ASME B30 16 INTERPRETATIONS-2012 Interpretations to B30 16 - Overhead Hoists (Underhung) (Includes Interpretations through January 2012)《B30 16的说明 吊运装置(轮动)》.pdf
《ASME B30 16 INTERPRETATIONS-2012 Interpretations to B30 16 - Overhead Hoists (Underhung) (Includes Interpretations through January 2012)《B30 16的说明 吊运装置(轮动)》.pdf》由会员分享,可在线阅读,更多相关《ASME B30 16 INTERPRETATIONS-2012 Interpretations to B30 16 - Overhead Hoists (Underhung) (Includes Interpretations through January 2012)《B30 16的说明 吊运装置(轮动)》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、ASME B30.16 INTERPRETATIONSASME B30.16 INTERPRETATIONSReplies to Technical InquiriesJanuary 2007 through January 2012FOREWORDThis publication includes all of the written replies issued between the indicated dates by theSecretary, speaking for the ASME B30 Standards Committee, Safety Standards for Ca
2、bleways,Cranes, Derricks, Hoists, Hooks, Jacks, and Slings, to inquiries concerning interpretations oftechnical aspects of ASME B30.16, Overhead Hoists (Underhung).These replies are taken verbatim from the original letters except for a few typographicalcorrections and some minor editorial correction
3、s made for the purpose of improved clarity. Insome few instances, a review of the interpretation revealed a need for corrections of a technicalnature; in these cases, a corrected interpretation follows immediately after the original reply.These interpretations were prepared in accordance with the ac
4、credited ASME procedures.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available that the inquirer believes might affect the interpretation. Further, personsaggrieved by this interpretation may appeal to the cognizant ASME Committee or Subco
5、mmittee.ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction, proprietarydevice, or activity.I-1ASME B30.16 INTERPRETATIONSInterpretation: 16-27Subject: ASME B30.16-2003Date Issued: January 31, 2007Question (1): Are below-the-hook lifting devices and rigging accessories co
6、nsidered part ofthe load?Reply (1): Yes, below-the-hook lifting devices and accessories are considered part of the sus-pended load and must be factored into the total load on the hoist (see definition of “load”).However, para. 16-3.1.4 allows for these devices to be left suspended from the hoist dur
7、ing periodsof nonuse as long as proper precautions are taken to avoid creating a hazard.Question (2): Does B30.16 require daily testing of lower limit devices?Reply (2): No, B30.16 does not require daily testing of lower limit devices. However, para. 16-2.2.1does require the lower limit be tested on
8、 hoists that have been significantly altered or repaired,or have been out of service for a period of 12 mo or more.Interpretation: 16-28Subject: ASME B30.16-2003, Paragraph 16-1.3.2Date Issued: June 29, 2009Question: Would an underhung electric hoist with a rated capacity of 5 ton under a monorailwi
9、th a rated capacity of 3 ton be in compliance with the Standard?Reply: If the monorail is designed for a rated load of 3 ton, the system consisting of the 3-tonrated monorail and a 5-ton rated hoist does not meet the requirements of para. 16-1.3.2.Interpretation: 16-29Subject: ASME B30.16-2003 (R200
10、7), Sections 16-2.1 and 16-2.2Date Issued: January 31, 2012Question (1): Must new hoists that have satisfied para. 16-2.1.1(a) and Section 16-2.2, and havebeen in inventory for a period of 1 mo or more, but less than 1 yr, undergo any additionalinspection or testing by the manufacturer prior to bein
11、g placed into service?Reply (1): No; however, when being placed into service, hoists shall be installed perSection 16-1.3.Question (2): Must new hoists that have satisfied para. 16-2.1.1(a) and Section 16-2.2, and havebeen in inventory for a period of more than 1 yr, undergo any additional inspectio
12、n or testingby the manufacturer prior to being placed into service?Reply (2): No; however, when being placed into service, hoists shall be installed perSection 16-1.3.I-2STD-ASME B30.lb INT-ENGL 0757b70 Ob08370 653 ASME B30.16 INTERPRETATIONS Replies to Technical Inquiries April 1995 - September 199
13、8 FOREWORD This publication includes all of the written replies issued between the indicated dates by the Secretary, speaking for the ASME B30 Committee, Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings, to inquiries concerning interpretations of technical aspects o
14、f ASME B30.16, Overhead Hoists (Underhung). These replies are taken verbatim from the original letters except for a few typographical corrections and some minor editorial corrections made for the purpose of improved clarity. In some few instances, a review of the interpretation revealed a need for c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB3016INTERPRETATIONS2012INTERPRETATIONSTOB3016OVERHEADHOISTSUNDERHUNGINCLUDESINTERPRETATIONSTHROUGHJANUARY2012B3016

链接地址:http://www.mydoc123.com/p-456426.html