ASME STP-NU-067-2014 ROADMAP FOR THE DEVELOPMENT OF ASME CODE RULES FOR FUSION ENERGY DEVICES《聚变能量设备的ASME代码规则发展用路线图》.pdf
《ASME STP-NU-067-2014 ROADMAP FOR THE DEVELOPMENT OF ASME CODE RULES FOR FUSION ENERGY DEVICES《聚变能量设备的ASME代码规则发展用路线图》.pdf》由会员分享,可在线阅读,更多相关《ASME STP-NU-067-2014 ROADMAP FOR THE DEVELOPMENT OF ASME CODE RULES FOR FUSION ENERGY DEVICES《聚变能量设备的ASME代码规则发展用路线图》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、STP-NU-067ROADMAP FOR THE DEVELOPMENT OF ASME CODE RULES FOR FUSION ENERGY DEVICESSTP-NU-067 ROADMAP FOR THE DEVELOPMENT OF ASME CODE RULES FOR FUSION ENERGY DEVICES Prepared by: W.K. Sowder Quality Management Services Co., LLC Date of Issuance: March 11, 2014 This report was prepared as an account
2、of work sponsored by ASME Nuclear Codes an example is the National Ignition Facility). While it may be feasible to modify the existing Section III rules to meet future fusion needs, it has been recommended that a complete separate set of rules be developed for these new fusion energy devices to cove
3、r design, construction and inspection/testing. In addition, it is anticipated that operation and maintenance requirements for these fusion energy devices may also require a new set of rules or major modifications to the existing ASME Operations and Maintenance (OM) Code. It is necessary that these n
4、ew rules contain the best available methods and technology in each area. As such, this Roadmap for the Development of ASME Code Rules for Fusion Energy Devices (FED Roadmap) was developed to outline what should be considered when developing these rules. The approach in this FED Roadmap consists of a
5、 compilation of suggestions from subject matter experts and organizations interviewed, as well as that of the author. As the project teams, task groups, and committees deliberate, it is anticipated that some of the tasks identified in this FED Roadmap will be revised or eliminated from consideration
6、 and others will be added. The Fusion Energy Device Code rules will be developed by various project teams within the Subgroup Fusion Energy Devices of the BPV Committee on Construction of Nuclear Facility Components (III) and will be coordinated with other impacted groups both inside and outside ASM
7、E. A Stakeholder Task Group reporting to the Chairman of the BPV Committee on Construction of Nuclear Facility Components (III) and the Chairman of the Subgroup Fusion Energy Devices has been formed to identify stakeholders and their needs, and develop recommendations and approaches to be incorporat
8、ed into new FED Code rules. STP-NU-067: Roadmap for the Development of ASME Code Rules for Fusion Energy Devices 2 2 METHODOLOGY The proposed methodology for the development of FED Code rules is based on the technical alternatives that were under development at the time. The FED Roadmap will be upda
9、ted as the technical committees reach a consensus on each technical and organizational alternative. The proposed organization for the various phases will be based on approved format of the rules (e.g. new Section III, Division 4 book). If the BPV III Standard Committees decides to change the format,
10、 the roadmap should be updated. The final section in this document summarizes the recommended organizational structure for the code development effort. 2.1 Global Stakeholders The following stakeholders will be considered in the development of the FED Roadmap. The interests of these stakeholders wil
11、l be considered to the extent practicable. Regulatory Community (US NRC, IAEA, KINS, JAEA-etc.) Electric Utilities and Associations (EDF, EPRI, NEI, etc.) Standards Developing Organizations (ASME, JSME, etc.) Designers and Constructors National and International Organizations (US DOE, EFDA) Consulta
12、nts Materials suppliers Equipment suppliers Service providers. 2.2 A Phased Approach A phased approach is being used to develop the FED Codes rules. Phase I includes activities related to developing this Roadmap for the new Section III, Division 4 (III-4) book to meet the needs identified by stakeho
13、lders worldwide for FED facilities that will be designed within the next few decades. It has been assumed in the development of this Roadmap that these needs are in a constant state of development. Phase II activities related to developing rules to be incorporated into the new III-4 and to meet the
14、needs identified by stakeholders worldwide for Fusion Energy Device facilities that will be designed more than a decade from now. It has been assumed in the development of the Roadmap that these needs include significantly different types of design and operating components than are in commercial fis
15、sion facilities. Therefore, additional time will be needed for conducting R Leads, Busbars, Energy Absorbing Equipment Resistors, High Current Switches, and Power Supplies Plasma Control Systems Balance of Plant Systems Piping, Pumps, Valves Cryostat Vacuum Vessel Ports & Thermal Shields Cryostat Ve
16、nt System Vacuum Systems Additionally, Fusion Device Extreme conditions (heat loads, EM forces/stresses, and Temperature during transients/accidents) and Plasma Configuration Requirements will also need to be specified. STP-NU-067: Roadmap for the Development of ASME Code Rules for Fusion Energy Dev
17、ices 5 4 PROPOSED TASK WORK 4.1 Research and Development (R&D) Tasks The term R&D as used in the Roadmap is intended to include the following categories of tasks: Physical tests to develop material properties and information about the long-term performance of materials in relevant environment includ
18、ing radiation degradation due to neutrons, helium particles, ionizing radiation, etc. The development and validation of new design and analysis methods/tools. Development of new methods for fabrication and examination (NDE). Development of drafts of Code rules based on existing methods and data, and
19、 the validation of those rules, are not considered to be R&D. However, if a consensus cannot be reached on certain aspects of the rules, it may be necessary to initiate R&D projects to obtain more data or to develop modified or alternative methods. Also, it should be recognized that it may be necess
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMESTPNU0672014ROADMAPFORTHEDEVELOPMENTOFASMECODERULESFORFUSIONENERGYDEVICES 聚变 能量 设备 ASME 代码 规则 发展

链接地址:http://www.mydoc123.com/p-456926.html