1、ASME B31.4 INTERPRETATIONSASME B31.4INTERPRETATIONS NO. 9Replies to Technical InquiriesOctober 7, 2008 Through May 15, 2012It has been agreed to publish interpretations issued by the B31 Committee concerning B31.4as part of the update service to the Code. The interpretations have been assigned numbe
2、rs inchronological order. Each interpretation applies either to the latest Edition or Addenda at thetime of issuance of the interpretation or the Edition or Addenda stated in the reply. Subsequentrevisions to the Code may have superseded the reply.These replies are taken verbatim from the original l
3、etters, except for a few typographical andeditorial corrections made for the purpose of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a technical nature. In these cases, a revisedreply bearing the original interpretation number with the suffix
4、R is presented. In the case wherean interpretation is corrected by Errata, the original interpretation number with the suffix E is used.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available that the inquirer believes might affect the inter
5、pretation. Further, personsaggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee.As stated in the Statement of Policy in the Code documents, ASME does not “approve,” “certify,”“rate,” or “endorse” any item, construction, proprietary device, or activity.For detaile
6、d instructions on preparations of technical inquiries to the B31 Committee, refer toNonmandatory Appendix A.Interpretations No. 1 was included with ANSI/ASME B31.4c-1986. Interpretations No. 2 wasincluded with ASME B31.4a-1987. Interpretations No. 3 was included with ASME B31.4a-1991.Interpretations
7、 No. 4 was included with ASME B31.4a-1994. Interpretations No. 5 was includedwith ASME B31.4-1998. Interpretations No. 6 was included with B31.4a-2001. Interpretations No. 7was included with ASME B31.4-2002. Interpretations No. 8 was included with ASME B31.4-2009.I-1Copyright ASME International Prov
8、ided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME B31.4 INTERPRETATIONSB31.4Subject Interpretation File No.Paragraph 423.2.3 and Table 423.1-1, Mandatory Impact Testing. 4-89 10-1604Paragraph 434.8, Previously Qualified Weldin
9、g Procedures . 4-86 09-1450Paragraph A410.1, Pig Launcher/Receiver 4-87 10-809Paragraphs 402.3 and 403.2.1, Hoop Stress and Nominal Wall Thickness . 4-88 10-1154I-2Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without licen
10、se from IHS-,-,-ASME B31.4 INTERPRETATIONSInterpretation: 4-86Subject: Paragraph 434.8, Previously Qualified Welding Procedures (ASME B31.4-2006 Edition)Date Issued: October 20, 2009File: 09-1450Question (1): Is it the intention of B31.4-2006, para. 434.8, that the pipeline owner/operatorsupply the
11、contractor with the owners pre-qualified Welding Procedure Specification andProcedure Qualification Record for use on a project?Reply (1): No.Question (2): Is it acceptable per B31.4 for the contractor to perform welding on a pipeline/metering station using his own previously qualified Welding Proce
12、dure Specification if all of theessential variables are the same?Reply (2): Yes, provided that the procedure is approved by the owner, as per para. 434.8.3(b)(2).Interpretation: 4-87Subject: Paragraph A410.1, Pig Launcher/ReceiverDate Issued: June 7, 2010File: 10-809Question: Does any part of a pig
13、launcher/receiver need to be stamped in accordance withSection VIII, Div. 1 or 2?Reply: No. Please see paras. 404.7.1 and 404.7.3 of B31.4-2009.Interpretation: 4-88Subject: Paragraphs 402.3 and 403.2.1, Hoop Stress and Nominal Wall Thickness(ASME B31.4-2009 Edition)Date Issued: July 28, 2010File: 10
14、-1154Question (1): Should the hoop stress be calculated per para. 402.3 of B31.4-2009?Reply (1): Yes.Question (2): Should the nominal wall thickness be calculated per para. 403.2.1?Reply (2): Yes.I-3Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or
15、 networking permitted without license from IHS-,-,-ASME B31.4 INTERPRETATIONSInterpretation: 4-89Subject: Paragraph 423.2.3 and Table 423.1-1, Mandatory Impact Testing (ASME B31.4-2009Edition)Date Issued: September 29, 2010File: 10-1604Question: In B31.4-2009, is impact testing only mandatory for th
16、e materials listed under “Pipe”in Table 423.1-1?Reply: Yes.I-4Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME B31.4 INTERPRETATIONSASME B31.4INTERPRETATIONS NO. 8Replies to Technical Inquirie
17、sJune 12, 2002 Through October 6, 2008It has been agreed to publish interpretations issued by the B31 Committee concerning B31.4as part of the update service to the Code. The interpretations have been assigned numbers inchronological order. Each interpretation applies either to the latest Edition or
18、 Addenda at thetime of issuance of the interpretation or the Edition or Addenda stated in the reply. Subsequentrevisions to the Code may have superseded the reply.These replies are taken verbatim from the original letters, except for a few typographical andeditorial corrections made for the purpose
19、of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a technical nature. In these cases, a revisedreply bearing the original interpretation number with the suffix R is presented. In the case wherean interpretation is corrected by Errata, the origin
20、al interpretation number with the suffix E is used.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available that the inquirer believes might affect the interpretation. Further, personsaggrieved by an interpretation may appeal to the cognizant
21、 ASME committee or subcommittee.As stated in the Statement of Policy in the Code documents, ASME does not “approve,” “certify,”“rate,” or “endorse” any item, construction, proprietary device, or activity.For detailed instructions on preparations of technical inquiries to the B31 Committee, refer toN
22、onmandatory Appendix A.Interpretations No. 1 was included with ANSI/ASME B31.4c-1986. Interpretations No. 2 wasincluded with ASME B31.4a-1987. Interpretations No. 3 was included with ASME B31.4a-1991.Interpretations No. 4 was included with ASME B31.4a-1994. Interpretations No. 5 was includedwith ASM
23、E B31.4-1998. Interpretations No. 6 was included with B31.4a-2001. Interpretations No. 7was included with ASME B31.4-2002.I-1Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME B31.4 INTERPRETATI
24、ONSB31.4Subject Interpretation File No.400.1.1, Injection Flow Lines. 4-84 07-1459402.3.1, Design Factor 4-79 03-331404.1, Pipe Design Conditions . 4-76 02-3680404.1.2, Design Factor and Residual Stresses 4-81 02-3682421.1, 20% SMYS. 4-77 02-2486421.1 and 423.2.3, Hoop Stress . 4-85 08-417423.2.3, I
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB3142012PIPELINETRANSPORTATIONSYSTEMSFORLIQUIDSANDSLURRIES 液体 泥浆 管道 输送 系统 PDF

链接地址:http://www.mydoc123.com/p-456539.html