1、Designation: C172/C172M 14Standard Practice forSampling Freshly Mixed Concrete1This standard is issued under the fixed designation C172/C172M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of last revision. A number in p
2、arentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers procedures for obtaining represen-tative samples of fresh concrete as delivered to the project siteon which tests are to be
3、performed to determine compliancewith quality requirements of the specifications under which theconcrete is furnished (Note 1). The practice includes samplingfrom stationary, paving and truck mixers, and from agitatingand nonagitating equipment used to transport central-mixedconcrete and from contin
4、uous mixing equipment as describedin Specification C685/C685M.1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combining
5、values from the two systems may result in non-conformancewith the standard.NOTE 1Composite samples are required by this practice, unlessspecifically excepted by procedures governing the tests to be performedsuch as tests to determine uniformity of consistency and mixer efficiency.Procedures used to
6、select the specific test batches are not described in thispractice, but it is recommended that random sampling be used todetermine overall specification compliance.1.3 This practice also covers the procedures to be used forpreparing a sample of concrete for further testing where it isdesirable or ne
7、cessary to remove the aggregate larger than adesignated size. This removal of larger aggregate particles ispreferably accomplished by wet-sieving.1.4 The text of this standard references notes and footnoteswhich provide explanatory material and shall not be consideredas requirements of the practice.
8、1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WarningFreshh
9、ydraulic cementitious mixtures are caustic and may causechemical burns to skin and tissue upon prolonged exposure.2)2. Referenced Documents2.1 ASTM Standards:3E11 Specification for Woven Wire Test Sieve Cloth and TestSievesC685/C685M Specification for Concrete Made by Volumet-ric Batching and Contin
10、uous Mixing3. Significance and Use3.1 This practice is intended to provide standard require-ments and procedures for sampling freshly mixed concretefrom different containers used in the production or transporta-tion of concrete. The detailed requirements as to materials,mixtures, air content, temper
11、ature, number of specimens,slump, interpretation of results, and precision and bias are inspecific test methods.4. Sampling4.1 The elapsed time shall not exceed 15 min. betweenobtaining the first and final portions of the composite sample.4.1.1 Transport the individual samples to the place wherefres
12、h concrete tests are to be performed or where test speci-mens are to be molded. They shall be combined and remixedwith a shovel the minimum amount necessary to ensureuniformity and compliance with the maximum time limitsspecified in 4.1.2.4.1.2 Start tests for slump, temperature, and air contentwith
13、in 5 min after obtaining the final portion of the compositesample. Complete these tests expeditiously. Start moldingspecimens for strength tests within 15 min after fabricating thecomposite sample. Expeditiously obtain and use the sampleand protect the sample from the sun, wind, and other sources of
14、rapid evaporation, and from contamination.1This practice is under the jurisdiction of ASTM Committee C09 on Concreteand ConcreteAggregates and is the direct responsibility of Subcommittee C09.60 onTesting Fresh Concrete.Current edition approved Feb. 1, 2014. Published February 2014. Originallyapprov
15、ed in 1942. Last previous edition approved in 2010 as C17210. DOI:10.1520/C0172_C0172M-14.2Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Se
16、rvice at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 1942
17、8-2959. United States15. Procedure5.1 Size of SampleMake the samples to be used forstrength tests a minimum of 28 L 1 ft3. Smaller samples arenot prohibited for routine air content, temperature, and slumptests. The size of the samples shall be dictated by the maximumaggregate size.5.2 The procedures
18、 used in sampling shall include the use ofevery precaution that will assist in obtaining samples that aretruly representative of the nature and condition of concretesampled as follows:NOTE 2Sampling should normally be performed as the concrete isdelivered from the mixer to the conveying vehicle used
19、 to transport theconcrete to the forms; however, specifications may require other points ofsampling, such as the discharge of a concrete pump.5.2.1 Sampling from Stationary Mixers, Except PavingMixersSample the concrete by collecting two or moreportions taken at regularly spaced intervals during dis
20、charge ofthe middle portion of the batch. Obtain these portions withinthe time limit specified in Section 4. Combine into onecomposite sample for testing purposes. Do not obtain portionsof the composite sample from the very first or last part of thebatch discharge (Note 3). Perform sampling by passi
21、ng areceptacle completely through the discharge stream, or bycompletely diverting the discharge into a sample container. Ifdischarge of the concrete is too rapid to divert the completedischarge stream, discharge the concrete into a container ortransportation unit sufficiently large to accommodate th
22、e entirebatch and then accomplish the sampling in the same manner asgiven above. Take care not to restrict the flow of concrete fromthe mixer, container, or transportation unit so as to causesegregation. These requirements apply to both tilting andnontilting mixers.NOTE 3No samples should be taken b
23、efore 10 % or after 90 % of thebatch has been discharged. Due to the difficulty of determining the actualquantity of concrete discharged, the intent is to provide samples that arerepresentative of widely separated portions, but not the beginning and theend of the load.5.2.2 Sampling from Paving Mixe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC172C172M2014STANDARDPRACTICEFORSAMPLINGFRESHLYMIXEDCONCRETE 混凝土 取样 标准 操作规程 PDF

链接地址:http://www.mydoc123.com/p-465643.html