1、24 2010 ASHRAEABSTRACT Traditional raised floor cooling is not designed toadequately cool the high heat densities now being seen in manydata centers. There are certain baseline measures that can betaken to optimize the functioning of the traditional coolingsystem. However, adding cooling solutions s
2、pecificallydesigned for high heat density is often the most efficient solu-tion to cool the hot racks and zones that occur in high densityenvironments and generate a sizable amount of heat.This paper presents the baseline measures that can betaken to optimize the traditional cooling and it provides
3、anoverview and the pros and cons of cooling fluids and systemarchitectures for high heat density cooling. The paper alsoprovides information to guide decisions about the most appro-priate cooling technologies for particular data center appli-cations.INTRODUCTIONAccording to ASHRAEs publication “Data
4、com Equip-ment Power Trends and Cooling Applications”, by 2010,computer and communications rack heat loads are projected toreach 15 to 48 kW heat load per rack.Driving this trend is the fact that advances in technologyare allowing more and more computing power to be placedinto smaller and smaller pa
5、ckages. Other contributing factorsinclude the trend of businesses to reduce capital costs byputting virtualized servers in smaller spaces, and consolida-tion of multiple remote data centers into centralized mega datacenters. This compaction increases power requirementsthereby generating more heat.BA
6、SELINE STRATEGIES TO INCREASE COOLING EFFICIENCIESCertain changes can be made to the physical infrastruc-ture to increase the efficiency of the cooling system, whichwill help better manage the heat generated by high densityequipment. These include properly sealing the data center andoptimizing the a
7、ir flow within the data center.Seal the Data Center EnvironmentCooling system efficiency is reduced when air is leakingthrough floors, walls and ceilings, or when humidity is trans-ferred from (or to) outside the critical facility. Therefore, thedata center should be isolated from the general buildi
8、ng andoutside environment as much as possible.Doors should be kept closed at all times and vapor sealsshould be used to isolate the data center atmosphere. Thevapor seal is one of the most important methods for controllingthe data center environment.Without a good vapor seal, humidity will migrate i
9、nto thedata center during the hot summer months and escape duringthe cold winter months. In ASHRAEs publication “DesignConsiderations for Datacom Equipment Centers”, theexpanded recommended relative humidity level for Class 1and Class 2 data center environments is 41.9F (5.5C) dewpoint to 60% RH and
10、 59F (15C) dew point. Computer roomprecision air conditioners (CRACs) control humidity throughhumidification or dehumidification as required. An effectivevapor seal can reduce the amount of energy expended onhumidification or dehumidification.System Architectures and Fluids for High Heat Density Coo
11、ling SolutionsLennart StahlMember ASHRAELennart Stahl is senior marketing manager for Liebert Cooling Products, Emerson Network Power in McKinney, TX.OR-10-004 2010, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions 201
12、0, Vol. 116, Part 1. For personal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted without ASHRAEs prior written permission. ASHRAE Transactions 25Optimize Air FlowOnce the room is sealed, the next step is to ensure efficientair moveme
13、nt. The goal is to move the maximum amount ofheat away from the equipment, utilizing a minimum amount ofenergy. Optimizing air flow requires an evaluation of how rackarrangement, CRAC placement/air distribution and cablemanagement, might be impacting the air flow in the room.Rack Arrangement. Most e
14、quipment manufacturedtoday is designed to draw in air through the front and exhaustit out the rear. This allows equipment racks to be arranged tocreate hot aisles and cold aisles. This approach positions racksso that rows of racks face each other, with the front of eachopposing row of racks drawing
15、cold air from the same aisle(the “cold” aisle). Hot air from two rows is exhausted into a“hot” aisle, raising the temperature of the air returning to theCRAC unit and allowing it to operate more efficiently (Figure1). This principle is called a hot-aisle/cold-aisle configuration.Blanking Panels/Rack
16、s. To implement an effective hot-aisle/cold-aisle configuration, it is vital that the hot air not mixwith the cold air. Therefore, perforated floor tiles should beremoved from hot aisles and used only in cold aisles. Blankingpanels should be placed in the open spaces in racks to preventhot air from
17、being drawn back through the rack. Even emptyspaces between racks should be filled with blanking panels orracks to prevent the mixing of hot and cold air.Seal Raised Floor. Some type of cabling grommet/sealshould also be used in the cable penetrations in the raised floorto prevent the cold air from
18、entering the space through cableopenings, which are typically at the rear of the rack. Also theseparation between the under floor plenum and adjacentrooms should be sealed so cold air does not leak from the pres-surized raised floor into adjacent rooms.CRAC Placement. When using the hot-aisle/cold-a
19、isleconfiguration, CRAC units should always be placed perpen-dicular to the hot aisle to reduce air travel and prevent hot airfrom being pulled down into the cold aisles as it returns to theair conditioner. If the CRAC units cannot be placed perpen-dicular to the hot aisle, the return ceiling plenum
20、 can be effec-tive in minimizing the mixing of hot and cold air (Figure 2).Cable Management. The growing increase in thenumber of servers that data centers need to support has createdcable management challenges in many facilities. If not prop-erly managed, cables can obstruct air flow through perfor
21、atedfloor tiles and prevent air from being properly exhausted outthe rear of the rack. The under-floor plenum should be checkedto determine if cabling (or piping) is obstructing air flow.Overhead cabling is becoming an increasingly popular meansto eliminate the potential for obstruction. Deeper rack
22、s arealso now available to allow for increased airflow. Sometimesexisting racks can even be equipped with expansion channelsto add depth for cables and airflow.It is also recommended to investigate the option of bring-ing high-voltage 3-phase power as close to the IT equipmentas possible and increas
23、ing the voltage of the IT equipment.These steps will minimize the quantity and size of the powercable feeds under the floor. This can sometimes be accom-plished by using high-voltage 3-phase managed power stripswithin the rack, but may also require the use of multiple-poledistribution panels or PDUs
24、 located within the row of ITFigure 1 Raised floor cooling with racks in hot aisle/coldaisle configuration.Figure 2 Hot air return to CRACs via ceiling plenum. 2010, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions 201
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEOR100042010SYSTEMARCHITECTURESANDFLUIDSFORHIGHHEATDENSITYCOOLINGSOLUTIONS 高热 密度 冷却 溶液 系统 结构 流动性

链接地址:http://www.mydoc123.com/p-455666.html