materialsand devices the water contacts must be constructed of materialsthat will not introduce con
23、taminants or alter the analytes ofconcern in any way. Material compatibility is further discussedin Section 8.4.5 The method of sample collection can vary with theparameters of interest. The ideal sampling scheme employs acompletely inert material, does not subject the sample topressure change, does
24、 not expose the sample to the atmosphere,or any other gaseous atmosphere before conveying it to thesample container or flow cell for on-site analysis. Since theseideals are not always obtainable, compromises must be madeby the knowledgeable individual designing the sampling pro-gram. These concerns
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD444820012013STANDARDGUIDEFORSAMPLINGGROUNDWATERMONITORINGWELLS 地下水位 监测 采样 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-517093.html